Most buyers fly home from a foundry visit remembering the cleanliness of the aisles — and little else. A foundry audit checklist turns that two-day trip into 47 scored checks across six production zones, one number you can defend to management, and a pass/fail decision that decides where the purchase order goes.
This guide is the working version of that foundry audit checklist, built from buyer-side audits of sand casting, investment casting and die casting suppliers. It covers what to inspect in each zone, which documents to demand before you book the flight, how to convert observations into a 100-point score, and what a rejected part really costs when the audit was skipped. It follows the same hands-on approach as our casting supplier audit framework and the Guide sur la fonderie des métaux that anchors this content cluster, with reference standards published by NADCA et ASTM.

Why a Foundry Audit Checklist Beats a Factory Tour
A factory tour is conducted by the host. An audit is conducted by you. The difference is not the walking route — both usually start at the melt deck — but whether every stop produces a recorded observation tied to a question your drawings and purchase order actually depend on. Without a written foundry audit checklist, audits drift toward whatever the guide wants to show: the new machining cell, the spotless showroom samples, the ISO certificate wall. None of those will tell you whether the heat that your pump housing comes from was spectrometer-checked, or whether the sand system ran out of control the week before your visit.
A structured foundry audit checklist does three things a tour cannot:
- It forces evidence over impressions. “The melt deck looked professional” is not data. “Spectrometer drift verified against a certified reference material every four hours, logbook sampled for March, gaps: zero” is data.
- It makes two suppliers comparable. When the shortlist has three candidates in two provinces, a 100-point scoring sheet lets you compare a gray iron sand casting shop against an fonderie à cire perdue house on the same axis — the quality system, not the sales pitch.
- It survives staff turnover. When your sourcing engineer leaves, the next one re-runs the same checklist and the scores remain comparable year over year.
The checklist below is organized the way material actually flows through a foundry: melt, mold, pour, clean, inspect, document. That order matters, because defects created upstream are always cheaper to catch upstream — a principle explained in detail in our article on casting RFQ packages, where the audit is listed as a pre-award milestone rather than a post-award formality.
Foundry Audit Checklist: The Six Zones You Must Walk
The full working version of the foundry audit checklist contains 47 checks across six zones. You do not need all 47 for every part — but you should walk every zone, because the zones interact: a spotless inspection lab cannot compensate for an uncontrolled sand system, it can only catch the fallout expensively.
Zone 1 — Melting and Charge Control (8 checks, 15 points)
Everything in casting chemistry starts at the furnace. Ask to see the charge calculation sheet for the alloy you are buying — for gray and ductile iron, that is the carbon equivalent (CE) window; for steel, the carbon and chromium band. Then ask how it is verified: a direct-reading spectrometer is the baseline, and the audit question is not “do you have one” but “how often is it checked against a certified reference material, and can I see the log”. A disciplined shop verifies drift every four hours of melting, or once per shift minimum; a shop that answers “when we suspect a problem” is telling you the chemistry certificate you receive was generated by an unverified instrument.
- Charge records: traceable from heat number to incoming charge materials with supplier certificates — not just internal transfer notes.
- Returns ratio: how much foundry return (gates, runners, scrapped castings) enters the charge. Above roughly 35–40% without documented chemistry control, properties drift.
- Pouring temperature control: immersion pyrometer or dip cell at the ladle, logged per heat, within the band your metallurgy requires.
For ductile iron buyers, add the magnesium treatment step to the same zone: treatment method (sandwich, tundish-cover or cored wire), fade control between treatment and pouring, and the residual Mg window the shop targets. This single zone decides whether your iron casting supplier can hold ASTM A536 grades at the heavy sections your drawing actually has.
Zone 2 — Molding and Core Making (9 checks, 15 points)
In a green sand or resin sand foundry, the sand lab is the heart of process control, and it is the zone most often faked for visitors. The foundry audit checklist test is simple: ask for the last 30 days of sand test data, then check whether the tests were actually run at the stated frequency. Typical control points look like this:
| Sand property | Typical frequency | What the auditor looks for |
|---|---|---|
| Moisture and compactability | Every batch or every 2 h | Continuous log, reaction to weather changes |
| Green strength, live clay (AFS) | Daily to weekly | Bentonite addition ratio, accumulation trends |
| Grain fineness and permeability | Weekly | New sand dilution rate, dust collector fines |
| Core room: resin and catalyst dosing | Per mixer batch | Calibrated dispensers, dated catalyst stock |
If the sand data exists but stops every Sunday, or the compactability numbers are identical to one decimal for three straight weeks, the tests are being transcribed, not run. That distinction matters more for your part quality than any new machine on the floor — the details are covered in our moulage au sable process page. Buyers of patterned parts should also walk the pattern storage area in this zone: tooling condition, ID markings and custody rules are covered in the article on casting tooling asset management, and a foundry that cannot find your pattern in ten minutes will not ship your reorder on time.
Zone 3 — Pouring (5 checks, 10 points)
Pouring is the shortest stop on the foundry audit checklist — usually under a minute per mold — but it concentrates several failure modes: temperature loss in the ladle, slag entrainment, and interrupted pours. Watch three or four pours on your actual part family if production is running. The checklist items are concrete: ladle lining condition and relining log, slag skimming practice, pour cup discipline (no dross dams missing, no double pours without procedure), and the time gap between magnesium treatment and pour for ductile iron. In high-pressure moulage sous pression, this zone becomes shot monitoring instead: shot curve storage, slow-shot velocity settings, and vacuum valve checks for porosity-critical castings.
Zone 4 — Fettling, Finishing and Repair Control (7 checks, 10 points)
After shakeout, castings move through cut-off, grinding, heat treatment and sometimes repair welding. The foundry audit checklist question that matters in Zone 4 is disclosure: is weld repair permitted on your part, under which procedure and qualification, and is it recorded per casting? An uncontrolled grinding wheel that “improves” a wall thickness, or unrecorded weld repair on a pressure-containing housing, creates liability that surfaces years later at your customer. Our articles on casting defect claims show why the repair records you never asked for become the evidence gap that kills a claim. Heat treatment ovens belong in this walk too: calibration certificates, thermocouple placement charts, and quenchant condition logs.
Zone 5 — Inspection and Metrology (10 checks, 20 points)
This zone carries the heaviest weight on the foundry audit checklist because it is where capability becomes visible. Ask for control charts on a dimension you care about — not the one the foundry picks. Work an example: a machined spigot at Ø85.00 ±0.05 mm. Shop A runs it centered with a standard deviation of 0.012 mm: Cpk = 0.05 ÷ (3 × 0.012) = 1.39, roughly 31 defective parts per million. Shop B runs the same feature with σ = 0.021 mm and a mean shifted +0.020 mm: Cpk = 0.030 ÷ 0.063 = 0.48, about 77,000 ppm — one casting in thirteen out of spec. Both shops own a CMM; only the data tells you which one to trust.
The ten checks span gage calibration status, CMM programming ownership, hardness and spectrometer sample discipline, NDT personnel certification, and the boundary between as-cast and machined acceptance criteria — the same boundary drawn in our articles on méthodes de contrôle des pièces moulées et casting first article inspection. Buyers who machine castings at a third party should also audit the handoff: the article on casting incoming inspection plans lists the ten fields that make that transfer auditable, and our CNC machining services page shows what an integrated foundry-plus-machining flow looks like from the buyer’s side.

Zone 6 — Traceability and Records (8 checks, 15 points)
The last zone of the foundry audit checklist is a desk exercise with a stopwatch. Pick three heat numbers from the last ninety days at random — ideally including one that had a customer complaint or internal rejection — and ask the quality manager to resolve each heat from charge record through chemistry certificate, sand or shot data, heat treatment chart, final inspection record and shipment. A functioning system closes the loop in under ten minutes per heat. If the answer is “our system does not go back that far” or “the person who knows is not here today”, you have learned more about this supplier than the previous five zones combined. Traceability requirements also belong in your contract, not just your audit: the article on casting quality agreements maps them to enforceable clauses, and scrap rate accounting shows how the same records settle who pays for a rejected batch.
Documents to Request Before You Book the Flight
Half of the foundry audit checklist is completed before the auditor leaves the office. A pre-audit document package filters out suppliers that would fail on day one and lets you spend the on-site hours verifying rather than discovering. Request it two weeks ahead and review it in one sitting:
| Document | What to check before approving the trip |
|---|---|
| ISO 9001 / IATF certificate | Scope covers casting production at this address — not a trading-company certificate; verify the certificate number with the registrar. |
| Equipment list with ages | Melting capacity, molding line type, machining cells — cross-check against the volumes your RFQ needs. |
| Last 12 months of scrap-rate summary | Denominator definition stated? A “2% scrap rate” that counts only final inspection hides rework upstream. |
| Two recent FAI or ISIR reports | Balloon-numbered drawing, measured values with gage IDs, material certs attached. |
| Customer complaint log (redacted) | Volume, response time, repeat causes. No log at all is itself a finding. |
Send the zone list with the invitation, but not the scoring weights — a supplier should know what will be examined, while the relative weight you place on, say, traceability versus housekeeping stays your call. Suppliers that stall on the package for more than two weeks are self-selecting out of the shortlist at zero cost to you.
Scoring the Foundry Audit Checklist: From Walk-Through to Number
The foundry audit checklist only becomes a decision tool when observations are weighted. The scoring model below allocates 100 points across the six zones plus a culture cluster, with the heaviest weight on inspection and metrology because that is where systemic weakness is hardest to hide:
| Zone | Checks | Points | Typical deal-breaker |
|---|---|---|---|
| Melting and charge control | 8 | 15 | No spectrometer drift log |
| Molding and core making | 9 | 15 | Sand data transcribed, not tested |
| Pouring | 5 | 10 | No temperature log at ladle |
| Fettling, finishing, repair control | 7 | 10 | Undisclosed weld repair |
| Inspection and metrology | 10 | 20 | No control charts on real parts |
| Traceability and records | 8 | 15 | Heat loop cannot be closed in 10 min |
| QMS culture, HSE and housekeeping | — | 15 | Findings recur between visits |
Score each check 0, 0.5 or 1 (absent, partial, verified), multiply by zone weight, and apply the decision bands: 80 or above — approve and move to tooling; 65 to 79 — conditional approval with a corrective action plan and a focused re-audit within 90 days; below 65 — stop, regardless of price. The bands exist because a 72-point foundry is usually a 72-point foundry for reasons that take years and management will to fix; a discount does not close that gap, it just moves the cost downstream into sorting, expediting and claims.
What a Foundry Audit Costs — and What Skipping One Costs
The standard objection to running the foundry audit checklist is travel budget. Run the arithmetic for a typical two-day audit of a single supplier by one engineer, from North America or Europe to an Asian casting hub:
| Cost item | Basis | Cost |
|---|---|---|
| Flights | Round trip, economy, booked 3 weeks out | 1,480 USD |
| Hotel | 3 nights × 118 USD | 354 USD |
| Per diem | 4 days × 85 USD | 340 USD |
| Auditor time | 2 days × 600 USD loaded cost | 1,200 USD |
| Total audit cost | One supplier, one decision | 3,374 USD |
Now compare the other side of the ledger. A failed launch at an unaudited supplier — retooling 24,000, re-running first article inspection 5,200, air freight to protect the build schedule 9,800, six weeks of line-down contribution 19,000 — totals roughly 58,000 USD, about 17 times the cost of the audit that might have prevented it. Even if the audit only halves the probability of that failure, the expected value is strongly positive. And the audit report has a second life: it becomes the baseline for the corrective-action clauses in your quality agreement and the checklist for every re-audit, so the cost amortizes across the life of the supply relationship.
Red Flags That Should End the Audit Early
Some findings are not scoring items; they are stop conditions. The foundry audit checklist treats them as automatic fails regardless of the total score:
- Safety-critical shortcuts demonstrated for your benefit — missing ladle PPE, bypassed light curtains. A shop that cuts corners where regulators can see will cut more where only you will feel it.
- Staged records — control charts in one handwriting with one pen, or test logs whose “out of control” days are simply missing. This is falsification, not weakness.
- Subcontracting your parts without disclosure — discovering that the castings you sampled were poured at a workshop down the road. Traceability and liability both evaporate.
- Unwillingness to let you talk to operators alone. An escort at every step is normal; translating every question through the sales manager is not.
Any one of these justifies ending the visit and closing the file. A supplier that hides problems during courtship will not reveal them during production.
Foundry Audit Checklist Add-Ons per Casting Process
The six zones form the common core of any foundry audit checklist. Each casting process adds its own make-or-break checks, so adapt the weighting to the process your parts actually use:
- Sand casting (green sand / resin sand): sand lab discipline and pattern custody dominate — the two zones where the generic foundry audit checklist catches most failures. Add mold hardness readings at the flask edge, where compaction is weakest.
- Investment casting: wax injection parameters and shell build records. Count shell layers against the procedure for one live job, and check dewax autoclave cycles. Ceramic inclusions found at your incoming inspection almost always trace to shell handling here.
- Die casting: die temperature monitoring, shot curve storage on the last 100 shots of a live job, die maintenance interval log, and vacuum system checks for structural castings. A shop investing here is described in our article on foundry automation — process data that survives staff turnover.
- Machined castings: audit the machining cell as a seventh zone: first-out inspection after every tool change, and coolant control on machinability-rated alloys.
If your portfolio spans processes, resist the temptation to reuse one supplier’s scorecard for another process. A 90-point sand casting foundry can be a 60-point die casting plant under the same roof; the foundry audit checklist you carry should change with the process you are buying, and tooling questions should route through the casting molds making capability of the site, not the group brochure.

FAQ
How long does a foundry audit take?
Plan two full days on site for a single-process foundry below roughly 200 tons per month, including the opening meeting, the six-zone walk, a daily wrap-up and the closing review of findings. Multi-process plants, or audits that include machining and heat treatment subcontractors, need three to four days. Squeeze it into one day and you will audit the lobby, not the factory.
Can a foundry audit be done remotely?
Partly. Document review, sand and spectrometer data checks and record sampling can be done by video with screen sharing. Melt deck observation, pour watching and gage walkthroughs cannot — camera angles hide exactly what you came to see. Treat a remote review as a pre-screen worth maybe 40 of the 100 points, and require the on-site half before tooling money changes hands.
What score should a good foundry reach?
With the 100-point model above, approve at 80 or above, conditionally accept between 65 and 79 with a corrective action plan and re-audit inside 90 days, and reject below 65. The conditional band is where most honest mid-size foundries land on a first audit; what matters is whether the 90-day re-audit closes the specific gaps or just produces a nicer binder.
Which single zone tells me the most?
Inspection and metrology. A foundry can sweep the floor and print certificates, but months of control charts on real part numbers cannot be faked in an afternoon. Ask for a dimension you choose, on a part number you choose, and watch how long it takes to produce the data — the answer predicts the whole relationship.
How often should an approved foundry be re-audited?
Every 24 months for stable suppliers, and immediately after any trigger event: ownership change, relocation of melt or machining, a change in the process route for your part, or two substantiated quality escapes within twelve months. Re-audits use the same foundry audit checklist, so scores stay comparable across years — the trend matters more than any single number.
À la recherche d'une fonderie de métaux fiable en Chine ?
- Nous pouvons vous aider à optimiser la conception de vos produits et à réduire vos coûts.
- Nous pouvons vous aider avec des pièces moulées de haute qualité et en grande quantité.
- Nous pouvons livrer à temps et obtenir de nouvelles opportunités de marché.
- Vous bénéficierez du service de moulage de métaux proposé par Supro MFG.
*Data referenced from NADCA and ASTM published standards and Supro MFG audit records.