{"id":7971,"date":"2026-10-15T04:25:09","date_gmt":"2026-10-15T04:25:09","guid":{"rendered":"https:\/\/chinametalfoundry.com\/?p=7971"},"modified":"2026-10-15T04:25:09","modified_gmt":"2026-10-15T04:25:09","slug":"casting-packaging","status":"publish","type":"post","link":"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-packaging\/","title":{"rendered":"Casting Packaging: Export Crating, Rust Prevention and Freight Damage Control"},"content":{"rendered":"<article class=\"sc-article\" style=\"max-width: 820px; margin: 0 auto; font-family: 'Poppins',sans-serif; color: #7e7e7e; font-size: 16px; line-height: 1.7;\">\n<div class=\"sc-intro\" style=\"background: #F5F5F5; border-radius: 20px; padding: 22px 24px; font-style: italic; color: #3a3a3a; margin: 0 0 26px; line-height: 1.6;\">\n<p style=\"margin: 0;\">A container of castings can survive five weeks at sea and still fail the moment the crate is opened \u2014 rust blooms on a machined bore, a crushed bottom crate, a missing IPPC stamp that holds the shipment at customs. <strong style=\"color: #273171;\">Casting packaging<\/strong> is the last process step nobody writes into the drawing, and the first one the buyer blames when parts land unusable.<\/p>\n<\/div>\n<p style=\"margin: 0 0 18px;\">This guide treats casting packaging as an engineering and cost problem, not a packing-list afterthought. It covers the four-layer protection system, how much water actually condenses inside a 40 ft container on a tropical route, what <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.ippc.int\/\" target=\"_blank\" rel=\"noopener\">ISPM-15<\/a> means for your crates, how to size desiccant, and when an upgraded packaging spec pays for itself \u2014 with two cost models you can copy into your own RFQ. Standards and practice notes referenced from <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.afsinc.org\" target=\"_blank\" rel=\"noopener\">AFS<\/a> et <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.astm.org\" target=\"_blank\" rel=\"noopener\">ASTM<\/a>.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p232-casting-packaging-1.webp\" alt=\"casting packaging export crate with gray iron castings secured on a wooden pallet\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Export crating is a load-bearing structure, not a box: the bottom crate in a three-high stack carries the two above it.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Why Casting Packaging Belongs in the Cost Model, Not the Packing List<\/h2>\n<p style=\"margin: 0 0 18px;\">Packaging typically runs <strong style=\"color: #273171;\">1.5\u20133% of landed part value<\/strong> for machined castings and 3\u20136% for heavy iron parts, because a crate heavy enough to survive stacking costs more than the corrosion protection inside it. That number looks small next to tooling or <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/repartition-des-couts-de-moulage\/\" target=\"_blank\" rel=\"noopener\">casting cost per piece<\/a>, which is why it gets delegated to whoever is loading the truck.<\/p>\n<p style=\"margin: 0 0 18px;\">The damage it prevents does not look small. A 1.8% arrival-defect rate on a 24,000-piece annual program is 432 parts that either get reworked, get scrapped, or trigger a customer complaint and an 8D report. Weighted at roughly $150 of real cost per incident part \u2014 rework labour, replacement value, freight both ways, and internal quality handling \u2014 that is about <strong style=\"color: #273171;\">$65,000 a year<\/strong> decided by a $10-per-crate decision.<\/p>\n<p style=\"margin: 0 0 18px;\">There is also a schedule dimension. Packaging failures are discovered at goods-in, weeks after the parts were made, so a replacement has to restart the whole chain \u2014 which is exactly the delay pattern mapped out in our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-lead-time\/\" target=\"_blank\" rel=\"noopener\">casting lead time<\/a> breakdown. A crate that costs $10 more is cheap insurance against a five-week loop.<\/p>\n<p style=\"margin: 0 0 18px;\">If you are new to the process side, start with our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/guide-sur-la-fonderie-des-metaux\/\" target=\"_blank\" rel=\"noopener\">Guide sur la fonderie des m\u00e9taux<\/a> and then come back to this page \u2014 every casting packaging decision below depends on how the part was made, what alloy it is, and what condition its surface is in when it reaches the packing bench.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">The Four Layers of a Casting Packaging System<\/h2>\n<p style=\"margin: 0 0 18px;\">Every export-ready casting packaging build is four independent systems stacked on each other. Failures happen when one layer is asked to do another layer&#8217;s job \u2014 for example expecting a desiccant sachet to compensate for a crate that lets rain in.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Layer<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">What it does<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Typical materials<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1. Surface protection<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Stops corrosion on bare or machined metal<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Rust-preventive oil, VCI paper or VCI film, primer or topcoat<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2. Moisture control<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Keeps the micro-climate dry for the whole voyage<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Desiccant (CaCl\u2082 or clay), PE liner, sealed bag<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3. Cushioning and separation<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Stops part-to-part contact damage in transit<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">EPE foam sheet, corrugated dividers, edge protectors, dunnage<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">4. Containment and unitisation<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Carries stacking load, survives handling, moves as one unit<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Plywood crate, pallet, steel or PET strapping, stretch film<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Layers 1 and 2 are chemistry; layers 3 and 4 are mechanics. Most buyer specifications get layer 4 right \u2014 everyone argues about crate thickness \u2014 and leave layers 1 and 2 to the supplier&#8217;s default, which is where corrosion claims come from. A good casting packaging spec states all four layers explicitly, because the supplier&#8217;s default is built for the cheapest route that usually works.<\/p>\n<p style=\"margin: 0 0 18px;\">Layer 1 is not always a packing decision. If the part is primed, painted or otherwise treated before it reaches the packer, that treatment is the real first layer \u2014 see how <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/services-de-traitement-de-surface\/\" target=\"_blank\" rel=\"noopener\">surface treatment<\/a> et <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/heat-treatment-services\/\" target=\"_blank\" rel=\"noopener\">traitement thermique<\/a> change what the packer is protecting. Writing a casting packaging clause without knowing the surface state is guesswork.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Rust Prevention: Oil, VCI, Desiccant or Coating<\/h2>\n<p style=\"margin: 0 0 18px;\">Pick the casting packaging protection method from the surface condition and the voyage length, not from habit. As-cast surfaces with intact mill scale or paint tolerate a lot; a machined bore at Ra 1.6 \u00b5m will flash-rust in a humid afternoon.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Method<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Typical salt-spray resistance (ASTM B117)<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Best used for<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">No protection (as-cast, dry store)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">4\u20138 h before first rust spots<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Domestic or short inland moves only<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Thin rust-preventive oil film<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">24\u201372 h<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machined faces on short sea legs; cheap, but needs degreasing at goods-in<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">VCI paper or VCI bag, sealed<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">200\u2013400 h equivalent protection in a closed pack<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Default for machined castings on 30\u201345 day ocean routes<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Primer or topcoat (epoxy, polyurethane)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">500\u20131,000 h<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">As-cast parts stored outdoors at destination; see <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-surface-finishing\/\" target=\"_blank\" rel=\"noopener\">casting surface finishing<\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">VCI + desiccant + PE liner (combined)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Voyage-rated, not hour-rated<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">High-value machined parts, tropical routes, long dwell at port<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">How much water actually condenses inside a 40 ft container<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">&#8220;Container rain&#8221; is not a myth, and it is easy to size. Take a 40 ft high-cube container with 76 m\u00b3 of internal volume loaded on a humid day:<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Air at 30 \u00b0C \/ 80% RH<\/strong> holds about 24.3 g of water per m\u00b3 \u2192 76 \u00d7 24.3 \u2248 <strong style=\"color: #273171;\">1.85 kg<\/strong> of water vapour in the box.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Cooled overnight to 15 \u00b0C<\/strong>, saturation drops to about 12.8 g\/m\u00b3 \u2192 only 0.97 kg can stay airborne.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Difference \u2248 0.88 kg<\/strong> condenses on the coldest surface available \u2014 usually the container roof, then drips onto your crates.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">The bigger source is the wood itself. A crate and pallet set weighing 250 kg at 15% moisture content carries about <strong style=\"color: #273171;\">37 kg of water<\/strong>; a 35-day voyage releases a few percent of that into the box \u2014 roughly 1.5 kg in our example \u2014 and the day\/night condensation cycle repeats every night of the trip.<\/p>\n<p style=\"margin: 0 0 18px;\">So the first-cycle load is about 2.7 kg (0.9 kg from air + 1.5 kg from wood + ~0.3 kg from cartons and dunnage), and it recurs. That is why the practical industry rule for a 40 ft box is <strong style=\"color: #273171;\">12\u201316 kg of desiccant<\/strong> (roughly 24\u201332 sachets of 500 g CaCl\u2082), not the 3 kg the single-cycle arithmetic suggests. Specify the desiccant type and count in the packaging clause \u2014 &#8220;include desiccant&#8221; is not a specification.<\/p>\n<p style=\"margin: 0 0 18px;\">Sizing desiccant for the air and forgetting the wood is the most common casting packaging mistake we see on inbound claims: the sachets are present, the count was never calculated, and the parts still arrive wet. Aluminium parts are especially unforgiving here \u2014 see <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/aluminum-alloy-castings-protection-how-to-prevent-white-rust-and-corrosion\/\" target=\"_blank\" rel=\"noopener\">white rust and corrosion on aluminium castings<\/a> for what humidity does to bare alloy surfaces.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p232-casting-packaging-2.webp\" alt=\"casting packaging VCI paper and desiccant sachets protecting a machined aluminum casting on a bench\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Layer 1 and 2: VCI wrap plus desiccant. Together they cost a few dollars per crate and remove most corrosion claims.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Crates, Pallets and ISPM-15: The Compliance Layer<\/h2>\n<p style=\"margin: 0 0 18px;\">Solid wood packaging moving across most borders must be treated and marked under ISPM-15: heat treatment to a minimum core temperature of 56 \u00b0C for 30 minutes, or fumigation, then stamped with the IPPC symbol, country code, treatment provider number and the treatment code (HT or MB). Plywood, OSB and other engineered wood panels are already exempt \u2014 they are manufactured under heat and pressure \u2014 which is why <strong style=\"color: #273171;\">plywood crates remove the compliance risk entirely<\/strong>.<\/p>\n<p style=\"margin: 0 0 18px;\">The casting packaging failure mode here is expensive and dumb: an unmarked or wrongly marked crate can be held at destination for re-treatment, fumigation, or re-export, at four-figure cost per container plus weeks of delay. If your route includes the EU, US, Australia or China, put &#8220;ISPM-15 compliant, HT-marked, or engineered panel crate&#8221; in writing.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">Stacking load: design the bottom crate, not the top one<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">Crates are usually stacked three high in a container and sometimes four in a warehouse. A 480 kg crate in a three-high stack means the bottom crate&#8217;s lid and side panels are carrying <strong style=\"color: #273171;\">960 kg<\/strong> of static load \u2014 before any dynamic factor from road or rail vibration. That is the number to give your supplier: &#8220;crate must carry 2\u00d7 its own gross weight in a three-high stack.&#8221;<\/p>\n<p style=\"margin: 0 0 18px;\">Practical details that decide whether that holds: continuous bottom runners (100 \u00d7 100 mm is a common minimum for heavy iron), panels screwed rather than nailed at the corners, strapping over the lid and around the base, and a pallet base that lets a forklift enter from at least two sides. Corner protectors under the strapping stop the strap from crushing the panel edge \u2014 a common cause of lid damage on arrival.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">Container loading: know whether you are volume-limited or weight-limited<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">A 40 ft high-cube box gives you roughly 65 m\u00b3 of usable volume and a payload of about 22,800 kg net (26,500 kg gross limit minus ~3,700 kg tare). Which limit bites first depends entirely on the alloy:<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Aluminium housings, 6.5 kg each.<\/strong> 32 parts per 1,200 \u00d7 800 mm pallet at 1.1 m height = 1.056 m\u00b3 and 233 kg per pallet. Volume limit: 65 \u00f7 1.056 \u2248 <strong style=\"color: #273171;\">61 pallets \u2248 1,950 parts<\/strong>, weighing only 14,200 kg \u2014 <strong style=\"color: #273171;\">volume-limited<\/strong>, with payload to spare. Typical of high-volume <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/services-de-moulage-sous-pression\/\" target=\"_blank\" rel=\"noopener\">moulage sous pression<\/a> et <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/solutions\/coulee-daluminium\/\" target=\"_blank\" rel=\"noopener\">moulage d'aluminium<\/a> programs.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Ductile iron valve bodies, 42 kg each.<\/strong> Six per crate at 0.297 m\u00b3 and 274 kg gross. Weight limit: 22,800 \u00f7 274 \u2248 <strong style=\"color: #273171;\">83 crates \u2248 498 parts<\/strong>, filling only 24.6 m\u00b3 \u2014 <strong style=\"color: #273171;\">weight-limited<\/strong>, using 38% of the volume. Typical of <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/moulage-au-sable\/\" target=\"_blank\" rel=\"noopener\">moulage au sable<\/a> et <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/valve-casting\/\" target=\"_blank\" rel=\"noopener\">valve casting<\/a> work.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">That second case has a trap: the ISO payload is not always the binding limit. Many inland trucking legs, particularly in North America, cap 40 ft cargo closer to <strong style=\"color: #273171;\">19,000\u201320,000 kg<\/strong>, which cuts the iron example to about 70 crates. Always confirm the routing weight limit before you quote a container quantity for heavy castings \u2014 and if your parts are iron or steel, check the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/solutions\/iron-casting\/\" target=\"_blank\" rel=\"noopener\">iron casting<\/a> et <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/solutions\/piece-moulee-en-acier\/\" target=\"_blank\" rel=\"noopener\">pi\u00e8ce moul\u00e9e en acier<\/a> pages for typical piece weights before you plan a load.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Machined Surfaces Need a Different Casting Packaging Spec<\/h2>\n<p style=\"margin: 0 0 18px;\">A single crate of casting packaging often contains both as-cast and machined surfaces, and they do not need \u2014 or tolerate \u2014 the same treatment. Machined faces must arrive clean and dry, so heavy greasing creates a degreasing step at goods-in; as-cast faces are rough enough to hold a coating and are far less corrosion-sensitive when painted.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Surface condition<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Minimum protection for ocean freight<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Separation requirement<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">As-cast, blasted, unpainted<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">VCI + desiccant; no oil needed if packed dry<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Cardboard or foam between parts<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">As-cast, primed or topcoated<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Paint film intact; touch-up before packing<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Edge protectors at contact points<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machined, Ra 1.6\u20133.2 \u00b5m<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">VCI paper wrap or bag + desiccant + sealed PE liner<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Individual wrap, no part-to-part metal contact<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machined + threaded holes or bores<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">VCI plus plugs or caps on threaded features<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Plastic caps; foam sheet between layers<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machined, customer-specified clean (no oil)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">VCI only \u2014 oil is prohibited by spec<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Sealed bag with desiccant inside the bag<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Where machined faces come from a CNC route rather than the foundry, agree the packaging interface in writing: the foundry ships protected as-cast parts, the machining shop re-protects after cutting. Our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/cnc-machining-services\/\" target=\"_blank\" rel=\"noopener\">CNC machining services<\/a> et <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-machining-allowance\/\" target=\"_blank\" rel=\"noopener\">casting machining allowance<\/a> guide both assume the final packer owns that last protection step.<\/p>\n<p style=\"margin: 0 0 18px;\">Near-net-shape processes change the requirement again. <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/fonderie-a-cire-perdue\/\" target=\"_blank\" rel=\"noopener\">Moulage de pr\u00e9cision<\/a> parts often arrive with tight as-cast tolerances and cosmetic surfaces that must not be marked by contact, while <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/lost-wax-casting-services\/\" target=\"_blank\" rel=\"noopener\">lost wax casting<\/a> parts with fine detail need individual cushioning rather than bulk dunnage. In both cases the casting packaging spec has to be written per part family, not per shipment.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p232-casting-packaging-3.webp\" alt=\"casting packaging shipping marks and barcode label on a strapped crate of metal castings\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Layer 4 plus traceability: strapped, marked and barcoded, with the crate number visible on two faces.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Labels, Lot Numbers and the Packing List<\/h2>\n<p style=\"margin: 0 0 18px;\">Casting packaging is also the last chance to carry traceability into the customer&#8217;s warehouse. Every crate should be labelled with part number, revision, purchase order, heat or lot number, net and gross weight, and crate sequence (1 of 24). The lot number on the crate must match the lot number on the inspection report \u2014 that link is what makes an <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-first-article-inspection\/\" target=\"_blank\" rel=\"noopener\">first article inspection<\/a> package usable at goods-in six weeks later.<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Shipping marks.<\/strong> Stencil or printed label on at least two adjacent faces of each crate; ink that survives condensation, not a paper label under the strapping.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Barcode.<\/strong> GS1-128 or Code 128 on the crate label, encoding part number and lot \u2014 scanning beats transcription when 24 crates arrive at once.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Packing list.<\/strong> One line per crate, weights and counts matching the marks, plus a waterproof copy taped inside crate #1 and an emailed PDF set sent on departure.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Handling marks.<\/strong> &#8220;This way up&#8221;, sling points, and centre-of-gravity marks on anything over 500 kg \u2014 a crate that tips in the yard is a crate that arrives damaged.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">For programs that already specify incoming inspection, align the crate count with the sampling plan so a lot is not split across crates in a way that forces opening everything. The sampling maths in our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-inspection-methods\/\" target=\"_blank\" rel=\"noopener\">casting inspection methods<\/a> article assumes lots are identifiable as packed.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">What to Put in the Packaging Clause of Your Casting RFQ<\/h2>\n<p style=\"margin: 0 0 18px;\">Casting packaging is one of the fastest ways to make a quote comparable between suppliers, because it is invisible until it fails. Add these lines to the RFQ \u2014 the rest of the request is covered in our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-rfq\/\" target=\"_blank\" rel=\"noopener\">casting RFQ<\/a> checklist:<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Voyage profile.<\/strong> Destination port, expected transit days, and whether there is outdoor storage at destination. 35 days through the tropics and 12 days to Rotterdam are different specifications.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Surface protection.<\/strong> VCI type and grade, or oil type if oil is allowed, and whether machined faces must arrive oil-free.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Desiccant.<\/strong> Type and total mass per crate, plus per-container total. Write the number, not &#8220;as required&#8221;.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Crate spec.<\/strong> Plywood or ISPM-15 HT solid wood, panel thickness, runner size, strapping, and the stacking load the crate must survive.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Parts per crate and crate dimensions.<\/strong> Fixes the container count and the freight quote, and stops the &#8220;we optimised it later&#8221; surprise.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Labelling and documents.<\/strong> Mark content, barcode format, packing list format, and whether photos of the loaded crate are required before release.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">Ask for photos of the first crate \u2014 closed, strapped, and labelled \u2014 before the container is sealed. It takes a day and prevents an entire shipment going out with the wrong marks.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">When an Upgraded Casting Packaging Spec Pays for Itself<\/h2>\n<p style=\"margin: 0 0 18px;\">Two annual programs, one upgrade decision each. Both use the same incremental package: VCI wrap, two extra 500 g desiccant sachets, and EPE dividers plus edge protectors \u2014 about <strong style=\"color: #273171;\">+$10.30 per crate<\/strong>. No change to crate type, which is the point: the expensive part of casting packaging is the crate, and you rarely need to change it.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Item<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Case A \u2014 machined aluminium housing<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Case B \u2014 painted ductile iron pump body<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Annual volume \/ parts per crate<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">24,000 \/ 12 \u2192 2,000 crates<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">8,000 \/ 6 \u2192 1,333 crates<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Voyage<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">35 days, tropical route, machined faces<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">12 days, temperate route, painted as-cast<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Arrival defect rate today<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.80% \u2192 432 parts\/year<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.40% \u2192 32 parts\/year<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Annual damage cost today<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$53,424 (rework $10,944 + scrap $37,440 + 12 complaints $5,040)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$3,840 (~$120\/part weighted)<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Rate after upgrade<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.45% \u2192 108 parts\/year<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.25% \u2192 20 parts\/year<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Annual damage cost after<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$13,356<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$2,400<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Upgrade cost<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2,000 \u00d7 $10.30 = $20,600<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1,333 \u00d7 $10.30 = $13,730<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">Net annual result<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">+$19,468 saved (ROI \u2248 1.9\u00d7)<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">\u2013$12,290 \u2014 do not upgrade<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">The rule that falls out of the two cases: <strong style=\"color: #273171;\">an upgraded casting packaging spec pays when the voyage is long and the surfaces are machined<\/strong>. Break-even in Case A is a defect-rate reduction of about 0.57 percentage points (137 parts\/year \u00d7 ~$150 weighted cost \u2248 $20,600); the measured reduction is 1.35 points, so there is real margin. In Case B the whole annual damage bill is smaller than the upgrade cost, so the money belongs in crate strength and paint integrity, not in VCI and desiccant.<\/p>\n<p style=\"margin: 0 0 18px;\">One more casting packaging lever that costs nothing: reduce the number of crate openings at destination. If parts are packed in the sequence the line consumes them, they spend less time open in a humid warehouse \u2014 which is where a surprising share of &#8220;arrival rust&#8221; actually happens.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">FAQ<\/h2>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">How much does export casting packaging add to part cost?<\/h3>\n<p style=\"margin: 0 0 18px;\">Typically 1.5\u20133% of part value for machined castings and 3\u20136% for heavy iron parts, where the crate itself dominates. Casting packaging is quoted per crate, so the honest way to compare two suppliers is cost per shipped part, not cost per crate. On a $180 machined housing that is roughly $3\u20135 per part; on a 28 kg iron body it is closer to $3\u20136, mostly crate and pallet.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Is VCI enough, or do I also need desiccant?<\/h3>\n<p style=\"margin: 0 0 18px;\">For a 30\u201345 day ocean voyage, use both. VCI protects the metal surface chemically; desiccant removes the water that would otherwise condense and drip. Our 40 ft example generates about 0.9 kg of condensation from the air alone on the first night and roughly 1.5 kg from the wood over the voyage, which is why the practical desiccant load is 12\u201316 kg per 40 ft container.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Do plywood crates really avoid ISPM-15 treatment?<\/h3>\n<p style=\"margin: 0 0 18px;\">Yes. Plywood, OSB, particleboard and similar engineered panels are manufactured under heat and pressure and are exempt from ISPM-15 treatment and marking. Solid wood \u2014 including pallets, dunnage and bracing \u2014 is not exempt and must be HT- or MB-treated and stamped.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Who is responsible for packaging under FOB versus EXW?<\/h3>\n<p style=\"margin: 0 0 18px;\">Under FOB the seller packs for export and loads the vessel; under EXW the buyer collects, so the buyer must specify the export packaging in the order or the parts will arrive in domestic packing. Either way, write the packaging clause into the PO \u2014 the Incoterm allocates cost, not the specification.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Can we send our own casting packaging specification?<\/h3>\n<p style=\"margin: 0 0 18px;\">Yes, and you should if you have one \u2014 a written crate, VCI and desiccant spec removes the biggest variable between quotes. Send it with the drawing and the RFQ through the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/contact\/\" target=\"_blank\" rel=\"noopener\">contact page<\/a>; if you do not have one, ask the supplier to state the four layers in their quote so you can compare like for like.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Can packaging hide defects that inspection should catch?<\/h3>\n<p style=\"margin: 0 0 18px;\">It can delay their discovery, which is worse. Rust found at goods-in six weeks after shipment makes root-cause analysis almost impossible \u2014 you cannot tell whether it came from the foundry, the packing bench, or the container. Photograph parts at packing, keep a retained sample, and inspect on arrival against the same <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-tolerances-guide\/\" target=\"_blank\" rel=\"noopener\">tolerance and condition<\/a> criteria used at source.<\/p>\n\t\t<div data-elementor-type=\"section\" data-elementor-id=\"3550\" class=\"elementor elementor-3550\" data-elementor-post-type=\"elementor_library\">\n\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-19b1acf1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"19b1acf1\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;,&quot;ekit_has_onepagescroll_dot&quot;:&quot;yes&quot;}\">\n\t\t\t\t\t\t\t<div class=\"elementor-background-overlay\"><\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-56e26ed6\" data-id=\"56e26ed6\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-52c3d00c elementor-widget elementor-widget-elementskit-heading\" data-id=\"52c3d00c\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"elementskit-heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"ekit-wid-con\" ><div class=\"ekit-heading elementskit-section-title-wraper text_left   ekit_heading_tablet-   ekit_heading_mobile-\"><h3 class=\"ekit-heading--title elementskit-section-title\">\u00c0 la recherche d'une fonderie de m\u00e9taux fiable en Chine ?<\/h3><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24c75aa0 elementor-widget elementor-widget-text-editor\" data-id=\"24c75aa0\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Nous pouvons vous aider \u00e0 optimiser la conception de vos produits et \u00e0 r\u00e9duire vos co\u00fbts.<\/li><li>Nous pouvons vous aider avec des pi\u00e8ces moul\u00e9es de haute qualit\u00e9 et en grande quantit\u00e9.<\/li><li>Nous pouvons livrer \u00e0 temps et obtenir de nouvelles opportunit\u00e9s de march\u00e9.<\/li><li>Vous b\u00e9n\u00e9ficierez du service de moulage de m\u00e9taux propos\u00e9 par Supro MFG.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-51a20937 elementor-align-left elementor-widget elementor-widget-global elementor-global-1143 elementor-widget-button\" data-id=\"51a20937\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm elementor-animation-grow\" href=\"https:\/\/chinametalfoundry.com\/fr\/contact\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Demander un devis direct usine <\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t\n<p class=\"sc-note\" style=\"font-size: 13px; color: #9a9a9a; margin: 28px 0 0;\">*Data referenced from AFS \/ ASTM \/ IPPC (ISPM-15) publications and Supro MFG shipping records.<\/p>\n<\/article>","protected":false},"excerpt":{"rendered":"<p>A container of castings can survive five weeks at sea and still fail the moment the crate is opened \u2014 [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":7972,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[51],"tags":[47,49,42,43],"class_list":["post-7971","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casting-processes","tag-casting-process","tag-manufacturing-process","tag-metal-casting","tag-sand-casting"],"_links":{"self":[{"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/posts\/7971","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/comments?post=7971"}],"version-history":[{"count":4,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/posts\/7971\/revisions"}],"predecessor-version":[{"id":8029,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/posts\/7971\/revisions\/8029"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/media\/7972"}],"wp:attachment":[{"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/media?parent=7971"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/categories?post=7971"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/tags?post=7971"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}