{"id":8017,"date":"2026-10-16T08:20:59","date_gmt":"2026-10-16T08:20:59","guid":{"rendered":"https:\/\/chinametalfoundry.com\/?p=8017"},"modified":"2026-10-16T08:20:59","modified_gmt":"2026-10-16T08:20:59","slug":"casting-minimum-order-quantity","status":"publish","type":"post","link":"https:\/\/chinametalfoundry.com\/ru\/blog\/casting-minimum-order-quantity\/","title":{"rendered":"Casting Minimum Order Quantity: Why Foundries Set MOQs and How to Beat Them"},"content":{"rendered":"<article class=\"sc-article\" style=\"max-width: 820px; margin: 0 auto; font-family: 'Poppins',sans-serif; color: #7e7e7e; font-size: 16px; line-height: 1.7;\">\n<div class=\"sc-intro\" style=\"background: #F5F5F5; border-radius: 20px; padding: 22px 24px; font-style: italic; color: #3a3a3a; margin: 0 0 26px; line-height: 1.6;\">\n<p style=\"margin: 0;\">Most buyers meet the <strong style=\"color: #273171;\">casting minimum order quantity<\/strong> for the first time inside a quote, as a single line that reads &#8220;MOQ 500 pcs&#8221;. It looks like a commercial rule the supplier invented. It is not. It is an arithmetic result: a furnace that must be tapped, a setup that has to be paid for, and a tooling cost that has to land somewhere. This guide shows how a casting minimum order quantity is really derived, process by process, and which six levers actually move it.<\/p>\n<\/div>\n<p style=\"margin: 0 0 18px;\">Everything below is production arithmetic you can check yourself \u2014 melt batch sizes, setup recovery, tooling amortization and inventory carrying cost \u2014 with industry practice cross-referenced against <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.afsinc.org\" target=\"_blank\" rel=\"noopener\">AFS<\/a> \u0438 <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.nadca.com\" target=\"_blank\" rel=\"noopener\">NADCA<\/a> publications rather than rules of thumb. If you already know how a casting is made, start with our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/%d1%80%d1%83%d0%ba%d0%be%d0%b2%d0%be%d0%b4%d1%81%d1%82%d0%b2%d0%be-%d0%bf%d0%be-%d0%bb%d0%b8%d1%82%d1%8c%d1%8e-%d0%bc%d0%b5%d1%82%d0%b0%d0%bb%d0%bb%d0%be%d0%b2\/\" target=\"_blank\" rel=\"noopener\">\u0440\u0443\u043a\u043e\u0432\u043e\u0434\u0441\u0442\u0432\u043e \u043f\u043e \u043b\u0438\u0442\u044c\u044e \u043c\u0435\u0442\u0430\u043b\u043b\u043e\u0432<\/a>; if you are comparing routes for a low-volume part, jump to the process table \u2014 it shows where each casting minimum order quantity comes from.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p234-moq-cover.webp\" alt=\"Casting minimum order quantity shown as a pallet of many identical gray iron pump housings beside a crate holding only a few\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Batch size is the whole story behind most MOQ lines: one pallet versus one crate.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">What a Casting Minimum Order Quantity Really Covers<\/h2>\n<p style=\"margin: 0 0 18px;\">A foundry does not set a number to be difficult. It sets the quantity below which the order loses money or blocks a machine for longer than the job is worth. Six drivers produce almost every MOQ you will see on a quote, and each one has a different fix.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Driver<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">What it sets<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Typical floor<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">What the buyer can change<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Melt batch<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pieces per furnace tap<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">30\u201380 pcs<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Share the tap with other part numbers<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Setup and changeover<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Quantity that keeps setup under 8\u201312% of unit price<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">300\u20131,000 pcs (die casting)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Fewer, larger releases per year<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tooling amortization<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tooling cost \u00f7 target cost per piece<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Drives die casting hardest<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Common mould base, longer tool life<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Cavities or tree count<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pieces per shot or per wax tree<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">12\u201336 pcs per tree<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Run a part-filled tree or fewer cavities<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">First article and inspection<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">One-off $600\u2013$1,200 per programme<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Often hidden, rarely stated<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">One FAI per year, batch release after<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Packing and freight<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Full pallet or full container<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">One pallet minimum<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Consolidated shipments, accept LCL surcharge<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Notice that only one of the six is about metal. A <strong style=\"color: #273171;\">casting minimum order quantity<\/strong> is mostly a fixed-cost recovery problem, which is why the same part can carry an MOQ of 30 pieces from one process and 500 from another. That is also why the number is negotiable once you know which driver produced it.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">How Foundries Derive a Casting Minimum Order Quantity<\/h2>\n<p style=\"margin: 0 0 18px;\">Below are three real derivations \u2014 sand casting, high-pressure die casting and investment casting \u2014 each worked from shop-floor numbers you can audit in a quote. The pattern is identical in all three: add up the cost that does not change with quantity, then ask how many pieces it takes to make that number small.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">Sand casting \u2014 the melt batch is the floor<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">Take an 18 kg <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d1%80%d0%b5%d1%88%d0%b5%d0%bd%d0%b8%d1%8f\/%d1%87%d1%83%d0%b3%d1%83%d0%bd%d0%bd%d0%be%d0%b5-%d0%bb%d0%b8%d1%82%d1%8c%d0%b5\/\" target=\"_blank\" rel=\"noopener\">ductile iron<\/a> pump housing. Poured weight per piece is <strong style=\"color: #273171;\">40 kg<\/strong> \u2014 18 kg of casting plus 22 kg of runner, gate and riser, which is a normal yield of about 45%. A 3 t coreless induction furnace gives roughly 2,400 kg of usable iron per tap, so one tap produces 2,400 \u00f7 40 = <strong style=\"color: #273171;\">60 pieces<\/strong>.<\/p>\n<p style=\"margin: 0 0 18px;\">The fixed cost of making that tap happen does not scale down:<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Melt start-up, power and lining wear: $180<\/strong><\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Pattern set-up and moulding line changeover: $240<\/strong><\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Trial pour and two first pieces: $290<\/strong><\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Melt control, spectro check and paperwork: $150<\/strong><\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">That is <strong style=\"color: #273171;\">$860 per batch<\/strong>. With a unit price of $64 and variable cost of $38.50 per piece, each piece contributes $25.50, so the batch must be at least 860 \u00f7 25.50 = <strong style=\"color: #273171;\">34 pieces<\/strong> to break even on fixed cost alone. Below that the supplier has to add the shortfall to the price: at 20 pieces the shortfall is $350, or $17.50 per piece, pushing the price from $64 to <strong style=\"color: #273171;\">$81.50 \u2014 a 27% premium<\/strong> for two-thirds less metal. In practice most foundries will quote the full 60-piece tap rather than sell 20 pieces at that price, because the remaining 800 kg of iron has nowhere to go. That is the whole origin of a sand casting minimum order quantity: it is a furnace size, not a policy. Over a year, 240 pieces bought as four taps costs 4 \u00d7 $860 = $3,440 in fixed cost; the same 240 pieces bought as twelve 20-piece batches costs 12 \u00d7 $860 = $10,320, or <strong style=\"color: #273171;\">$6,880 more per year<\/strong> for identical castings.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">Die casting \u2014 setup cost divided by shots<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">Now an aluminium housing on a 300 t machine with a two-cavity tool at a 45 s cycle. That is 80 shots per hour and <strong style=\"color: #273171;\">160 pieces per hour<\/strong>. The tool costs $48,000 and is good for about 100,000 shots, i.e. 200,000 pieces, so tooling adds $48,000 \u00f7 200,000 = <strong style=\"color: #273171;\">$0.24 per piece<\/strong> \u2014 small. The setup is not small:<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Tool install, preheat and die-lube setup: $310<\/strong><\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Trial shots and first-piece layout: $220<\/strong><\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Start-up scrap, biscuit and runner recycle: $90<\/strong><\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">Total <strong style=\"color: #273171;\">$620 per run<\/strong>. Most die casters will not let setup exceed roughly 10% of unit price, so with a $12 target unit price the cap is $1.20 per piece and the run must be at least 620 \u00f7 1.20 = <strong style=\"color: #273171;\">517 pieces<\/strong> \u2014 which is why &#8220;MOQ 500&#8221; appears so often on die casting quotes. Work the two extremes: at 30 pieces the setup adds $20.67 per piece, so unit cost is $1.10 metal + $1.90 machine and labor + $20.67 setup + $0.24 tooling = <strong style=\"color: #273171;\">$23.91<\/strong>. At 1,000 pieces setup drops to $0.62 and unit cost is <strong style=\"color: #273171;\">$3.86<\/strong> \u2014 a 6.2\u00d7 swing from quantity alone \u2014 which is why a die casting minimum order quantity is quoted as a round number near the setup-recovery threshold, not as a melt size. If you want the tooling side of that arithmetic, see <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/2026-die-cast-tooling-cost-6-factors-lifecycle\/\" target=\"_blank\" rel=\"noopener\">die cast tooling cost and lifecycle factors<\/a>.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">Investment casting \u2014 the tree sets the count<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">A 0.55 kg CF8M valve body is not run piece by piece; it is assembled onto a wax tree, and the casting minimum order quantity follows the tree rather than the customer. Say 24 pieces per tree. Shell building, dewax and firing costs about <strong style=\"color: #273171;\">$145 per tree<\/strong> regardless of how many patterns hang on it. Poured metal is 24 \u00d7 0.55 = 13.2 kg of castings plus 6.8 kg of running system, i.e. 20 kg per tree at $6.40\/kg of melted stainless = $128. Finishing \u2014 cut-off, grind, blast, passivate \u2014 runs $4.20 per piece, or $100.80 per tree. Total per tree $373.80, or <strong style=\"color: #273171;\">$15.58 per piece<\/strong> at a full tree.<\/p>\n<p style=\"margin: 0 0 18px;\">Ask for six pieces instead and you still pay for a full shell and a full running system: shell is $145 \u00f7 6 = $24.17, metal is (3.3 kg + 6.8 kg) \u00d7 $6.40 = $64.64 \u00f7 6 = $10.77, finishing is $4.20 \u2014 <strong style=\"color: #273171;\">$39.14 per piece, 2.5\u00d7 the full-tree price<\/strong>. This is the cleanest illustration of the whole topic: the process has a natural packet size, and a casting minimum order quantity is simply that packet. The table below puts the three derivations side by side with the two processes most buyers also shortlist, so you can see which driver you are actually arguing with.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Process<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">What sets the MOQ<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Typical MOQ<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Penalty at 1\/3 of MOQ<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">\u0417\u0435\u043b\u0451\u043d\u044b\u0439 \u043f\u0435\u0441\u043e\u043a<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">One furnace tap + line changeover<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">30\u2013100 pcs<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+25\u201330% per piece<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Resin \/ no-bake sand<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Mixer batch and mould handling<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">20\u201360 pcs<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+20\u201330% per piece<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Shell mould<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Shell machine and pattern plate<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">100\u2013300 pcs<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+30\u201340% per piece<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Investment (lost wax)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pieces per wax tree<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">12\u201336 pcs (per tree)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Up to +150% per piece<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">High-pressure die casting<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Setup recovery against unit price<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">300\u20131,000 pcs<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+400\u2013600% per piece<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Permanent mould \/ squeeze<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Die preheat, cycle stability<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">100\u2013500 pcs<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+40\u201380% per piece<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p234-moq-waxtree.webp\" alt=\"Casting minimum order quantity in investment casting: a wax tree holding many valve body patterns beside one finished stainless steel casting\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">A wax tree is a fixed packet: shell and running system cost the same whether it carries 6 patterns or 24.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Unit Price Versus Carrying Cost: The Buyer-Side Math<\/h2>\n<p style=\"margin: 0 0 18px;\">Beating the casting minimum order quantity on paper is not the same as winning. Buying big to get the lower tier converts a price problem into an inventory problem, and inventory has a carrying cost. Take the pump housing at 480 pieces per year with a quoted ladder of $81.50 at 100 pieces, $72.40 at 300 and $64.00 at 600.<\/p>\n<p style=\"margin: 0 0 18px;\">Option A, six releases of 100 pieces: purchase spend 6 \u00d7 $8,150 = <strong style=\"color: #273171;\">$48,900<\/strong>; average stock 50 pieces, and at a carrying rate of 22% per year (10% capital, 6% storage, 6% obsolescence and damage) that is 50 \u00d7 $81.50 \u00d7 0.22 = <strong style=\"color: #273171;\">$897<\/strong>. Option B, one buy of 480 pieces at $64 = <strong style=\"color: #273171;\">$30,720<\/strong>; average stock 240 pieces, carrying 240 \u00d7 $64 \u00d7 0.22 = <strong style=\"color: #273171;\">$3,379<\/strong>.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Line item<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">6 \u00d7 100 pcs<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">1 \u00d7 480 pcs<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Delta<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Purchase spend per year<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$48,900<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$30,720<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">\u2212$18,180<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Inventory carrying cost<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$897<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$3,379<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+$2,482<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Total cost of ownership<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$49,797<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$34,099<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">\u2212$15,698<\/strong><\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Verdict<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">\u2014<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">Buy big<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Demand is stable<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Now flip the case. Annual demand is 120 pieces and the design is not frozen. Accepting a 600-piece MOQ locks up five years of stock: average stock is 300 pieces, so carrying cost is 300 \u00d7 $64 \u00d7 0.22 = $4,224 per year, or <strong style=\"color: #273171;\">$21,120 over five years<\/strong>. The price saving is (120 \u00d7 $17.50) = $2,100 per year, or $10,500 over the same period. You spend $21,120 to save $10,500 \u2014 a net loss of <strong style=\"color: #273171;\">$10,620<\/strong>. When demand is thin or the drawing may change, the right answer is to pay the premium, or to change process, not to buy the tier.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Six Levers That Lower a Casting Minimum Order Quantity<\/h2>\n<p style=\"margin: 0 0 18px;\">Once you know which driver produced the number, only a handful of moves genuinely help. Everything else is asking the supplier to absorb a real cost.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Lever<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">What you actually do<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Effect<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">\u041a\u043e\u043c\u043f\u0440\u043e\u043c\u0438\u0441\u0441<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Share the melt<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Put three part numbers of the same alloy on one tap<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$860 fixed cost \u2192 $287 per part number<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Deliveries must be synchronized<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Blanket order, scheduled releases<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Price at annual volume, ship monthly<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">600-pc price with one month of stock<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Take-or-pay clause if volume slips<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Common mould base<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Buy inserts only, reuse a standard base<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tooling down 30\u201350%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Cavity layout flexibility is lost<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Right-size the process<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Sand or lost foam at 20\u201380 pcs instead of die casting at 500<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">MOQ falls by an order of magnitude<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tolerance and surface class change<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Prototype route first<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3D-printed sand moulds or bar stock until the design is frozen<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">No tooling exposure at 1\u201350 pcs<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Unit cost high; must re-quote for series<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pay the premium openly<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Agree a stated small-batch surcharge<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Predictable price and delivery<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+25\u201330% per piece at 1\/3 MOQ<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Two of these are worth underlining. <strong style=\"color: #273171;\">Sharing the melt<\/strong> is the cheapest lever in sand casting because the fixed cost genuinely disappears rather than moving. And <strong style=\"color: #273171;\">right-sizing the process<\/strong> is the only lever that changes the MOQ itself instead of the price of ignoring it \u2014 a part quoted at 500 pieces by <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d1%83%d1%81%d0%bb%d1%83%d0%b3%d0%b8-%d0%bb%d0%b8%d1%82%d1%8c%d1%8f-%d0%bf%d0%be%d0%b4-%d0%b4%d0%b0%d0%b2%d0%bb%d0%b5%d0%bd%d0%b8%d0%b5%d0%bc\/\" target=\"_blank\" rel=\"noopener\">\u043b\u0438\u0442\u044c\u0435 \u043f\u043e\u0434 \u0434\u0430\u0432\u043b\u0435\u043d\u0438\u0435\u043c<\/a> may quote at 30 pieces from <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%bb%d0%b8%d1%82%d1%8c%d0%b5-%d0%b2-%d0%bf%d0%b5%d1%81%d1%87%d0%b0%d0%bd%d1%8b%d0%b5-%d1%84%d0%be%d1%80%d0%bc%d1%8b\/\" target=\"_blank\" rel=\"noopener\">\u043b\u0438\u0442\u044c\u0435 \u0432 \u043f\u0435\u0441\u0447\u0430\u043d\u044b\u0435 \u0444\u043e\u0440\u043c\u044b<\/a> \u0438\u043b\u0438 <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/%d0%bb%d0%b8%d1%82%d1%8c%d0%b5-%d0%bf%d0%be-%d0%bc%d0%b5%d1%82%d0%be%d0%b4%d1%83-%d0%bf%d0%be%d1%82%d0%b5%d1%80%d1%8f%d0%bd%d0%bd%d0%be%d0%b9-%d0%bf%d0%b5%d0%bd%d1%8b\/\" target=\"_blank\" rel=\"noopener\">\u043b\u0438\u0442\u044c\u0435 \u043f\u043e \u043c\u0435\u0442\u043e\u0434\u0443 \u00ab\u043f\u043e\u0442\u0435\u0440\u044f\u043d\u043d\u043e\u0439 \u043f\u0435\u043d\u044b\u00bb<\/a>. Compare the routes in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/%d0%bb%d0%b8%d1%82%d1%8c%d0%b5-%d0%bf%d0%be%d0%b4-%d0%b4%d0%b0%d0%b2%d0%bb%d0%b5%d0%bd%d0%b8%d0%b5%d0%bc-%d0%b8-%d0%bb%d0%b8%d1%82%d1%8c%d0%b5-%d0%b2-%d0%bf%d0%b5%d1%81%d1%87%d0%b0%d0%bd%d1%8b%d0%b5\/\" target=\"_blank\" rel=\"noopener\">\u043b\u0438\u0442\u044c\u0435 \u043f\u043e\u0434 \u0434\u0430\u0432\u043b\u0435\u043d\u0438\u0435\u043c \u0438 \u043b\u0438\u0442\u044c\u0435 \u0432 \u043f\u0435\u0441\u0447\u0430\u043d\u044b\u0435 \u0444\u043e\u0440\u043c\u044b<\/a> before you argue about the number.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">What to Write About MOQ in the RFQ<\/h2>\n<p style=\"margin: 0 0 18px;\">Most casting minimum order quantity friction is a specification problem, not a negotiation problem. Put these five lines in the enquiry and the number you get back will already reflect your real demand. A complete <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/casting-rfq\/\" target=\"_blank\" rel=\"noopener\">casting RFQ<\/a> package gets priced in two to three working days; each missing line costs a week of round trips.<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">State annual volume, not just this order.<\/strong> &#8220;480 pcs\/year, releases of 40 pcs\/month&#8221; is a different quote from &#8220;40 pcs&#8221;.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Ask for three price points.<\/strong> Price at MOQ, at 2 \u00d7 MOQ, and at the annual blanket volume.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Ask what drives the casting minimum order quantity.<\/strong> Melt batch, setup recovery or tooling? The answer tells you which lever applies.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Separate tooling from unit price.<\/strong> If tooling is billed once, unit price should not carry its amortization twice \u2014 see <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/casting-molds-making\/\" target=\"_blank\" rel=\"noopener\">casting mould and pattern making<\/a>.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Confirm the unit of the MOQ.<\/strong> Per part number, per production batch, or per shipment? These are three different commitments.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">Also say what happens after the first batch. If the programme needs a <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/casting-first-article-inspection\/\" target=\"_blank\" rel=\"noopener\">first article inspection<\/a> once a year rather than once per release, that fixed cost stops being a reason for a large MOQ. The same applies to inspection class: a tight <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/%d1%80%d1%83%d0%ba%d0%be%d0%b2%d0%be%d0%b4%d1%81%d1%82%d0%b2%d0%be-%d0%bf%d0%be-%d0%b4%d0%be%d0%bf%d1%83%d1%81%d0%ba%d0%b0%d0%bc-%d0%bf%d1%80%d0%b8-%d0%bb%d0%b8%d1%82%d1%8c%d0%b5\/\" target=\"_blank\" rel=\"noopener\">tolerance spec<\/a> and a heavy <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/casting-machining-allowance\/\" target=\"_blank\" rel=\"noopener\">machining allowance<\/a> both raise setup scrap, which raises the quantity needed to absorb it.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p234-moq-diecell.webp\" alt=\"Casting minimum order quantity on a die casting cell: a two-cavity steel mould beside a row of identical aluminium castings\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Cavities per shot and setup recovery together decide the die casting MOQ.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">When You Should Simply Pay the Premium<\/h2>\n<p style=\"margin: 0 0 18px;\">Four situations where fighting the <strong style=\"color: #273171;\">casting minimum order quantity<\/strong> costs more than accepting it:<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">The design is not frozen.<\/strong> A cheaper unit price on a part you will redraw is a write-off, not a saving.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Annual demand is below the MOQ.<\/strong> As the 120-piece case shows, five years of carrying cost beats one year of price advantage.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">You are in qualification.<\/strong> Buy 20 pieces at a premium, run <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/%d0%bc%d0%b5%d1%82%d0%be%d0%b4%d1%8b-%d0%ba%d0%be%d0%bd%d1%82%d1%80%d0%be%d0%bb%d1%8f-%d0%bb%d0%b8%d1%82%d1%8c%d1%8f\/\" target=\"_blank\" rel=\"noopener\">inspection and NDT<\/a>, then commit to the volume price.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">It is a spare part.<\/strong> Intermittent demand plus a dated drawing is exactly the case for a prototype route or a <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/cnc-machining-services\/\" target=\"_blank\" rel=\"noopener\">CNC machined<\/a> part, not a production batch \u2014 and certainly not for accepting a casting minimum order quantity you cannot consume.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">Where the premium is unavoidable, reduce it somewhere else. Simulation before the first pour removes one sample loop \u2014 see <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/casting-simulation\/\" target=\"_blank\" rel=\"noopener\">casting simulation<\/a>. Choosing an alloy that is already in the furnace removes the melt penalty \u2014 start with <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/how-to-choose-casting-alloy\/\" target=\"_blank\" rel=\"noopener\">how to choose a casting alloy<\/a>. And if you only need a handful of parts to validate an assembly, <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/3d-printing-vs-casting\/\" target=\"_blank\" rel=\"noopener\">3D printing versus casting<\/a>, <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/3d-printing-prototype\/\" target=\"_blank\" rel=\"noopener\">\u041f\u0440\u043e\u0442\u043e\u0442\u0438\u043f\u044b, \u043d\u0430\u043f\u0435\u0447\u0430\u0442\u0430\u043d\u043d\u044b\u0435 \u043d\u0430 3D-\u043f\u0440\u0438\u043d\u0442\u0435\u0440\u0435<\/a> \u0438 <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d1%83%d1%81%d0%bb%d1%83%d0%b3%d0%b8-%d0%bf%d0%be-%d0%bb%d0%b8%d1%82%d1%8c%d1%8e-%d0%bc%d0%b5%d1%82%d0%b0%d0%bb%d0%bb%d0%b8%d1%87%d0%b5%d1%81%d0%ba%d0%b8%d1%85-%d0%bf%d1%80%d0%be%d1%82%d0%be%d1%82\/\" target=\"_blank\" rel=\"noopener\">metal prototype casting<\/a> will usually cost less than a production MOQ you cannot consume.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">\u0427\u0430\u0441\u0442\u043e \u0437\u0430\u0434\u0430\u0432\u0430\u0435\u043c\u044b\u0435 \u0432\u043e\u043f\u0440\u043e\u0441\u044b<\/h2>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">What is a typical casting minimum order quantity?<\/h3>\n<p style=\"margin: 0 0 18px;\">It depends entirely on the process. Green sand and no-bake sand commonly sit at 20\u2013100 pieces, shell mould at 100\u2013300, permanent mould and squeeze at 100\u2013500, and high-pressure die casting at 300\u20131,000. <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%bb%d0%b8%d1%82%d1%8c%d0%b5-%d0%bf%d0%be-%d0%b2%d1%8b%d0%bf%d0%bb%d0%b0%d0%b2%d0%bb%d1%8f%d0%b5%d0%bc%d1%8b%d0%bc-%d0%bc%d0%be%d0%b4%d0%b5%d0%bb%d1%8f%d0%bc\/\" target=\"_blank\" rel=\"noopener\">\u041b\u0438\u0442\u044c\u0435 \u043f\u043e \u0432\u044b\u043f\u043b\u0430\u0432\u043b\u044f\u0435\u043c\u044b\u043c \u043c\u043e\u0434\u0435\u043b\u044f\u043c<\/a> is quoted in trees, typically 12\u201336 pieces per tree. Ask which driver set the number before you treat it as fixed.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Why is the MOQ so different between sand casting and die casting?<\/h3>\n<p style=\"margin: 0 0 18px;\">Because the fixed cost sits in a different place. Sand casting is limited by the furnace tap \u2014 30 to 80 pieces per melt \u2014 and its setup is a few hundred dollars. Die casting has a $600-ish setup that includes tool install, preheat and trial shots, and its economics only work when that is spread over hundreds of pieces. See <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/%d1%80%d1%83%d0%ba%d0%be%d0%b2%d0%be%d0%b4%d1%81%d1%82%d0%b2%d0%be-%d0%bf%d0%be-%d0%bb%d0%b8%d1%82%d1%8c%d1%8e-%d0%bf%d0%be%d0%b4-%d0%b4%d0%b0%d0%b2%d0%bb%d0%b5%d0%bd%d0%b8%d0%b5%d0%bc-%d0%b0%d0%bb\/\" target=\"_blank\" rel=\"noopener\">aluminium die casting<\/a> for the process detail.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Can I lower the casting minimum order quantity without paying more?<\/h3>\n<p style=\"margin: 0 0 18px;\">Yes, in two cases: when your parts can share a melt or a setup with other orders, and when a blanket order lets the supplier price on annual volume while shipping smaller releases. Both remove real cost; neither is a discount. If neither applies, a lower MOQ is just a price increase with different wording.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Does tooling count toward the MOQ?<\/h3>\n<p style=\"margin: 0 0 18px;\">Indirectly, yes. Tooling is usually billed separately, but the supplier still needs enough pieces to justify occupying the tool and the machine. In die casting, tooling at $48,000 over 200,000 pieces is only $0.24 per piece \u2014 the MOQ is driven by setup recovery, not by amortization. Insist that tooling is quoted as its own line so you can see which is which.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Is the volume discount above the casting minimum order quantity linear?<\/h3>\n<p style=\"margin: 0 0 18px;\">No. The steepest part of the curve is between one third of MOQ and MOQ itself, because the fixed cost is being divided by a small number. Below MOQ the die casting example moves from $23.91 to $3.86 per piece \u2014 most of that happens in the first few hundred pieces. Beyond roughly 2 \u00d7 MOQ the curve flattens and material price dominates.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">How does MOQ affect lead time?<\/h3>\n<p style=\"margin: 0 0 18px;\">Smaller releases usually mean more setups, and more setups mean more queue time. Splitting 480 pieces into twelve 40-piece batches can add weeks to the schedule even when the casting itself takes hours \u2014 the full breakdown is in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%b1%d0%bb%d0%be%d0%b3\/casting-lead-time\/\" target=\"_blank\" rel=\"noopener\">casting lead time<\/a>. A blanket order with scheduled releases is often the best of both.<\/p>\n\t\t<div data-elementor-type=\"section\" data-elementor-id=\"3550\" class=\"elementor elementor-3550\" data-elementor-post-type=\"elementor_library\">\n\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-19b1acf1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"19b1acf1\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;,&quot;ekit_has_onepagescroll_dot&quot;:&quot;yes&quot;}\">\n\t\t\t\t\t\t\t<div class=\"elementor-background-overlay\"><\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-56e26ed6\" data-id=\"56e26ed6\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-52c3d00c elementor-widget elementor-widget-elementskit-heading\" data-id=\"52c3d00c\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"elementskit-heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"ekit-wid-con\" ><div class=\"ekit-heading elementskit-section-title-wraper text_left   ekit_heading_tablet-   ekit_heading_mobile-\"><h3 class=\"ekit-heading--title elementskit-section-title\">\u0418\u0449\u0435\u0442\u0435 \u043d\u0430\u0434\u0435\u0436\u043d\u044b\u0439 \u043c\u0435\u0442\u0430\u043b\u043b\u0443\u0440\u0433\u0438\u0447\u0435\u0441\u043a\u0438\u0439 \u0437\u0430\u0432\u043e\u0434 \u0432 \u041a\u0438\u0442\u0430\u0435?<\/h3><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24c75aa0 elementor-widget elementor-widget-text-editor\" data-id=\"24c75aa0\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>\u041c\u044b \u043f\u043e\u043c\u043e\u0436\u0435\u043c \u0432\u0430\u043c \u043e\u043f\u0442\u0438\u043c\u0438\u0437\u0438\u0440\u043e\u0432\u0430\u0442\u044c \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0438\u044e \u0438\u0437\u0434\u0435\u043b\u0438\u044f \u0438 \u0441\u043e\u043a\u0440\u0430\u0442\u0438\u0442\u044c \u0440\u0430\u0441\u0445\u043e\u0434\u044b.<\/li><li>\u041c\u044b \u043c\u043e\u0436\u0435\u043c \u043f\u043e\u043c\u043e\u0447\u044c \u0432\u0430\u043c \u0441 \u0438\u0437\u0433\u043e\u0442\u043e\u0432\u043b\u0435\u043d\u0438\u0435\u043c \u0432\u044b\u0441\u043e\u043a\u043e\u043a\u0430\u0447\u0435\u0441\u0442\u0432\u0435\u043d\u043d\u044b\u0445 \u043b\u0438\u0442\u044b\u0445 \u0434\u0435\u0442\u0430\u043b\u0435\u0439 \u0432 \u0431\u043e\u043b\u044c\u0448\u0438\u0445 \u043e\u0431\u044a\u0435\u043c\u0430\u0445.<\/li><li>\u041c\u044b \u043c\u043e\u0436\u0435\u043c \u043e\u0441\u0443\u0449\u0435\u0441\u0442\u0432\u0438\u0442\u044c \u043f\u043e\u0441\u0442\u0430\u0432\u043a\u0443 \u0432\u043e\u0432\u0440\u0435\u043c\u044f \u0438 \u043f\u043e\u043b\u0443\u0447\u0438\u0442\u044c \u0431\u043e\u043b\u044c\u0448\u0435 \u0432\u043e\u0437\u043c\u043e\u0436\u043d\u043e\u0441\u0442\u0435\u0439 \u043d\u0430 \u0440\u044b\u043d\u043a\u0435 \u0441\u0431\u044b\u0442\u0430.<\/li><li>\u0412\u044b \u0441\u043c\u043e\u0436\u0435\u0442\u0435 \u0432\u043e\u0441\u043f\u043e\u043b\u044c\u0437\u043e\u0432\u0430\u0442\u044c\u0441\u044f \u0443\u0441\u043b\u0443\u0433\u0430\u043c\u0438 \u043a\u043e\u043c\u043f\u0430\u043d\u0438\u0438 Supro MFG \u043f\u043e \u043b\u0438\u0442\u044c\u044e \u043c\u0435\u0442\u0430\u043b\u043b\u043e\u0432.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-51a20937 elementor-align-left elementor-widget elementor-widget-global elementor-global-1143 elementor-widget-button\" data-id=\"51a20937\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm elementor-animation-grow\" href=\"https:\/\/chinametalfoundry.com\/ru\/%d0%ba%d0%be%d0%bd%d1%82%d0%b0%d0%ba%d1%82\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">\u0417\u0430\u043f\u0440\u043e\u0441\u0438\u0442\u044c \u0446\u0435\u043d\u0443 \u043d\u0430\u043f\u0440\u044f\u043c\u0443\u044e \u0441 \u0437\u0430\u0432\u043e\u0434\u0430 <\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t\n<p class=\"sc-note\" style=\"font-size: 13px; color: #9a9a9a; margin: 28px 0 0;\">*Data referenced from AFS \/ NADCA industry publications and Supro MFG shop-floor records.<\/p>\n<\/article>","protected":false},"excerpt":{"rendered":"<p>Most buyers meet the casting minimum order quantity for the first time inside a quote, as a single line that [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":8018,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[51],"tags":[47,50,49,42],"class_list":["post-8017","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casting-processes","tag-casting-process","tag-casting-selection","tag-manufacturing-process","tag-metal-casting"],"_links":{"self":[{"href":"https:\/\/chinametalfoundry.com\/ru\/wp-json\/wp\/v2\/posts\/8017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/chinametalfoundry.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chinametalfoundry.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/ru\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/ru\/wp-json\/wp\/v2\/comments?post=8017"}],"version-history":[{"count":4,"href":"https:\/\/chinametalfoundry.com\/ru\/wp-json\/wp\/v2\/posts\/8017\/revisions"}],"predecessor-version":[{"id":8054,"href":"https:\/\/chinametalfoundry.com\/ru\/wp-json\/wp\/v2\/posts\/8017\/revisions\/8054"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/ru\/wp-json\/wp\/v2\/media\/8018"}],"wp:attachment":[{"href":"https:\/\/chinametalfoundry.com\/ru\/wp-json\/wp\/v2\/media?parent=8017"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/ru\/wp-json\/wp\/v2\/categories?post=8017"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/ru\/wp-json\/wp\/v2\/tags?post=8017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}