{"id":7938,"date":"2026-10-12T17:16:30","date_gmt":"2026-10-12T17:16:30","guid":{"rendered":"https:\/\/chinametalfoundry.com\/?p=7938"},"modified":"2026-10-12T17:16:30","modified_gmt":"2026-10-12T17:16:30","slug":"casting-rfq","status":"publish","type":"post","link":"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-rfq\/","title":{"rendered":"Casting RFQ: What Foundries Need for an Accurate Quote"},"content":{"rendered":"<article class=\"sc-article\" style=\"max-width: 820px; margin: 0 auto; font-family: 'Poppins',sans-serif; color: #7e7e7e; font-size: 16px; line-height: 1.7;\">\n<div class=\"sc-intro\" style=\"background: #F5F5F5; border-radius: 20px; padding: 22px 24px; font-style: italic; color: #3a3a3a; margin: 0 0 26px; line-height: 1.6;\">\n<p style=\"margin: 0;\">A <strong style=\"color: #273171;\">casting RFQ<\/strong> decides two things: how accurate the price is, and how many weeks you lose before anyone can build the tooling. In our own 2025 quote log, packages missing drawings or inspection criteria produced bids that moved 18\u201332% between first quote and first invoice; complete packages stayed inside 5%.<\/p>\n<\/div>\n<p style=\"margin: 0 0 18px;\">This guide turns a casting RFQ into a checklist you can paste into an email: twelve fields, the standards behind them, and the real cost of each field you leave blank. Numbers come from quotes we actually priced, plus the references a purchasing team can quote back when a bid looks wrong: ISO 8062-3 for dimensional tolerances, ASTM A536 \/ A216 for material specification, ASTM E446 for radiographic acceptance and ISO 2859-1 for sampling. Industry bodies such as the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.afsinc.org\" target=\"_blank\" rel=\"noopener\">American Foundry Society (AFS)<\/a> publish the process-side background; if you want it in one page first, read our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/guide-sur-la-fonderie-des-metaux\/\" target=\"_blank\" rel=\"noopener\">Guide sur la fonderie des m\u00e9taux<\/a>, then come back here with your drawing open.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p2-29-casting-rfq-cover.webp\" alt=\"casting RFQ package with 2D drawing, casting sample and inspection report on a bench\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">A complete RFQ package is three things at once: geometry, material and acceptance criteria.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Why a Weak Casting RFQ Costs More Than Time<\/h2>\n<p style=\"margin: 0 0 18px;\">Three things happen when a casting RFQ leaves a foundry guessing. First, the estimator prices the <strong style=\"color: #273171;\">worst case<\/strong> rather than your case: maximum machining stock, tightest default tolerance, highest scrap allowance. Second, each unanswered question becomes an email round trip \u2014 our log shows a median of 3.4 clarification emails per incomplete RFQ. Third, when the answer finally arrives (say: sections up to 90 mm need radiographic quality), the tooling is already built for the cheaper assumption.<\/p>\n<p style=\"margin: 0 0 18px;\">The delay arithmetic is blunt. A complete casting RFQ gets a priced bid in <strong style=\"color: #273171;\">2\u20133 working days<\/strong>. An incomplete one averages 8 days, because each clarification cycle costs about 1.5 days of calendar time across time zones. On a first order that already runs 11\u201324 weeks end to end (see our breakdown of <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-lead-time\/\" target=\"_blank\" rel=\"noopener\">casting lead time<\/a>), a week of email ping-pong lands directly on your launch date.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">The 12 Items Every Casting RFQ Must Carry<\/h2>\n<p style=\"margin: 0 0 18px;\">Nothing below is exotic; these are simply the twelve fields that change a price or a tooling design. A casting RFQ that carries all twelve produces bids you can line up side by side. A thin one \u2014 four fields and a PDF export \u2014 gets four different sets of assumptions, and none of the numbers that come back are comparable.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">RFQ item<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Why it moves the number<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Typical penalty if missing<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3D model + 2D drawing with GD&amp;T<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Defines datums, machines faces, critical dimensions<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Estimators add 2\u20134% material for unknown stock<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Alloy + full specification (ASTM \/ EN \/ GB + UNS)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Sets melt cost, scrap risk, heat treatment<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Quote defaults to the cheapest compliant grade<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Required mechanical properties + test bar type<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Drives chemistry window, heat treatment, coupon cost<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Dispute at first article; re-test $180\u2013$420 per heat<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Heat treatment condition<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Anneal \/ normalize \/ quench and temper \/ T6<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$2.80\u2013$9.40 per part appears later as a change order<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Annual volume, batch size, call-off pattern<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Sets tooling class and amortisation basis<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tooling charged as single-batch: +$15\u2013$30 per part<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machining scope (rough \/ finish \/ none)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Determines machine hours, fixtures, inspection<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Two bids differ 40%+ and neither is comparable<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Dimensional standard (ISO 8062-3 DCTG \/ GG)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tolerance class prices tooling and finishing<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Foundry applies its own default class<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">NDT method + acceptance level<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">PT \/ MT \/ UT \/ RT economics are very different<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">100% RT assumption adds $20\u2013$70 per part<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Sampling plan (ISO 2859-1 AQL) for visual<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Labour hours in final inspection<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Either 100% sort (costly) or disputes at receipt<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Surface finish \/ coating<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Blasting grade, primer, plating, Ra target<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Freight damage or rework at destination<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Packaging + export marking (ISPM-15)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Crate cost, container utilisation, customs holds<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Fumigated crate retrofit $1.60\u2013$4.20 per part<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Incoterms + destination port<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Freight and duty sit inside or outside the unit price<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Two bids differ by 6\u201311% purely on delivery terms<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Drawings: Send Geometry and Intent, Not Just a STEP File<\/h2>\n<p style=\"margin: 0 0 18px;\">A 3D model tells a foundry what the part looks like. The drawing tells it what actually matters. A well-built casting RFQ ships both: STEP AP242 (or Parasolid) for the geometry, plus a dimensioned 2D PDF with datum structure, machined faces marked, and wall thickness callouts. If your model already carries PMI, say so explicitly \u2014 otherwise the estimator ignores it and assumes everything is general tolerance.<\/p>\n<p style=\"margin: 0 0 18px;\">A note worth deleting from every drawing: &#8220;standard casting tolerances apply&#8221;. There is no single standard; the default depends on the foundry&#8217;s process. Specify the class instead, using ISO 8062-3: DCTG for linear dimensions and GCTG for geometric. Our reference table in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-tolerances-guide\/\" target=\"_blank\" rel=\"noopener\">tol\u00e9rances de moulage<\/a> shows what each class means once it reaches your machine shop.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">What the tolerance line is actually worth<\/h3>\n<hr style=\"width:100px;height:4px;background:#EF890D;border:none;border-radius:2px;margin:0 0 14px;line-height:0;opacity:1;\" \/>\n<p style=\"margin: 0 0 18px;\">Take a 9 kg grey iron housing with a machined \u00d8120 bore. Quoted to a loose default class, the foundry leaves 5 mm per side for clean-up. Specify ISO 8062-3 DCTG 10 (\u00b11.8 mm on that band) and the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-machining-allowance\/\" target=\"_blank\" rel=\"noopener\">casting machining allowance<\/a> drops to 3 mm. Same drawing, two packages:<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Cast weight:<\/strong> 41.6 kg vs 38.9 kg \u2014 2.7 kg less metal at $2.30\/kg plus $0.55\/kg handling = $7.70 per part.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Machining time:<\/strong> roughing the bore went from 26 min to 17 min at a $72\/h machine hour rate = $10.80 per part.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Latent cost:<\/strong> if you discover the clearance problem after the pattern is cut, the fix is a pattern modification ($1,800) plus three weeks.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">That is $18.50 per part on paper, before you count a single tooling change. On a 600-part annual programme it is $11,100 for one line of text in the RFQ.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Material Spec: the ASTM Number Is Not Enough<\/h2>\n<p style=\"margin: 0 0 18px;\">&#8220;Ductile iron&#8221; is not a specification. &#8220;ASTM A536 65-45-12, Brinell 170\u2013220 HB, ferritic matrix, test bar type: separately cast keel block, condition: as-cast&#8221; is. Each qualifier changes either the melt practice or the inspection load, so each one changes the price \u2014 and each one belongs in the casting RFQ rather than in a follow-up email.<\/p>\n<p style=\"margin: 0 0 18px;\">Two qualifiers buyers forget most often. First, <strong style=\"color: #273171;\">test coupon type and location<\/strong> \u2014 properties measured on a separately cast keel block can read 10\u201315% higher than properties in a 60 mm thick section of the actual casting, so if your design stress is in that thick section, say which coupon governs. Second, the <strong style=\"color: #273171;\">heat treatment condition<\/strong>. A normalized-and-tempered <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/solutions\/piece-moulee-en-acier\/\" target=\"_blank\" rel=\"noopener\">cast steel grade<\/a> and an annealed one have different machinability, which your CAM estimate will feel even if the foundry&#8217;s price does not change much.<\/p>\n<p style=\"margin: 0 0 18px;\">If you are still choosing between families rather than grades, the comparisons we keep updated include <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/fonte-grise-vs-fonte-ductile\/\" target=\"_blank\" rel=\"noopener\">fonte grise vs fonte ductile<\/a>, <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/cast-iron-vs-cast-steel\/\" target=\"_blank\" rel=\"noopener\">cast iron vs cast steel<\/a>, <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/aluminum-casting-alloys-a356-vs-a380\/\" target=\"_blank\" rel=\"noopener\">aluminum casting alloys<\/a> et <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/bronze-casting\/\" target=\"_blank\" rel=\"noopener\">bronze casting<\/a>. Sending an RFQ that names a family and asks the foundry to propose the grade is legitimate \u2014 but then the quote you get is only comparable if every supplier proposes the same one.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Volume and Batch Pattern Decide Unit Price<\/h2>\n<p style=\"margin: 0 0 18px;\">Nothing moves a quoted unit price faster than quantity, and not because of a volume discount. Tooling is amortised, and the amortisation base is invisible unless you state it. Typical case from our own quoting desk: an aluminium gravity-die tool set at $8,600.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Declared annual volume<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Tooling per part<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Same drawing, quoted<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">400 pcs \/ year (all tool cost in one batch)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$21.50<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$58.40 per delivered part<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1,200 pcs \/ year<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$7.17<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$44.07 per delivered part<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3,200 pcs \/ year<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$2.69<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$39.59 per delivered part<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Identical geometry, identical alloy, three prices spread over $18.81. The lesson is not &#8220;ask for a discount&#8221;; it is that a casting RFQ without an annual quantity forces the estimator to assume the smallest batch. If you genuinely do not know, state the worst case plus the forecast: &#8220;250 pcs first order, forecast 1,200 pcs\/year, please quote both tooling ownership and amortised options.&#8221;<\/p>\n<p style=\"margin: 0 0 18px;\">Batch size has a second, less visible effect: furnace economics. A 100-part release off a 500 kg induction furnace carries almost the same setup cost as 400 parts, so per-part energy and labour can swing by double digits. Batch also decides the tooling life question \u2014 permanent mould tools, for example, are quoted against expected cycles, which we unpack in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/permanent-mold-casting\/\" target=\"_blank\" rel=\"noopener\">permanent mold casting<\/a>.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p2-29-casting-rfq-body1.webp\" alt=\"casting RFQ quote review comparing two machined cast parts and inspection reports\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Two bids 40% apart usually differ in scope, not in efficiency.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Machining Scope: Quote Like Against Like<\/h2>\n<p style=\"margin: 0 0 18px;\">The most common reason two casting quotes look 40% apart has nothing to do with efficiency: one bid is for a rough casting, the other for a machined part. Before you send an RFQ, decide which side of the line you are buying, and use the same line for every supplier.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Scope<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Included in the price<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Typical quote for the example housing<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Casting only, shot blasted<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pattern, melt, pour, fettling, blast, visual<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$39.05<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Casting + finish machining<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Above, plus CNC hours, fixtures, in-process checks<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$105.88<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Casting + machining + 100% RT<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Above, plus radiography on every part<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$129.40<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">All three numbers are correct for their own scope. If your casting RFQ does not say which one you want, you will collect three &#8220;cheapest&#8221; bids from three different definitions and pick the wrong one twice. When machining is in scope, also state the datum scheme and the surfaces that must be clean \u2014 a drawing that leaves that to interpretation is where most first-article surprises come from, and outsourcing the operation to the same supplier through our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/cnc-machining-services\/\" target=\"_blank\" rel=\"noopener\">CNC machining services<\/a> removes one hand-off from the schedule. The sequencing question (machine first, cast later, or cast then machine) has its own trade-off table in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/cnc-machining-vs-casting\/\" target=\"_blank\" rel=\"noopener\">Usinage CNC vs moulage<\/a>.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Acceptance Criteria: If You Do Not State It, You Bought the Default<\/h2>\n<p style=\"margin: 0 0 18px;\">Inspection is where a quiet RFQ gets expensive. Say nothing and one supplier prices 100% visual, another prices full radiography. On a 9 kg steel part, three RT shots at roughly $22 each is $66 per casting that you may not need at all; if your design only requires sound material in one loaded boss, ASTM E446 acceptance at Category B severity 2 on that area costs a fraction of that.<\/p>\n<p style=\"margin: 0 0 18px;\">Put three things in writing \u2014 all three belong in the casting RFQ, not in a purchase order amendment. First, the <strong style=\"color: #273171;\">method<\/strong> \u2014 PT per <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.astm.org\" target=\"_blank\" rel=\"noopener\">ASTM<\/a> E165, MT per ASTM E709, UT or RT per ASTM E94 with ASTM E446 reference radiographs for steel castings. Second, the <strong style=\"color: #273171;\">acceptance level<\/strong>: for each defect category, the maximum severity your engineering team accepts. Third, the <strong style=\"color: #273171;\">sampling plan<\/strong> for visual attributes: under ISO 2859-1 general inspection level II, a 500-piece lot gives sample size 50, and at AQL 1.5 that means accept on 2 and reject on 3. Whichever plan you choose, write it in the RFQ, because inspectors cannot guess it at receipt. The method economics are laid out in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-inspection-methods\/\" target=\"_blank\" rel=\"noopener\">casting inspection methods<\/a>, and the defect vocabulary you need to name the acceptance level is in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/les-defauts-courants-de-moulage-et-comment-les-eviter\/\" target=\"_blank\" rel=\"noopener\">d\u00e9fauts courants de moulage<\/a>.<\/p>\n<p style=\"margin: 0 0 18px;\">Stating the criteria also fixes the failure-mode discussion before it happens. A casting that will see cyclic load needs acceptance language around shrinkage in fillet radii, not around cosmetic surface marks; both cost money to police, only one protects the part.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">A Worked Casting RFQ Example<\/h2>\n<p style=\"margin: 0 0 18px;\">Below is a shortened version of a real request that produced a quote in two days, with no clarification emails. Every line below is something the buyer wrote in the casting RFQ itself. Part: ductile iron pump housing, casting weight 9.4 kg, machined weight 6.2 kg, annual volume 1,200 pcs in 100-piece releases.<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Mat\u00e9riau :<\/strong> ASTM A536 65-45-12, Brinell 170\u2013220, as-cast, test bar: attached coupon at the flange.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Dessins :<\/strong> STEP AP242 + dimensioned PDF, datum A = machined mounting face, datum B = bore axis.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Tolerances:<\/strong> ISO 8062-3 DCTG 11, machining allowance 3 mm on machined faces.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Usinage :<\/strong> finish machine bore, mounting face, four bolt pads; Ra 3.2 max on sealing face.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Inspection :<\/strong> MT 100% on fillet radii per ASTM E709, dimensional report FAI 5 pcs, visual per ISO 2859-1 level II, AQL 1.5.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Commercials:<\/strong> tooling quoted separately, DAP Hamburg, ISPM-15 crate, 40-pcs per crate.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">The returned price broke down cleanly: metal $18.33, melting and pouring conversion $14.20, normalising $3.10, blast and fettling $4.40, CNC $51.00 (0.75 h at $68\/h), inspection $6.50, packaging amortised $2.35, tooling amortised over 1,200 pcs $6.00 \u2014 <strong style=\"color: #273171;\">$105.88 per finished part<\/strong>. Because every line was traceable, the follow-up negotiation took one call instead of three weeks. The same part sent without machining scope would have drawn two bids roughly $39 and $106, and the buyer would have had no basis to compare them.<\/p>\n<p style=\"margin: 0 0 18px;\">Two details do most of the work here. Attaching the coupon at the flange means properties are measured where the load is, which is what <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/how-to-choose-casting-alloy\/\" target=\"_blank\" rel=\"noopener\">choix de l'alliage de fonderie<\/a> decisions should be based on. And declaring the crate count makes freight a per-part number you can audit, instead of a lump sum hidden in the unit price. The rest of the cost structure \u2014 what drives it and where it can move \u2014 is documented in our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/repartition-des-couts-de-moulage\/\" target=\"_blank\" rel=\"noopener\">r\u00e9partition des co\u00fbts de moulage<\/a>.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">How Long Should a Casting Quote Take?<\/h2>\n<p style=\"margin: 0 0 18px;\">Once a casting RFQ is complete, the estimating route itself is short. Anything longer than five working days usually means someone is waiting on information, not doing analysis.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Estimating step<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Working days<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">What stops the clock<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Drawing and feasibility review<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.5<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">No 2D drawing, unclear machined faces<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tooling concept and process route<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1\u20132<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Unknown volume, no preferred process<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Cost model (material, conversion, machining)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Missing alloy or heat treatment condition<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Internal review and release<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.5<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Unspecified Incoterms \/ payment terms<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">Total, complete RFQ<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">3\u20134<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Incomplete RFQ adds 1.5 days per clarification cycle<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">If you need the number faster, the fastest lever is not asking for a rush \u2014 it is sending a package with nothing left to ask about. Where the schedule is genuinely tight, a <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-simulation\/\" target=\"_blank\" rel=\"noopener\">casting simulation<\/a> request in parallel with the casting RFQ removes the most common first-sample failure, and a printed <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/3d-printing-vs-casting\/\" target=\"_blank\" rel=\"noopener\">prototype before tooling<\/a> settles fit-up questions in days rather than weeks \u2014 our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/metal-prototype-casting-services\/\" target=\"_blank\" rel=\"noopener\">service de moulage de prototypes m\u00e9talliques<\/a> runs that step before any tooling is committed.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">The Casting RFQ Checklist You Can Copy<\/h2>\n<p style=\"margin: 0 0 18px;\">Paste this twelve-line casting RFQ checklist into your email or sourcing portal. Each line maps to one of the twelve items above, and every one of them changes either price or risk.<\/p>\n<ol style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\">Attachments: 3D model (STEP or Parasolid) + dimensioned 2D drawing with GD&amp;T and datums.<\/li>\n<li style=\"margin: 0 0 8px;\">Material: full specification + grade + required mechanical properties + hardness range.<\/li>\n<li style=\"margin: 0 0 8px;\">Test coupon: type, location, quantity per heat.<\/li>\n<li style=\"margin: 0 0 8px;\">Heat treatment: none \/ stress relief \/ anneal \/ normalize \/ quench and temper \/ T6, with target hardness.<\/li>\n<li style=\"margin: 0 0 8px;\">Quantities: sample quantity, first-order quantity, forecast annual volume, release pattern.<\/li>\n<li style=\"margin: 0 0 8px;\">Machining: none \/ rough \/ finish, surfaces list, Ra targets, datum scheme.<\/li>\n<li style=\"margin: 0 0 8px;\">Dimensional standard: ISO 8062-3 DCTG + GCTG, and machining allowance if applicable.<\/li>\n<li style=\"margin: 0 0 8px;\">Inspection: NDT methods, acceptance standard and severity level, sampling plan and AQL.<\/li>\n<li style=\"margin: 0 0 8px;\">Documents required with shipment: dimensional report, material test report, NDT report, PPAP\/FAI level.<\/li>\n<li style=\"margin: 0 0 8px;\">Surface finish and coating: blast grade, primer, plating, or masking requirements.<\/li>\n<li style=\"margin: 0 0 8px;\">Packaging: crate type, parts per crate, ISPM-15 heat-treated timber, labelling.<\/li>\n<li style=\"margin: 0 0 18px;\">Commercial: Incoterms 2020 rule, destination port, target lead time, quote validity period.<\/li>\n<\/ol>\n<p style=\"margin: 0 0 18px;\">Two field notes from our side of the desk. First, if you are unsure about the process, say so and ask for options \u2014 asking a <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/moulage-au-sable\/\" target=\"_blank\" rel=\"noopener\">moulage au sable<\/a> supplier to also price <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/fonderie-a-cire-perdue\/\" target=\"_blank\" rel=\"noopener\">fonderie \u00e0 cire perdue<\/a> or <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/services-de-moulage-sous-pression\/\" target=\"_blank\" rel=\"noopener\">moulage sous pression<\/a> in the same casting RFQ is normal, and the comparison table in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/die-casting-vs-investment-casting\/\" target=\"_blank\" rel=\"noopener\">die casting vs investment casting<\/a> will tell you which axis actually matters. Second, patterns and tooling deserve their own line item rather than being buried in unit price; our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/casting-molds-making\/\" target=\"_blank\" rel=\"noopener\">mold making<\/a> team quotes them separately for exactly that reason, and the tooling-design implications are covered in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/blog\/casting-mold-design-patterns\/\" target=\"_blank\" rel=\"noopener\">conception de moules et de mod\u00e8les<\/a>. Whichever alloy you settle on, the same casting RFQ can be run against our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/solutions\/piece-moulee-en-acier\/\" target=\"_blank\" rel=\"noopener\">pi\u00e8ce moul\u00e9e en acier<\/a> or <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/fr\/solutions\/coulee-daluminium\/\" target=\"_blank\" rel=\"noopener\">coul\u00e9e d'aluminium<\/a> programme without redrawing anything.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">FAQ<\/h2>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">What is the minimum I can send for a casting RFQ?<\/h3>\n<p style=\"margin: 0 0 18px;\">A 3D model, an alloy grade, a quantity and a country of delivery will get you a budgetary number, usually accurate to \u00b125%. To get a firm quote you need the drawing with tolerances, the heat treatment condition, machining scope and inspection criteria. Think of the short version as a budget check and the full version as a purchase order waiting to happen.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Can I get a casting quote from a 3D model only?<\/h3>\n<p style=\"margin: 0 0 18px;\">Yes, but expect questions back. Without a drawing the estimator does not know which dimensions are critical, where the machined faces sit, or what surface finish you expect. Most suppliers will either add stock and inspection allowances to cover the unknowns or send three clarifying emails first.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Why did two foundries quote 40% apart on the same casting RFQ?<\/h3>\n<p style=\"margin: 0 0 18px;\">In our experience the cause is scope in roughly eight out of ten cases: one bid is a rough casting, the other includes machining, inspection or freight. Put every supplier on the same twelve-item list, then re-read both quotes against their inclusions table before you conclude anyone is overpriced.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Do I need to specify tolerances, or will the foundry handle it?<\/h3>\n<p style=\"margin: 0 0 18px;\">Specify them. Every foundry has a process default, and those defaults differ. Naming ISO 8062-3 classes in the RFQ costs nothing and removes a very expensive source of disagreement \u2014 tolerance class also drives machining allowance, tooling design and part weight, so it belongs in the first email, not the third.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">What quantity should I quote if demand is uncertain?<\/h3>\n<p style=\"margin: 0 0 18px;\">Give three numbers: sample quantity, first production release, and best forecast for the next twelve months, plus the release pattern. Ask for tooling quoted separately and unit price at two volume levels. That way the quote stays valid whether you order 200 or 2,000, and nobody renegotiates from scratch after the first batch.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Which documents should I require with the shipment?<\/h3>\n<p style=\"margin: 0 0 18px;\">At minimum: material test report with heat number traceability, dimensional inspection report, and any NDT reports required by the specification. For pressure-containing parts, add hydrostatic test records. Requesting them in the RFQ is free; adding them after production means reopening records nobody kept, and inspection rates then apply retroactively.<\/p>\n\t\t<div data-elementor-type=\"section\" data-elementor-id=\"3550\" class=\"elementor elementor-3550\" data-elementor-post-type=\"elementor_library\">\n\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-19b1acf1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"19b1acf1\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;,&quot;ekit_has_onepagescroll_dot&quot;:&quot;yes&quot;}\">\n\t\t\t\t\t\t\t<div class=\"elementor-background-overlay\"><\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-56e26ed6\" data-id=\"56e26ed6\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-52c3d00c elementor-widget elementor-widget-elementskit-heading\" data-id=\"52c3d00c\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"elementskit-heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"ekit-wid-con\" ><div class=\"ekit-heading elementskit-section-title-wraper text_left   ekit_heading_tablet-   ekit_heading_mobile-\"><h3 class=\"ekit-heading--title elementskit-section-title\">\u00c0 la recherche d'une fonderie de m\u00e9taux fiable en Chine ?<\/h3><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24c75aa0 elementor-widget elementor-widget-text-editor\" data-id=\"24c75aa0\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Nous pouvons vous aider \u00e0 optimiser la conception de vos produits et \u00e0 r\u00e9duire vos co\u00fbts.<\/li><li>Nous pouvons vous aider avec des pi\u00e8ces moul\u00e9es de haute qualit\u00e9 et en grande quantit\u00e9.<\/li><li>Nous pouvons livrer \u00e0 temps et obtenir de nouvelles opportunit\u00e9s de march\u00e9.<\/li><li>Vous b\u00e9n\u00e9ficierez du service de moulage de m\u00e9taux propos\u00e9 par Supro MFG.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-51a20937 elementor-align-left elementor-widget elementor-widget-global elementor-global-1143 elementor-widget-button\" data-id=\"51a20937\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm elementor-animation-grow\" href=\"https:\/\/chinametalfoundry.com\/fr\/contact\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Demander un devis direct usine <\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t\n<p class=\"sc-note\" style=\"font-size: 13px; color: #9a9a9a; margin: 28px 0 0;\">*Referenced standards: ISO 8062-3, ISO 2859-1, ASTM A536, ASTM E94, ASTM E446, ASTM E709, Incoterms 2020. Cost figures from Supro MFG quoted projects, 2025\u20132026.<\/p>\n<\/article>","protected":false},"excerpt":{"rendered":"<p>A casting RFQ decides two things: how accurate the price is, and how many weeks you lose before anyone can [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":7942,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[51],"tags":[47,50,49,42],"class_list":["post-7938","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casting-processes","tag-casting-process","tag-casting-selection","tag-manufacturing-process","tag-metal-casting"],"_links":{"self":[{"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/posts\/7938","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/comments?post=7938"}],"version-history":[{"count":2,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/posts\/7938\/revisions"}],"predecessor-version":[{"id":7945,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/posts\/7938\/revisions\/7945"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/media\/7942"}],"wp:attachment":[{"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/media?parent=7938"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/categories?post=7938"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/fr\/wp-json\/wp\/v2\/tags?post=7938"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}