{"id":7902,"date":"2026-10-08T07:25:02","date_gmt":"2026-10-08T07:25:02","guid":{"rendered":"https:\/\/chinametalfoundry.com\/?p=7902"},"modified":"2026-10-08T07:25:02","modified_gmt":"2026-10-08T07:25:02","slug":"casting-lead-time","status":"publish","type":"post","link":"https:\/\/chinametalfoundry.com\/pl\/blog\/casting-lead-time\/","title":{"rendered":"Casting Lead Time: Tooling, Samples and Production by Process"},"content":{"rendered":"<article class=\"sc-article\" style=\"max-width: 820px; margin: 0 auto; font-family: 'Poppins',sans-serif; color: #7e7e7e; font-size: 16px; line-height: 1.7;\">\n<div class=\"sc-intro\" style=\"background: #F5F5F5; border-radius: 20px; padding: 22px 24px; font-style: italic; color: #3a3a3a; margin: 0 0 26px; line-height: 1.6;\">\n<p style=\"margin: 0;\">Casting lead time is the number that kills more launch schedules than price ever does. A buyer gets a quote of $41 per part, approves it in a day, and then discovers the first usable casting arrives nineteen weeks later \u2014 because nobody counted the four weeks of tooling, the re-sample loop, or the month on the water.<\/p>\n<\/div>\n<p style=\"margin: 0 0 18px;\">This guide breaks casting lead time into the seven phases that actually consume the calendar, gives realistic week counts for eight processes, and shows where a programme can lose six weeks without anyone noticing. The figures come from production records and published industry practice from bodies such as the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.afsinc.org\" target=\"_blank\" rel=\"noopener\">American Foundry Society<\/a> oraz <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.nadca.com\" target=\"_blank\" rel=\"noopener\">NADCA<\/a>, not from sales brochures. If you are new to process selection, start with our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/przewodnik-po-odlewaniu-metali\/\" target=\"_blank\">przewodnik po odlewaniu metali<\/a> and come back to this page when you are building a launch plan.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p225-lead-time-1.webp\" alt=\"casting lead time planning: sand molds queued on a foundry floor beside a finished casting\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Every mould in that queue represents furnace time that has to be booked before your order can run.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">What Casting Lead Time Actually Includes<\/h2>\n<p style=\"margin: 0 0 18px;\">Most buyers quote a single number \u2014 &#8220;six to eight weeks&#8221; \u2014 when what they mean is the production run only. Tooling, sampling, approval and freight sit outside that number and usually add more calendar time than the casting itself. The table below splits the schedule into the phases we track on every programme.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Phase<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Typical duration<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Controlled by<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Where it slips<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Drawing review and quotation<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u201310 working days<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Both sides<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Missing grade, tolerance class or test requirement<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tooling: pattern, core boxes, die<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2\u201314 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Foundry \/ tool room<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Design changes issued after steel or aluminium is cut<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">First article sample<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2\u20136 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Foundry<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">No agreed CTQ list, so the sample gets re-made<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Customer approval of sample<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u201314 days<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Buyer<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">No named approver; report format disputed<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Production run<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2\u20136 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Foundry<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Furnace capacity not booked in advance<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Secondary operations<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1\u20133 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Both sides<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Heat treatment, machining or coating booked only after casting<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Packing, documentation, freight<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">5\u201340 days<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Forwarder<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Freight mode decided at shipment instead of at RFQ<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Add the realistic mid-points and casting lead time from drawing release to delivered parts lands between <strong style=\"color: #273171;\">11 and 24 weeks<\/strong> for a first production order. Repeat orders drop to the production-plus-freight column only, typically 4 to 8 weeks, because tooling exists and the approval loop is a formality.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Casting Lead Time by Process<\/h2>\n<p style=\"margin: 0 0 18px;\">Process choice sets the floor on your casting lead time before any negotiation starts. Tooling complexity dominates: a wooden pattern plate is days of work, a multi-slide die casting tool is months. The ranges below assume a medium-complexity part (two to four cores or slides), a normal queue, and no design changes after tool release.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Proces<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Oprzyrz\u0105dowanie<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">First article<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">500\u20132,000 pc run<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Total to ex-works<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Odlewanie w zielonym piasku<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2\u20134 tygodnie<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2\u20133 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u20135 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">7\u201312 weeks<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Resin sand \/ no-bake<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2\u20134 tygodnie<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2\u20133 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u20135 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">7\u201312 weeks<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Shell mould casting<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">4\u20136 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u20134 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u20134 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">10\u201314 weeks<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Lost foam casting<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">5\u20138 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u20135 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">4\u20136 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">12\u201318 weeks<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Permanent mould (gravity \/ low pressure)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">6\u201310 tygodni<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u20134 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u20135 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">12\u201318 weeks<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">High pressure die casting<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">8\u201314 tygodni<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u20135 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2\u20134 tygodnie<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">14\u201322 weeks<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Investment casting (lost wax)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u20135 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">4\u20136 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">4\u20136 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">11\u201317 weeks<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Centrifugal casting<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u20136 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2\u20134 tygodnie<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3\u20135 weeks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">8\u201314 tygodni<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Read the last two columns together. Die casting has the longest casting lead time to first part but the shortest production run once the die is qualified, which is exactly why it wins at volume and loses at 200 pieces. The reverse is true for <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/odlewanie-w-formach-piaskowych-z-uzyciem-zywicy\/\" target=\"_blank\">odlewanie w formach piaskowych z u\u017cyciem \u017cywicy<\/a> and green sand: the tooling is cheap and fast, so the first part arrives early even though each piece takes longer to make. Our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/odlewanie-cisnieniowe-a-odlewanie-w-formach-piaskowych\/\" target=\"_blank\">odlewanie ci\u015bnieniowe a odlewanie w formach piaskowych<\/a> comparison covers the volume crossover in detail, and the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/odlewanie-w-formach-stalych\/\" target=\"_blank\">permanent mould<\/a> oraz <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/shell-mold-casting\/\" target=\"_blank\">shell mould<\/a> pages sit between the two.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">Why tooling dominates the calendar<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">A sand pattern plate and a set of core boxes are machined from aluminium or hardwood and can be revised with a few hours of CNC time. A high pressure die casting die is a hardened tool-steel assembly with cooling lines, slides and ejector geometry, and every revision means heat treatment and re-fitting. That difference is the single largest lever on casting lead time, and it is decided at the process-selection meeting rather than in the tool room. Our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/casting-molds-making\/\" target=\"_blank\">casting mould and pattern making<\/a> oraz <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/uslugi-odlewania-cisnieniowego\/\" target=\"_blank\">odlewanie ci\u015bnieniowe<\/a> teams quote tooling duration separately from piece price for exactly this reason.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p225-lead-time-2.webp\" alt=\"casting lead time tooling stage: pattern plate and core boxes laid out in a tool room\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Tooling is the phase you can compress with money; everything downstream of it is queue time.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">The Sample Loop: Where Schedules Quietly Die<\/h2>\n<p style=\"margin: 0 0 18px;\">The most common way to lose a month is a first article that gets made twice. The foundry produces a sample, the buyer measures everything on the drawing instead of the characteristics that matter, finds two dimensions outside an unspecified tolerance, and asks for a re-sample. That loop adds two to three weeks of furnace queue plus a week of approval \u2014 on a programme that was already tight.<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Agree the CTQ list before tooling.<\/strong> Five to ten dimensions, plus material and test requirements. Everything else is reference only.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Fix the tolerance class on the drawing.<\/strong> A drawing without a tolerance class forces the foundry to guess, and the guess is usually wrong. See our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/przewodnik-po-tolerancjach-odlewniczych\/\" target=\"_blank\">przewodnik po tolerancjach odlewniczych<\/a>.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Name the approver and the report format.<\/strong> A dimensional report, material certificate and <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/metody-kontroli-odlewow\/\" target=\"_blank\">inspection record<\/a> agreed up front removes the &#8220;we need it in our template&#8221; delay.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Order three samples, not one.<\/strong> One sample cannot support both destructive sectioning and a customer retain; three cost marginally more and remove a repeat loop.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">Simulation is the cheapest insurance here. Running solidification analysis before the tool is cut typically removes one sample iteration, which is worth two to three weeks of casting lead time for a study that costs a fraction of the tooling. The economics are worked through on our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/casting-simulation\/\" target=\"_blank\">casting simulation<\/a> page, and the defect it most often prevents is described under <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/typowe-wady-odlewow-i-sposoby-ich-unikania\/\" target=\"_blank\">typowe wady odlew\u00f3w<\/a>.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Secondary Operations: Machining, Heat Treatment, Coating<\/h2>\n<p style=\"margin: 0 0 18px;\">A casting is rarely a finished part, and every downstream step adds queue time that buyers forget to book. None of these steps is long in isolation, but stacked they routinely add three weeks to casting lead time. Typical additions: stress relieving or annealing <strong style=\"color: #273171;\">1\u20132 days<\/strong> plus furnace queue, full <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/obrobka-cieplna-odlewow\/\" target=\"_blank\">T6 solution treatment and ageing<\/a> <strong style=\"color: #273171;\">3\u20135 days<\/strong> including the 8\u201312 hour solution soak, CNC machining <strong style=\"color: #273171;\">1\u20133 weeks<\/strong> depending on whether fixtures exist, and <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/casting-surface-finishing\/\" target=\"_blank\">surface finishing<\/a> from 5 days for blasting and priming to 7\u201310 days for plating or anodising.<\/p>\n<p style=\"margin: 0 0 18px;\">The scheduling trick is overlap. On a 2,000-piece order, machining can start on the first 400 pieces while the foundry is still pouring, which converts two sequential weeks into roughly one week of tail. That only works if machining capacity is booked at the same time as the casting order \u2014 which is why our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/cnc-machining-services\/\" target=\"_blank\">Obr\u00f3bka CNC<\/a>, <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/uslugi-obrobki-cieplnej\/\" target=\"_blank\">obr\u00f3bka cieplna<\/a> oraz <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/surface-treatment-services\/\" target=\"_blank\">obr\u00f3bka powierzchni<\/a> lines are planned against one schedule rather than three. If machining is the long pole, read <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/cnc-machining-vs-casting\/\" target=\"_blank\">CNC machining vs casting<\/a> before you decide how much stock to leave.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Freight: The Month Nobody Puts on the Plan<\/h2>\n<p style=\"margin: 0 0 18px;\">For an Asia-to-Europe or Asia-to-North-America programme, freight is often 25\u201335% of total casting lead time, and it is the phase with the widest spread between cheap and fast.<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Sea freight, China to Rotterdam:<\/strong> 30\u201338 days port to port, plus 3\u20135 days for inland delivery and customs.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Sea freight, China to US West Coast:<\/strong> 18\u201325 days port to port.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Rail, China to Europe:<\/strong> 18\u201322 days, roughly half the sea transit at a higher rate.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Air freight:<\/strong> 5\u20138 days door to door at roughly five to seven times the sea rate per kilogram.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">A split shipment usually beats both extremes. Take 2,000 aluminium housings at 4.2 kg each, about 9,000 kg packed. Flying the first 300 pieces (roughly 1,350 kg gross) at $5.50\/kg costs about $7,400 against roughly $200 to ship the same cartons by sea, so the premium is about <strong style=\"color: #273171;\">$7,200 to pull 24 days forward<\/strong>. If the assembly line is booked and a four-week slip costs more than $7,200 in idle labour, expedited downstream freight or penalties, the air leg is the cheapest week you will ever buy. Flying all 9,000 kg would cost roughly $49,500 and almost never makes sense.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p225-lead-time-3.webp\" alt=\"casting lead time shipment stage: finished castings packed in a wooden export crate ready for freight\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Freight mode should be decided at RFQ stage, not the week the parts are packed.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">A Real Schedule, Week by Week<\/h2>\n<p style=\"margin: 0 0 18px;\">Here is a first-order programme for 2,000 ductile iron pump housings, sand cast and partially machined, delivered to a European warehouse. Nothing in it is unusual, and it still adds up to roughly five months of casting lead time.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Step<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Weeks<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Cumulative<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Note<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">DFM review and quotation<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Grade, tolerance class and test scope agreed<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pattern plate and core boxes<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">4.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">CNC-machined aluminium, sand-tested before release<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">First article casting and layout<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">7.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Three samples, one sectioned<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Customer approval<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">8.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Assumes one named approver<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Production, 500 pieces per week<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">4.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">12.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Furnace slot booked at order placement<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machining, overlapping from week 11<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">14.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Two-week tail after the last pour<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Packing and export documents<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.5<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">14.5<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pallets, certificates, packing list<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Sea freight and inland delivery<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">5.0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">19.5<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">35 days transit plus handling<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Nineteen and a half weeks of casting lead time, and only four of them are spent pouring metal. The three compression options, priced: expedited tooling with parallel machining and overtime, about <strong style=\"color: #273171;\">+$2,400 to save 1.5 weeks<\/strong>; simulation before tool release, roughly <strong style=\"color: #273171;\">$2,000 to remove a 2\u20133 week re-sample<\/strong>; air freight on the first 300 pieces, about <strong style=\"color: #273171;\">$7,200 to save 3.5 weeks<\/strong>. The first two are worth taking almost every time. The third depends entirely on what a week of delay costs you, which is the only honest way to evaluate a compressed casting lead time.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Five Levers That Shorten Casting Lead Time<\/h2>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Freeze the design before tool release.<\/strong> An engineering change issued after steel or aluminium is cut costs one to three weeks and often doubles as a defect source. If a change is unavoidable, ask whether it can wait for the second tool.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Pick the process for the schedule, not only the piece price.<\/strong> At 200 pieces, <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/odlewanie-w-formach-piaskowych\/\" target=\"_blank\">odlewanie w formach piaskowych<\/a> beats die casting on both cost and calendar. At 20,000, the die pays for itself. Our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/podzial-kosztow-rzucania-zaklec\/\" target=\"_blank\">podzia\u0142 koszt\u00f3w rzucania zakl\u0119\u0107<\/a> shows where the crossover sits.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Use the prototype route for the first parts.<\/strong> Printed sand moulds or a soft tool can deliver sample castings in days while production tooling is being machined. See <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/3d-printing-prototype\/\" target=\"_blank\">3D printed prototypes<\/a> oraz <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/metal-prototype-casting-services\/\" target=\"_blank\">metal prototype casting<\/a>, and the trade-offs in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/3d-printing-vs-casting\/\" target=\"_blank\">3D printing vs casting<\/a>.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Specify tolerances you actually need.<\/strong> Over-tight dimensions push the part into a slower process or add a machining pass. Start from <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/przewodnik-po-tolerancjach-odlewniczych\/\" target=\"_blank\">ISO 8062 tolerance classes<\/a> and open up everything that is not a sealing or bearing face.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Book capacity and materials at order placement.<\/strong> Furnace slots, heat treatment batches and alloy purchases are queues. A supplier who reserves them when the order is placed, rather than when the tooling finishes, saves one to two weeks on every programme.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">Material choice interacts with all five. Exotic alloys and tight chemistry windows add melt scheduling and sometimes a dedicated heat; the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/how-to-choose-casting-alloy\/\" target=\"_blank\">casting alloy selection<\/a> guide and the grade-level pages for <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/aluminum-casting-alloys-a356-vs-a380\/\" target=\"_blank\">aluminium casting alloys<\/a> oraz <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/blog\/stainless-steel-investment-casting-grades\/\" target=\"_blank\">stainless steel investment casting grades<\/a> show which grades are stocked and which trigger a special melt.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">What to Ask at RFQ Stage<\/h2>\n<p style=\"margin: 0 0 18px;\">Casting lead time becomes predictable when it is asked for in pieces rather than as one number. Request, in writing:<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\">Tooling duration, and the date the tool will be released for sampling.<\/li>\n<li style=\"margin: 0 0 8px;\">Sample quantity, and exactly what the first article report will contain.<\/li>\n<li style=\"margin: 0 0 8px;\">Production rate per week, and whether the furnace slot is booked on order placement.<\/li>\n<li style=\"margin: 0 0 8px;\">Whether machining, heat treatment and coating are in-house or subcontracted, and their durations.<\/li>\n<li style=\"margin: 0 0 8px;\">Incoterm, packing standard, and the assumed freight mode and transit days.<\/li>\n<li style=\"margin: 0 0 8px;\">Planned shutdowns that overlap the schedule \u2014 Chinese New Year typically stops production for two to three weeks, and Golden Week adds a further week.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">Suppliers who answer all six with dates rather than ranges are the ones whose casting lead time you can plan against. Ask the same questions whether you are buying <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/rozwiazania\/odlewy-zeliwne\/\" target=\"_blank\">iron castings<\/a>, <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/rozwiazania\/odlew-aluminiowy\/\" target=\"_blank\">aluminium castings<\/a>, <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/rozwiazania\/steel-casting\/\" target=\"_blank\">steel castings<\/a> lub <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/pl\/odlewanie-precyzyjne\/\" target=\"_blank\">odlewy precyzyjne<\/a>; the phase structure is identical even though the week counts differ.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Najcz\u0119\u015bciej zadawane pytania<\/h2>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">How long is casting lead time for a first order?<\/h3>\n<p style=\"margin: 0 0 18px;\">Typically 11 to 24 weeks from drawing release to delivered parts, depending on process. Sand and resin sand programmes sit at the fast end (7\u201312 weeks ex-works), high pressure die casting at the slow end (14\u201322 weeks ex-works) because of tool build time. Add 5 weeks for sea freight to Europe or 3 weeks to the US West Coast.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Which casting process has the shortest lead time?<\/h3>\n<p style=\"margin: 0 0 18px;\">Green sand and resin sand casting, because pattern tooling can be machined in two to four weeks and revised quickly. For a first sample without any tooling, printed sand moulds or a soft tool can produce parts in days, which is often the fastest route to a validated design while production tooling is being machined. That is why casting lead time for a prototype run and for a production run are two different questions.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Why does die casting tooling take so long?<\/h3>\n<p style=\"margin: 0 0 18px;\">A die is a hardened tool-steel assembly with cooling channels, slides and ejectors. It has to be machined, heat treated, fitted and sampled, and any revision repeats part of that cycle. Eight to fourteen weeks is normal for a medium-complexity die, longer with multiple slides.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Can I shorten casting lead time by paying more?<\/h3>\n<p style=\"margin: 0 0 18px;\">Partly. Expedited tooling, simulation before tool release and air freight on a partial shipment are the three that reliably buy weeks, at roughly $2,000\u2013$7,500 each. What money cannot buy is furnace capacity in a plant that is already fully booked, which is why booking at order placement matters more than rush fees.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Does heat treatment add much to the schedule?<\/h3>\n<p style=\"margin: 0 0 18px;\">Less than people fear, but it is not free: annealing or stress relieving adds one to two days plus queue, and a full T6 cycle on aluminium adds three to five days including the eight to twelve hour solution soak. The delay usually comes from batch scheduling, not the cycle itself.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">How much buffer should I add to a quoted casting lead time?<\/h3>\n<p style=\"margin: 0 0 18px;\">Fifteen percent is a reasonable planning buffer for a first order with a new supplier, and about one week for repeat orders. If the programme spans Chinese New Year, add the full shutdown period on top rather than assuming it can be worked around.<\/p>\n\t\t<div data-elementor-type=\"section\" data-elementor-id=\"3550\" class=\"elementor elementor-3550\" data-elementor-post-type=\"elementor_library\">\n\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-19b1acf1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"19b1acf1\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;,&quot;ekit_has_onepagescroll_dot&quot;:&quot;yes&quot;}\">\n\t\t\t\t\t\t\t<div class=\"elementor-background-overlay\"><\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-56e26ed6\" data-id=\"56e26ed6\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-52c3d00c elementor-widget elementor-widget-elementskit-heading\" data-id=\"52c3d00c\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"elementskit-heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"ekit-wid-con\" ><div class=\"ekit-heading elementskit-section-title-wraper text_left   ekit_heading_tablet-   ekit_heading_mobile-\"><h3 class=\"ekit-heading--title elementskit-section-title\">Szukasz niezawodnej odlewni metali w Chinach?<\/h3><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24c75aa0 elementor-widget elementor-widget-text-editor\" data-id=\"24c75aa0\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Mo\u017cemy pom\u00f3c Ci zoptymalizowa\u0107 projekt produktu i obni\u017cy\u0107 koszty.<\/li><li>Mo\u017cemy pom\u00f3c Pa\u0144stwu w zakresie wysokiej jako\u015bci odlew\u00f3w produkowanych w du\u017cych ilo\u015bciach.<\/li><li>Mo\u017cemy dostarczy\u0107 na czas i zyska\u0107 wi\u0119cej mo\u017cliwo\u015bci rynkowych sprzeda\u017cy.<\/li><li>Skorzystaj z us\u0142ug odlewniczych firmy Supro MFG.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-51a20937 elementor-align-left elementor-widget elementor-widget-global elementor-global-1143 elementor-widget-button\" data-id=\"51a20937\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm elementor-animation-grow\" href=\"https:\/\/chinametalfoundry.com\/pl\/kontakt\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Popro\u015b o wycen\u0119 bezpo\u015brednio od producenta <\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t\n<p class=\"sc-note\" style=\"font-size: 13px; color: #9a9a9a; margin: 28px 0 0;\">*Lead-time ranges reflect published industry practice from AFS and NADCA, standard freight transits, and Supro MFG production records. Actual schedules depend on part complexity, alloy and order quantity.<\/p>\n<\/article>","protected":false},"excerpt":{"rendered":"<p>Casting lead time is the number that kills more launch schedules than price ever does. A buyer gets a quote [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":7903,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[51],"tags":[47,50,49,42],"class_list":["post-7902","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casting-processes","tag-casting-process","tag-casting-selection","tag-manufacturing-process","tag-metal-casting"],"_links":{"self":[{"href":"https:\/\/chinametalfoundry.com\/pl\/wp-json\/wp\/v2\/posts\/7902","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/chinametalfoundry.com\/pl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chinametalfoundry.com\/pl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/pl\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/pl\/wp-json\/wp\/v2\/comments?post=7902"}],"version-history":[{"count":4,"href":"https:\/\/chinametalfoundry.com\/pl\/wp-json\/wp\/v2\/posts\/7902\/revisions"}],"predecessor-version":[{"id":7926,"href":"https:\/\/chinametalfoundry.com\/pl\/wp-json\/wp\/v2\/posts\/7902\/revisions\/7926"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/pl\/wp-json\/wp\/v2\/media\/7903"}],"wp:attachment":[{"href":"https:\/\/chinametalfoundry.com\/pl\/wp-json\/wp\/v2\/media?parent=7902"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/pl\/wp-json\/wp\/v2\/categories?post=7902"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/pl\/wp-json\/wp\/v2\/tags?post=7902"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}