{"id":8213,"date":"2026-11-04T01:25:01","date_gmt":"2026-11-04T01:25:01","guid":{"rendered":"https:\/\/chinametalfoundry.com\/?p=8213"},"modified":"2026-11-04T08:17:14","modified_gmt":"2026-11-04T08:17:14","slug":"casting-capacity-reservation","status":"publish","type":"post","link":"https:\/\/chinametalfoundry.com\/ja\/blog\/casting-capacity-reservation\/","title":{"rendered":"Casting Capacity Reservation: How Annual Framework Agreements Secure Production"},"content":{"rendered":"<article class=\"sc-article\" style=\"max-width: 820px; margin: 0 auto; font-family: 'Poppins',sans-serif; color: #7e7e7e; font-size: 16px; line-height: 1.7;\">\n<div class=\"sc-intro\" style=\"background: #F5F5F5; border-radius: 20px; padding: 22px 24px; font-style: italic; color: #3a3a3a; margin: 0 0 26px; line-height: 1.6;\">\n<p style=\"margin: 0;\">Every foundry has busy months. When a molding line runs at 90% utilization, the buyer without a contract waits three to six weeks while the buyer with a reserved slot ships on schedule. <strong style=\"color: #273171;\">Casting capacity reservation<\/strong> converts that difference from luck into contract: a reserved block of furnace tons, molding line slots and machining hours that your parts occupy before the spot market does.<\/p>\n<\/div>\n<p style=\"margin: 0 0 18px;\">That wait is not bad luck; it is queueing. This article explains what casting capacity reservation actually buys, how foundries plan melt, mold and machine capacity, and what an annual framework agreement must contain to be enforceable. All cost models use one baseline part \u2014 an 18 kg ductile iron pump housing at <strong style=\"color: #273171;\">$34.50<\/strong> FOB, 2,400 pieces per year, roughly <strong style=\"color: #273171;\">46 castings per week<\/strong> \u2014 so every number can be checked against your own part. Industry context draws on <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.nadca.com\/\" target=\"_blank\" rel=\"noopener\">NADCA<\/a> guidelines and the contract structures published by the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/iccwbo.org\/\" target=\"_blank\" rel=\"noopener\">ICC<\/a>.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/11\/p254-capacity-1.webp\" alt=\"casting capacity reservation scheduling board with ductile iron pump housing castings\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">A weekly scheduling board next to the castings it allocates: reserved blocks are planned before spot orders enter the queue.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">What Casting Capacity Reservation Actually Buys<\/h2>\n<p style=\"margin: 0 0 18px;\"><strong style=\"color: #273171;\">Casting capacity reservation<\/strong> is a contractual agreement that fixes a slice of a foundry&#8217;s constrained weekly output for your parts before the open market can take it. It is not inventory, not a purchase order, and not a blanket PO. It is scheduled production capability: furnace tons, molding line slots and machining cell hours with your part number written into next week&#8217;s plan whether or not you release an order that week.<\/p>\n<p style=\"margin: 0 0 18px;\">Foundries sell it for a simple reason. A <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e7%a0%82%e5%9e%8b%e9%8b%b3%e9%80%a0\/\" target=\"_blank\" rel=\"noopener\">\u7802\u578b\u92f3\u9020<\/a> line that molds 90 flasks a day serves dozens of part numbers, and the week is fully booked weeks in advance. If a buyer disappears for two months and returns expecting instant slots, the foundry must either bump someone else or idle a block it could have sold. Reservation converts that uncertainty into a paid product \u2014 and gives the buyer a <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/%e9%8b%b3%e9%80%a0%e3%83%aa%e3%83%bc%e3%83%89%e3%82%bf%e3%82%a4%e3%83%a0\/\" target=\"_blank\" rel=\"noopener\">\u92f3\u9020\u30ea\u30fc\u30c9\u30bf\u30a4\u30e0<\/a> position that does not blow up in peak season.<\/p>\n<p style=\"margin: 0 0 18px;\">Three resources get reserved, and they are not interchangeable:<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Scarce resource<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Unit of capacity<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Typical constraint<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">What reserving it guarantees<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Melt (induction furnace)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tons per week<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Heats sized to alloy and lot; chemical changeover costs a full heat<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Metal of your grade is melted on your release days, not when the furnace happens to be free<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Molding line (flasks\/hour)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Molds or flasks per week<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">One part per flask for most sand castings; pattern changeover takes hours<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Your pattern is scheduled into the line before spot orders queue<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machining cell<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machine-hours per week<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Fixtures, CMM slots and setup time shared across customers<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Rough castings flow to finishing inside the guaranteed window, avoiding the bottleneck that often dominates casting lead time<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Buyers who already hold deep safety stock or run a qualified second supplier need less of this \u2014 <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/%e3%83%87%e3%83%a5%e3%82%a2%e3%83%ab%e3%82%bd%e3%83%bc%e3%82%b7%e3%83%b3%e3%82%b0%e3%81%ae%e9%81%b8%e5%ae%9a\/\" target=\"_blank\" rel=\"noopener\">\u30c7\u30e5\u30a2\u30eb\u30bd\u30fc\u30b7\u30f3\u30b0\u306e\u9078\u5b9a<\/a> covers the second-supplier route, and this article covers the contractual route. The two are complements, not substitutes: dual sourcing protects against a foundry failure, while casting capacity reservation protects against a market squeeze inside a healthy foundry.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">How Foundries Plan Capacity: Melt, Molds and Machine Hours<\/h2>\n<p style=\"margin: 0 0 18px;\">A jobbing foundry builds its week from firm releases, then forecasts, then spot orders. The baseline part above consumes <strong style=\"color: #273171;\">78.5 t of melted metal per year<\/strong> at a 55% yield, about 1.6 t per week of melting \u2014 trivial next to a 1.5 t\/hour furnace, but only if the heats are scheduled. On the molding side the part needs about <strong style=\"color: #273171;\">48 flasks per week<\/strong> out of a line that molds 90 per day. On paper the foundry has room; in practice the line also serves eleven other part numbers, and every pattern changeover costs hours that <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/%e9%8b%b3%e9%80%a0%e3%81%ae%e8%87%aa%e5%8b%95%e5%8c%96\/\" target=\"_blank\" rel=\"noopener\">\u92f3\u9020\u306e\u81ea\u52d5\u5316<\/a> investment only partly compresses.<\/p>\n<p style=\"margin: 0 0 18px;\">The economics of the queue are unforgiving. If a line runs at 70% utilization, the average backlog is about 1.6 flasks deep and a rush order waits a day or two. Push utilization to 90% and the same queueing math gives a backlog roughly <strong style=\"color: #273171;\">5 times longer<\/strong> \u2014 this is why &#8220;we have capacity, just wait three weeks&#8221; and &#8220;we are 90% booked&#8221; are the same sentence. A reserved block \u2014 the core of casting capacity reservation \u2014 is the only mechanism that takes your flasks out of that queue, because they are committed before the week opens.<\/p>\n<p style=\"margin: 0 0 18px;\">\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">Why capacity, not price, is scarce at peak<\/h3>\n<hr style=\"width:100px;height:4px;background:#EF890D;border:none;border-radius:2px;margin:0 0 14px;line-height:0;opacity:1;\" \/>This is also why capacity, not price, is the scarce commodity at peak. A foundry quoting spot in October does not charge more because metal costs more; it charges more because the queue is long and someone without a contract is willing to pay to jump it. Buyers who understand this negotiate casting capacity reservation before the rush, not during it \u2014 the same seasonal logic that drives <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/%e9%8b%b3%e9%80%a0%e3%81%ae%e6%9c%80%e5%b0%8f%e6%b3%a8%e6%96%87%e6%95%b0%e9%87%8f\/\" target=\"_blank\" rel=\"noopener\">minimum order quantities<\/a> and tooling amortization decisions.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Anatomy of an Annual Framework Agreement for Castings<\/h2>\n<p style=\"margin: 0 0 18px;\">A workable annual framework agreement \u2014 the document that delivers casting capacity reservation \u2014 is five to eight pages long \u2014 but every element below must exist in writing, because each one is a failure mode seen repeatedly in disputes:<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Element<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">What it must say<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Why the buyer cares<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Forecast and volume band<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Annual forecast, monthly releases, and the \u00b1% band within which price holds<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Releases above the band are re-quoted at peak spot; the band is where the discount lives<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Price basis<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Fixed price, indexed price, or hybrid; validity and trigger bands<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Indexation passes metal cost through without renegotiation drama<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Reserved block<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Molds per week or machine-hours per week held for your parts<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">This is the {K} itself; without a number it is a promise, not capacity<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Release mechanics<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Firm window (e.g. 4 weeks) plus rolling 12-week forecast<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Foundry plans melt and line; buyer keeps flexibility inside the band<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Quality gates<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">FAI at start, re-FAI after long gaps, PPAP-level documentation<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">A restart after 6 idle months without re-FAI is the classic restart defect trap<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tooling and storage<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Ownership, storage location, readiness checks, refurbishment triggers<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Idle tooling degrades; storage fees and access rights belong in the same contract<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">The pricing element deserves emphasis. A 12-month fixed price with no index clause transfers all metal risk to the foundry, which quietly reprices it into a higher base; a fully indexed price transfers it to you. The hybrid that works in practice is a fixed conversion cost (labor, line, energy) plus a metal surcharge on net weight indexed to published ingot prices \u2014 the structure detailed in our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/%e9%8b%b3%e9%80%a0%e4%be%a1%e6%a0%bc%e3%81%ae%e8%aa%bf%e6%95%b4\/\" target=\"_blank\" rel=\"noopener\">casting price adjustment clauses<\/a> guide. Quality gates and acceptance criteria should be lifted directly from your <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/%e9%8b%b3%e9%80%a0%e5%93%81%e8%b3%aa%e5%8d%94%e5%ae%9a\/\" target=\"_blank\" rel=\"noopener\">\u54c1\u8cea\u5408\u610f\u66f8<\/a> \u305d\u3057\u3066 <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/casting-first-article-inspection\/\" target=\"_blank\" rel=\"noopener\">\u521d\u56de\u88fd\u54c1\u691c\u67fb<\/a> documents so the framework agreement references one quality system instead of inventing a second one.<\/p>\n<p style=\"margin: 0 0 18px;\">None of this replaces a clean <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/casting-rfq\/\" target=\"_blank\" rel=\"noopener\">\u92f3\u9020\u306b\u95a2\u3059\u308b\u898b\u7a4d\u4f9d\u983c<\/a>. The framework agreement is the output of an RFQ that already fixed the part, the process and the tolerances; it adds only volume, scheduling and price mechanics on top.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/11\/p254-capacity-2.webp\" alt=\"casting capacity reservation reserved molding line with sand flasks\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">A reserved block of molding line capacity: flasks scheduled for one part number before spot orders enter the weekly plan.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Casting Capacity Reservation Cost Models and the Real Math<\/h2>\n<p style=\"margin: 0 0 18px;\">Foundries price casting capacity reservation in four shapes. They are not equivalent, and the wrong shape for your demand profile converts a hedge into a liability.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">\u30e2\u30c7\u30eb<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">How the foundry charges<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Best fit<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Retainer block<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Monthly fee for a fixed molds\/week or hours\/week block; fee not credited against parts<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Steady demand, buyer wants scheduling priority without volume commitment<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Credited retainer<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Monthly fee, 100% credited against invoiced parts once volume exceeds a threshold<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Growth programs; foundry recovers the fee inside the volume<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Take-or-pay<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">No fee; buyer guarantees a billing floor (typically 80% of forecast) at contract price<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">High-confidence annual volume; strongest unit-price discount<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Volume-band pricing<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">No fee; price ladder with break points (e.g. 2,000 \/ 2,400 \/ 3,000 pcs)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Price-sensitive buyers with flexible scheduling who accept queue risk<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">Retainer versus the spot alternative<\/h3>\n<hr style=\"width:100px;height:4px;background:#EF890D;border:none;border-radius:2px;margin:0 0 14px;line-height:0;opacity:1;\" \/>Run the retainer against the alternative. Suppose the baseline part goes unreserved and a peak-season squeeze hits: 400 pieces must be bought at an <strong style=\"color: #273171;\">18% spot premium<\/strong> ($6.21 per piece = $2,484), plus one emergency air shipment of 1,350 kg at $5.50\/kg instead of $200 ocean freight ($7,225). Total exposure: <strong style=\"color: #273171;\">$9,709<\/strong>. A retainer of $5,400 per year for a 60-flask-per-week block breaks even when the annual probability of that squeeze exceeds <strong style=\"color: #273171;\">55.6%<\/strong>. If your category has squeezed even once in the last two years \u2014 and most foundry-heavy categories have \u2014 the retainer is already priced like insurance bought after the fire.<\/p>\n<p style=\"margin: 0 0 18px;\">Volume-band pricing is the seductive zero-fee cousin of casting capacity reservation, but read the ladder honestly. At $36.80 \/ $34.50 \/ $32.90 for 2,000 \/ 2,400 \/ 3,000 pieces, the band buyer at 2,400 units pays nothing visible \u2014 and gives up scheduling priority entirely. When the queue is 5\u00d7 deeper at peak, the expected cost of that queue is exactly what the retainer buyer paid to avoid; <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/casting-total-cost-of-ownership\/\" target=\"_blank\" rel=\"noopener\">\u7dcf\u6240\u6709\u30b3\u30b9\u30c8<\/a> accounting that leaves scheduling risk off the sheet systematically flatters the cheapest quote.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Flex Bands, Take-or-Pay and Downside Risk<\/h2>\n<p style=\"margin: 0 0 18px;\">The take-or-pay floor is where buyers either get paid for their discipline or punished for their optimism. On the baseline part, an 80% floor means billing for <strong style=\"color: #273171;\">1,920 pieces<\/strong> minimum at $34.50; the release band is <strong style=\"color: #273171;\">1,920\u20132,880 pieces<\/strong> at contract price, with volumes above the band re-quoted. If demand drops 25% to 1,800 pieces, the unused 120 pieces cost <strong style=\"color: #273171;\">$4,140<\/strong> \u2014 the price of the discount you took on the other 1,800.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Demand scenario<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Retainer block (${retainer:,.0f}\/yr)<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Take-or-pay 80% floor<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Demand \u221225% (1,800 pcs)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Fee sunk, no volume penalty<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pay for 120 unused pieces: $4,140<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Demand on plan (2,400 pcs)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Fee is the only overhead; contract price held all year<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Zero penalty; deepest unit discount<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Demand +30% (3,120 pcs)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Band exceeded; excess at quoted surge rate (cap it, see clause 7)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Above band; re-quote at spot unless surge cap negotiated<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Two structural safeguards keep the take-or-pay side of casting capacity reservation honest. First, a <strong style=\"color: #273171;\">quarterly true-up<\/strong> instead of annual: unused floor volume converts to credit toward next quarter rather than cash, so a soft Q1 does not write off the year. Second, the floor should be defined on <strong style=\"color: #273171;\">billing, not delivery<\/strong> \u2014 otherwise a foundry that ships late converts your floor into a double penalty. Both are standard commercial terms; neither appears unless the buyer asks, and both belong next to the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/casting-payment-terms\/\" target=\"_blank\" rel=\"noopener\">payment terms<\/a> milestones in the same contract family.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">When Casting Capacity Reservation Is a Bad Deal<\/h2>\n<p style=\"margin: 0 0 18px;\">Not every part justifies casting capacity reservation. Three patterns argue against it:<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Commodity, low-value parts.<\/strong> A gray iron counterweight with dozens of alternative suppliers has no capacity risk worth insuring; spot plus two qualified alternates beats any retainer.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Already-deep inventory.<\/strong> If you hold 12 weeks of safety stock, a queue delay is absorbed silently. Reservation is for the weeks you cannot buffer \u2014 machining-bound parts where the casting is the pacing item for a <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/cnc-machining-services\/\" target=\"_blank\" rel=\"noopener\">CNC\u52a0\u5de5<\/a> cell.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Hard seasonal shapes.<\/strong> Five months of demand followed by seven months of silence does not fit an annual block; the foundry cannot hold line capacity it cannot resell.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">Seasonal parts get a seasonal answer. A 4,800-piece bracket concentrated in 20 production weeks needs <strong style=\"color: #273171;\">240 flasks per week<\/strong> for one season. The workable structure is a five-month seasonal retainer ($450 \u00d7 5 = <strong style=\"color: #273171;\">$2,250<\/strong>, about <strong style=\"color: #273171;\">$0.47 per piece<\/strong> \u2014 1.2% of unit price) with the block reverting to the foundry&#8217;s open market in the off-season, tooling moving to paid storage, and a re-<a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/casting-first-article-inspection\/\" target=\"_blank\" rel=\"noopener\">\u521d\u56de\u88fd\u54c1\u691c\u67fb<\/a> checkpoint before each season restarts. The off-season gap is the restart defect window; the agreement should pay for the checkpoint, not argue about it in April.<\/p>\n<p style=\"margin: 0 0 18px;\">One more boundary: casting capacity reservation does not hedge price, it hedges schedule. If your exposure is metal cost, the indexed surcharge clause is the instrument; if your exposure is a foundry failure, it is dual sourcing. Buying schedule insurance against a price risk wastes the premium in both directions \u2014 the risk-map step in a casting <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/%e9%8b%b3%e9%80%a0%e3%82%b5%e3%83%97%e3%83%a9%e3%82%a4%e3%83%a4%e3%83%bc%e3%81%ae%e7%9b%a3%e6%9f%bb\/\" target=\"_blank\" rel=\"noopener\">supplier audit<\/a> is where that diagnosis belongs.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/11\/p254-capacity-3.webp\" alt=\"casting capacity reservation export crates of castings ready on schedule\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Reserved releases ship on the promised window: export crates staged and loaded without the peak-season queue.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Nine Clauses That Make the Agreement Enforceable<\/h2>\n<p style=\"margin: 0 0 18px;\">A handshake about &#8220;priority&#8221; is worthless the week a bigger customer calls. These nine clauses are what make casting capacity reservation enforceable in practice \u2014 use them as a checklist against any draft the foundry sends:<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Reserved block definition.<\/strong> State the number: molds per week, machine-hours per week, or furnace tons. No number, no reservation.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Release mechanics.<\/strong> Firm orders 4 weeks out; rolling 12-week forecast updated monthly; forecast inside the band is planning data, not commitment.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Flex band and band-edge pricing.<\/strong> \u00b120% releases at contract price; state the mechanism (not just the possibility) for quoting volumes above the band.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Take-or-pay floor and true-up.<\/strong> Billing floor, quarterly true-up in credit, floor on billing not delivery.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Price basis and validity.<\/strong> Fixed conversion cost plus indexed metal surcharge; 12-month validity with defined trigger bands.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Lead-time guarantee.<\/strong> Reserved releases ship within a stated window of release (e.g. 15 working days) or the foundry funds expedite freight. This single clause converts scheduling into money.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Surge cap.<\/strong> Volumes above the band are priced at spot, capped at contract price + a stated percentage \u2014 the 18% open-ended premium is what this clause deletes.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Tooling storage and readiness.<\/strong> Ownership stays with the buyer; storage fee stated; readiness check and refurbishment triggers defined, with costs allocated as in the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/%e9%8b%b3%e9%80%a0%e7%94%a8%e9%87%91%e5%9e%8b%e3%81%ae%e3%82%b3%e3%82%b9%e3%83%88\/\" target=\"_blank\" rel=\"noopener\">\u92f3\u9020\u7528\u91d1\u578b\u306e\u30b3\u30b9\u30c8<\/a> structure.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Termination and wind-down.<\/strong> 90-day notice; final release honored at contract price; tooling returned within 15 days of final payment; no hostage clauses.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">Attach the part-specific documents rather than restating them: the approved drawing, the acceptance criteria from your quality agreement, and the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%82%bd%e3%83%aa%e3%83%a5%e3%83%bc%e3%82%b7%e3%83%a7%e3%83%b3\/%e9%8b%b3%e9%89%84%e7%89%a9\/\" target=\"_blank\" rel=\"noopener\">iron casting solutions<\/a> process specification. The framework agreement should reference one revision of each; a contract that silently points at an outdated revision is how good agreements drift into disputes. Before the contract stage, the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%96%e3%83%ad%e3%82%b0\/%e9%87%91%e5%b1%9e%e9%8b%b3%e9%80%a0%e3%82%ac%e3%82%a4%e3%83%89\/\" target=\"_blank\" rel=\"noopener\">\u91d1\u5c5e\u92f3\u9020\u30ac\u30a4\u30c9<\/a> covers the process and specification basics the agreement assumes.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">\u3088\u304f\u3042\u308b\u8cea\u554f<\/h2>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Is casting capacity reservation the same as a blanket purchase order?<\/h3>\n<p style=\"margin: 0 0 18px;\">No. A blanket PO commits volume and price but no schedule; casting capacity reservation commits schedule and capacity. The strongest agreements combine both \u2014 blanket pricing on top of a reserved molding block \u2014 but they answer different questions and are negotiated separately.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">How much does a reserved block typically cost?<\/h3>\n<p style=\"margin: 0 0 18px;\">Retainers run <strong style=\"color: #273171;\">$300\u2013$900 per month<\/strong> for a small sand casting block, scaling with the size of the block and the scarcity of the process. The baseline model above uses $450\/month for 60 flasks per week \u2014 about $0.10 per casting at the model volume, against a $6.21 spot premium and $7,225 expedite exposure.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Can a reserved block work for investment castings?<\/h3>\n<p style=\"margin: 0 0 18px;\">Yes, but the unit changes. <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%ad%e3%82%b9%e3%83%88%e3%83%af%e3%83%83%e3%82%af%e3%82%b9%e9%8b%b3%e9%80%a0\/\" target=\"_blank\" rel=\"noopener\">\u30ed\u30b9\u30c8\u30ef\u30c3\u30af\u30b9\u92f3\u9020<\/a> capacity is reserved in shell-building and dewax batch slots plus wax press hours, not flasks. The economics are identical; only the unit of scarcity changes, and the same nine clauses apply.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">What happens if the foundry oversells the reserved block?<\/h3>\n<p style=\"margin: 0 0 18px;\">This is why clause 6 exists. If your release ships late because the block was double-sold, the lead-time guarantee makes the foundry fund expedite freight or credit the retainer. Without that clause, an oversold block costs you the queue wait you paid to avoid.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Does a reserved block make sense for <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e3%83%80%e3%82%a4%e3%82%ab%e3%82%b9%e3%83%88%e3%82%b5%e3%83%bc%e3%83%93%e3%82%b9\/\" target=\"_blank\" rel=\"noopener\">\u30c0\u30a4\u30ab\u30b9\u30c8<\/a> parts?<\/h3>\n<p style=\"margin: 0 0 18px;\">Usually yes, and earlier than for sand castings: die capacity is sold in machine-hours against a fixed tool, and a reserved window is the only way to guarantee weekly releases between larger automotive-style campaigns.<\/p>\n\t\t<div data-elementor-type=\"section\" data-elementor-id=\"3550\" class=\"elementor elementor-3550\" data-elementor-post-type=\"elementor_library\">\n\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-19b1acf1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"19b1acf1\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;,&quot;ekit_has_onepagescroll_dot&quot;:&quot;yes&quot;}\">\n\t\t\t\t\t\t\t<div class=\"elementor-background-overlay\"><\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-56e26ed6\" data-id=\"56e26ed6\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-52c3d00c elementor-widget elementor-widget-elementskit-heading\" data-id=\"52c3d00c\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"elementskit-heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"ekit-wid-con\" ><div class=\"ekit-heading elementskit-section-title-wraper text_left   ekit_heading_tablet-   ekit_heading_mobile-\"><h3 class=\"ekit-heading--title elementskit-section-title\">\u4fe1\u983c\u3067\u304d\u308b\u4e2d\u56fd\u306e\u91d1\u5c5e\u92f3\u9020\u5de5\u5834\u3092\u304a\u63a2\u3057\u3067\u3059\u304b\uff1f<\/h3><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24c75aa0 elementor-widget elementor-widget-text-editor\" data-id=\"24c75aa0\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>\u5f53\u793e\u306f\u3001\u304a\u5ba2\u69d8\u306e\u88fd\u54c1\u8a2d\u8a08\u306e\u6700\u9069\u5316\u3068\u30b3\u30b9\u30c8\u524a\u6e1b\u3092\u304a\u624b\u4f1d\u3044\u3044\u305f\u3057\u307e\u3059\u3002.<\/li><li>\u9ad8\u54c1\u8cea\u3067\u5927\u91cf\u751f\u7523\u306e\u92f3\u9020\u90e8\u54c1\u306b\u3064\u3044\u3066\u3001\u5f0a\u793e\u304c\u304a\u624b\u4f1d\u3044\u3044\u305f\u3057\u307e\u3059\u3002.<\/li><li>\u7d0d\u671f\u901a\u308a\u306b\u7d0d\u54c1\u3057\u3001\u3055\u3089\u306a\u308b\u8ca9\u58f2\u6a5f\u4f1a\u3092\u7372\u5f97\u3059\u308b\u3053\u3068\u304c\u3067\u304d\u307e\u3059\u3002.<\/li><li>Supro MFG\u306e\u91d1\u5c5e\u92f3\u9020\u30b5\u30fc\u30d3\u30b9\u3092\u3054\u5229\u7528\u3044\u305f\u3060\u3051\u308c\u3070\u3001\u5927\u304d\u306a\u30e1\u30ea\u30c3\u30c8\u304c\u5f97\u3089\u308c\u307e\u3059\u3002.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-51a20937 elementor-align-left elementor-widget elementor-widget-global elementor-global-1143 elementor-widget-button\" data-id=\"51a20937\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm elementor-animation-grow\" href=\"https:\/\/chinametalfoundry.com\/ja\/%e9%80%a3%e7%b5%a1%e5%85%88\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">\u5de5\u5834\u76f4\u63a5\u306e\u898b\u7a4d\u3082\u308a\u3092\u4f9d\u983c\u3059\u308b <\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t\n<p class=\"sc-note\" style=\"font-size: 13px; color: #9a9a9a; margin: 28px 0 0;\">*Cost models reference NADCA and ICC contract practice and Supro MFG shop-floor scheduling records.<\/p>\n<\/article>","protected":false},"excerpt":{"rendered":"<p>Every foundry has busy months. When a molding line runs at 90% utilization, the buyer without a contract waits three [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":8214,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[51],"tags":[47,50,49,42],"class_list":["post-8213","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casting-processes","tag-casting-process","tag-casting-selection","tag-manufacturing-process","tag-metal-casting"],"_links":{"self":[{"href":"https:\/\/chinametalfoundry.com\/ja\/wp-json\/wp\/v2\/posts\/8213","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/chinametalfoundry.com\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chinametalfoundry.com\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/ja\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/ja\/wp-json\/wp\/v2\/comments?post=8213"}],"version-history":[{"count":6,"href":"https:\/\/chinametalfoundry.com\/ja\/wp-json\/wp\/v2\/posts\/8213\/revisions"}],"predecessor-version":[{"id":8222,"href":"https:\/\/chinametalfoundry.com\/ja\/wp-json\/wp\/v2\/posts\/8213\/revisions\/8222"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/ja\/wp-json\/wp\/v2\/media\/8214"}],"wp:attachment":[{"href":"https:\/\/chinametalfoundry.com\/ja\/wp-json\/wp\/v2\/media?parent=8213"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/ja\/wp-json\/wp\/v2\/categories?post=8213"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/ja\/wp-json\/wp\/v2\/tags?post=8213"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}