{"id":8259,"date":"2026-11-07T01:30:59","date_gmt":"2026-11-07T01:30:59","guid":{"rendered":"https:\/\/chinametalfoundry.com\/?p=8259"},"modified":"2026-11-09T08:10:06","modified_gmt":"2026-11-09T08:10:06","slug":"casting-scrap-rate","status":"publish","type":"post","link":"https:\/\/chinametalfoundry.com\/es\/blog\/casting-scrap-rate\/","title":{"rendered":"Casting Scrap Rate: How to Measure, Cost and Cut It"},"content":{"rendered":"<article class=\"sc-article\" style=\"max-width: 820px; margin: 0 auto; font-family: 'Poppins',sans-serif; color: #7e7e7e; font-size: 16px; line-height: 1.7;\">\n<div class=\"sc-intro\" style=\"background: #F5F5F5; border-radius: 20px; padding: 22px 24px; font-style: italic; color: #3a3a3a; margin: 0 0 26px; line-height: 1.6;\">\n<p style=\"margin: 0;\">A casting scrap rate of 10.6% is not a quality statistic sitting in a spreadsheet. On a machined 21.5 kg valve body it is <strong style=\"color: #273171;\">$3.72 of cost per good piece<\/strong>, 5.5% more furnace hours than the schedule assumes, and roughly one month in ten where the shipment arrives short. Most buyers never see the number until it appears as a late container.<\/p>\n<\/div>\n<p style=\"margin: 0 0 18px;\">This guide treats the casting scrap rate as a cost structure rather than a report card: which denominator to use, where the loss actually accrues across three process stages, how to turn the percentage into dollars per good part, and which five shop-floor levers move it without capital equipment. Alloy classifications referenced below follow <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.astm.org\/standards\/a536\" target=\"_blank\" rel=\"noopener\">ASTM A536<\/a> for ductile iron and <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.nadca.com\/\" target=\"_blank\" rel=\"noopener\">NADCA<\/a> process guidance; the arithmetic is standard yield accounting, not a benchmark borrowed from a brochure. For the process decisions sitting upstream of every yield loss, the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/guia-de-fundicion-de-metales\/\" target=\"_blank\" rel=\"noopener\">Gu\u00eda de fundici\u00f3n de metales<\/a> covers them in sequence.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/11\/p257-scrap-cover-1.webp\" alt=\"casting scrap rate review of machined valve bodies sorted into accepted and rejected bins on a foundry inspection bench\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Fig 1. Scrap is not one event. The bin a casting lands in decides how much of the process cost leaves with it.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">What a Casting Scrap Rate Really Measures<\/h2>\n<p style=\"margin: 0 0 18px;\">A casting scrap rate is the share of pieces that enter a process step and never reach the customer in saleable condition, counted over a defined period. Everything that makes the number useful or useless sits in two words: <em>enter<\/em> y <em>saleable<\/em>. Move either boundary and the same shop reports 4% or 14% in the same week without anyone lying.<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Pieces poured as the base.<\/strong> Count every cavity filled, including molds that produced only risers. This is the only denominator that charges the shop for metal it melted and never converted.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Pieces after shakeout as the base.<\/strong> Castings that never filled, or that broke during knockout, quietly leave the sample. A foundry using this base typically reports two to four points lower than one using poured pieces.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Shipped pieces as the base.<\/strong> Rework disappears into the good count. A part that went through weld repair, impregnation and a second machining pass shows up as 100% yield and 180% cost.<\/li>\n<\/ul>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">First Pass Yield Is the Number That Pays<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">First pass yield (FPY) counts only pieces that cleared every gate the first time. It is always the lower number and always the honest one. Take 1,000 castings where 60 are reworked and 40 are scrapped: final yield reads 96%, first pass yield reads 90%. The 60 reworked pieces still consumed a second setup, a second inspection and a welder, and those hours are in the price the buyer pays whether or not they appear in the yield figure.<\/p>\n<p style=\"margin: 0 0 18px;\">When a supplier quotes a scrap rate, ask which one they mean. A 3% final loss with a 22% rework rate is a harder job to schedule than a flat 9% first pass scrap with no rework loop, because the rework path is invisible to capacity planning and builds its own queue.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">How to Calculate a Casting Scrap Rate You Can Defend<\/h2>\n<p style=\"margin: 0 0 18px;\">The formula is trivial; the boundary conditions are not. Before comparing two suppliers, two months or two part numbers, fix four parameters in writing: the denominator, the counting point, whether rework returns to the numerator, and whether machining losses are included. The table shows what each common denominator hides.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Denominator used<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">What it counts<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">What it hides<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pieces poured (molds x cavities)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Every cavity filled, risers included<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Nothing at this stage; the most conservative base<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pieces after shakeout<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Castings that survived knockout<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Misfills, cold shuts, broken molds<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pieces charged to the job<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Castings plus the rework loop<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">How many touches each piece needed<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pieces shipped<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Only saleable output<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Repair, re-inspection, schedule slip<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machined pieces only<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Post-machining yield<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Casting-stage loss, the largest share<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">The Staged Calculation<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">Scrap does not cost the same at every stage. A casting scrapped at shakeout loses melt and mold cost only; the same casting scrapped after machining loses machining hours, tooling and inspection on top. The correct expression is a weighted sum, not a single percentage:<\/p>\n<p style=\"margin: 0 0 18px;\"><strong style=\"color: #273171;\">Scrap cost per good piece = sum over stages of (pieces entering x scrap fraction x cost accumulated to that stage) \/ good pieces<\/strong><\/p>\n<p style=\"margin: 0 0 18px;\">Run it on a 21.5 kg gray iron valve body at 10,000 pours a month, across three gates: pouring at 96.0%, cleaning and first inspection at 97.5%, first-pass machining at 95.5%. Multiply the three and the real first pass yield is 89.39%, a scrap rate of 10.61% &#8211; which is 106,100 PPM, roughly two hundred times the target an automotive buyer expects on a purchased part.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Stage<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Entered<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Passed<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Scrapped<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Cost accumulated<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Scrap cost<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Melt and pour<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">10,000<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">9,600<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">400<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$17.40<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$6,960<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Cleaning and inspection<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">9,600<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">9,360<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">240<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$22.70<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$5,448<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machining, first pass<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">9,360<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">8,939<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">421<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$49.50<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$20,840<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">Total<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">10,000<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">8,939<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1,061<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">&#8211;<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">$33,257<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Divide $33,257 by 8,939 good pieces and the scrap bill is <strong style=\"color: #273171;\">$3.72 per good piece<\/strong> on a $51.60 variable cost, a 7.2% uplift. The component build-up behind that $51.60 is the same one used in any <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-cost-breakdown\/\" target=\"_blank\" rel=\"noopener\">casting cost breakdown<\/a>: metal, mold, finishing, machining, inspection, with scrap applied on top rather than inside each line. The naive shortcut &#8211; total cost divided by first pass yield &#8211; gives $57.73 and overstates the damage by $2.41, because it charges machining hours to pieces that were scrapped before they ever reached a machine. That shortcut is fine for a rough capacity estimate. It is wrong in a price negotiation.<\/p>\n<p style=\"margin: 0 0 18px;\">One more number keeps the comparison honest: the confidence interval around the estimate. A 400-piece lot with 42 scrapped gives a point estimate of 10.5%, but the 95% interval runs from roughly 7.9% to 13.9% &#8211; wide enough that ranking two suppliers on a single lot is guesswork. When the question is &#8220;is this lot under the cap?&#8221; rather than &#8220;what is the average?&#8221;, <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.astm.org\/standards\/e2334\" target=\"_blank\" rel=\"noopener\">ASTM E2334<\/a> formalises the upper confidence bound, and it is the honest way to write a lot-acceptance rule into a casting scrap rate clause.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">The Cost Curve Hidden Inside a Casting Scrap Rate<\/h2>\n<p style=\"margin: 0 0 18px;\">Scrap percentage and scrap cost are not proportional. Because every scrapped piece carries the full cost of all upstream steps, the multiplier on cost per good part is <strong style=\"color: #273171;\">1 \/ (1 &#8211; scrap rate)<\/strong>, and it steepens as the rate climbs. A shop moving from 4% to 8% loses more money per point than one moving from 2% to 5%, even though the second shop added three points and the first added four.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Scrap rate<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Cost multiplier per good piece<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Extra cost on a $51.60 base<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.020<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+$1.05<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">5%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.053<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+$2.71<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">8%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.087<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+$4.49<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">10.6%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.119<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+$6.12<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">15%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.176<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+$9.11<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">20%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.250<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">+$12.90<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">The table uses the uniform-cost shortcut, so read it as a ranking tool rather than an invoice. The real bill depends on where the loss lands, which is what the staged calculation resolves. The commercial lesson holds either way: the last two points are the expensive ones, which is why the cheapest scrap reduction usually comes from the top two part numbers instead of a shop-wide campaign.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/11\/p257-scrap-inspect-2.webp\" alt=\"casting scrap rate by process stage with an inspector measuring a machined casting at a dimensional check station\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Fig 2. Late-stage scrap is the expensive kind: by the machining gate the part already carries melt, mold and finishing cost.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Where a Casting Scrap Rate Comes From: Six Signatures<\/h2>\n<p style=\"margin: 0 0 18px;\">A scrap rate without a Pareto is just a mood. The six sources below account for most of the loss in a sand foundry, and each leaves a signature that says which gate it belongs to. Shares are shop-floor experience across ductile and gray iron work, not a standard &#8211; sort your own data before budgeting against them. The defect names in the signature column map onto the pattern catalog in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/defectos-comunes-en-la-fundicion-y-como-evitarlos\/\" target=\"_blank\" rel=\"noopener\">defectos comunes en la fundici\u00f3n<\/a>, and the detection method decides which one you can actually see: <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/metodos-de-inspeccion-de-piezas-fundidas\/\" target=\"_blank\" rel=\"noopener\">m\u00e9todos de inspecci\u00f3n de piezas fundidas<\/a> compares what each gate catches.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Source<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Typical share<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Signature<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Found at<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Gating and riser design, shrinkage<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">30-40%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Porosity at a hot spot, sink on a heavy section<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">X-ray, UT, sectioning<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Sand system (blows, scabs, penetration)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">15-25%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Clustered on one mold position, worse after a sand change<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Visual, after shot blast<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Metal chemistry and pour temperature<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">10-20%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Cold shuts, misruns, carbides, varying by heat<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Spectrometer log, thermocouple<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Core defects (shift, gas, breakage)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">8-15%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Internal void with a smooth wall, wall thickness off on one side<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Sectioning, gauging<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pattern and tooling wear<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">5-12%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Slow dimensional drift, flash growth over months<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">SPC on a locating feature<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machining-induced loss<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">5-15%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Chatter, hard spots, allowance consumed on one face<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">CMM, tool life records<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">The Half That Happens After the Casting Is Good<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">In most shops a fifth to a third of what gets reported as scrap is machining scrap wearing a casting label. A casting 0.4 mm out of position on a machined pad is a good casting with a bad process plan: fixing it with a pattern change costs five figures, fixing it with a fixture adjustment costs an afternoon. Split the scrap at the machining gate before you accept the number. The split tells you whether you are buying a foundry problem or a manufacturing-engineering problem, and those come with very different price tags. If the loss survives that test, the allowance was wrong rather than the casting &#8211; the arithmetic for that sits in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-machining-allowance\/\" target=\"_blank\" rel=\"noopener\">casting machining allowance<\/a> &#8211; and the fix belongs in the machining cell reviewed under <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/cnc-machining-services\/\" target=\"_blank\" rel=\"noopener\">CNC machining services<\/a>, not on the pattern.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Cutting a Casting Scrap Rate Without Buying a New Line<\/h2>\n<p style=\"margin: 0 0 18px;\">The five levers below were sized against the 10.61% baseline casting scrap rate established above, on a shop running 10,000 pours a month. Expected reduction is the measured effect at that shop, not a vendor claim; the arithmetic total overstates the result because two levers attack the same porosity population, so plan for roughly 80% of it.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Lever<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Expected reduction<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">One-time cost<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Payback<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pour temperature window held to +\/-15 C with CE and inoculation control<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2.0 pp<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$400<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Immediate<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Sand system control: muller cycle, compactability 32-38%, moisture logging<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.3 pp<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$8,600<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.6 month<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Gating and riser redesign on the top two part numbers<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.4 pp<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$12,800<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.9 month<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">SPC plus gauge R&amp;R on three critical dimensions<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.6 pp<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$6,200<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.4 month<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Machining fixture and allowance review<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.7 pp<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$4,900<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">0.3 month<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">Program total<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">6.0 pp, plan 4.9 pp<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">$32,900<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">2.1 months<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Cutting the casting scrap rate by 4.9 points takes first pass yield from 89.39% to 94.30%: 9,430 good pieces from the same 10,000 pours, scrap cost down from $33,257 to $19,254, or $3.72 to $2.04 per good piece. At 9,430 pieces a month that is <strong style=\"color: #273171;\">$15,833 a month<\/strong> &#8211; about $190,000 a year &#8211; against $32,900 of one-time spend. Few capital projects on a foundry floor pay back in nine weeks.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">Why 100% Inspection Does Not Cut Scrap<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">Sorting every piece is the most common first response to a bad casting scrap rate, and the least effective. Inspecting 9,000 machined castings at 1.6 minutes each is 240 labour hours a month, about $6,720 at $28 an hour, and nothing changes upstream: the same 1,061 pieces are still poured and still lost. Worse, a visual gate on internal porosity detects well under half of what passes through it, so the exercise converts an internal scrap cost into an external one. Inspection buys information; process control buys pieces back.<\/p>\n<p style=\"margin: 0 0 18px;\">The right use of 100% inspection is short and diagnostic: run it for one or two lots to find where escapes originate, then move the resource upstream and hold sampling at the level your <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-incoming-inspection-plan\/\" target=\"_blank\" rel=\"noopener\">incoming inspection plan<\/a> specifies.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">A 30-Day Start on Two Part Numbers<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">Programs die when they start shop-wide. Pick the two part numbers contributing the most scrap dollars &#8211; not the highest percentage, the highest dollars &#8211; and run four weeks of disciplined work on them. Four weeks is usually enough to prove whether a casting scrap rate is a tooling problem or a process-window problem, and the answer decides where the next $12,000 goes.<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\">Week 1: tag and weigh every scrapped piece, by cavity position, for five consecutive shifts. Position clustering is the fastest signal you will get.<\/li>\n<li style=\"margin: 0 0 8px;\">Week 2: pull the pour log for the heats behind those pieces &#8211; temperature at the furnace, temperature at the mold, CE and inoculation method. One lever, measured.<\/li>\n<li style=\"margin: 0 0 8px;\">Week 3: section two scrapped parts and one good part. The comparison locates the porosity population and tells you whether gating or a core is responsible.<\/li>\n<li style=\"margin: 0 0 8px;\">Week 4: change one variable at a time, 300 pieces per cell, and re-measure. Two variables at once and you learn nothing.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">Where the answer lands in the workshop depends on the process. Gating and riser changes belong with the pattern and the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/casting-molds-making\/\" target=\"_blank\" rel=\"noopener\">casting mold making<\/a> team; solidification checks are cheaper than pattern cuts and are covered in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/simulacion-de-fundicion\/\" target=\"_blank\" rel=\"noopener\">simulaci\u00f3n de fundici\u00f3n<\/a>; iron work with a sand-system problem is process-specific enough that the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/fundicion-en-arena\/\" target=\"_blank\" rel=\"noopener\">sand casting process<\/a> and the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/soluciones\/fundicion-de-hierro\/\" target=\"_blank\" rel=\"noopener\">iron casting line<\/a> should be tuned together; and a high-volume aluminium part with a 10% scrap rate is usually a tooling-cooling question that belongs in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/servicios-de-fundicion-a-presion\/\" target=\"_blank\" rel=\"noopener\">fundici\u00f3n a presi\u00f3n<\/a> rather than sand work at all.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">What to Put in the PO When a Casting Scrap Rate Matters<\/h2>\n<p style=\"margin: 0 0 18px;\">Scrap rate is a supplier-internal metric until it affects delivery, and then it becomes a contract term. Six fields make it enforceable without turning a purchase order into an audit protocol:<\/p>\n<ol style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Definition and denominator.<\/strong> &#8220;Scrap rate means pieces scrapped divided by pieces poured, measured at each of the three gates named in the inspection plan and reported monthly.&#8221; Without the denominator the clause is unenforceable.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Target and cap.<\/strong> A 6% target with a 9% cap is workable; a single number is not. The cap triggers a written corrective action, the target drives improvement.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Notification trigger.<\/strong> Any lot above the cap gets written notice within 48 hours with the affected heat numbers. This is the clause that prevents a short shipment discovered at the port.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Rework disclosure.<\/strong> Reworked pieces must be declared and counted in first pass yield, not final yield. Undeclared rework is the commonest way a quality report stays green while the process drifts.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Capacity commitment.<\/strong> State the good-piece quantity, not the pour quantity, so the supplier carries the yield risk they control.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Cost sharing on repeat causes.<\/strong> If the same root cause appears in three consecutive lots, tooling or process correction sits with the supplier; the buyer pays only for design changes they requested.<\/li>\n<\/ol>\n<p style=\"margin: 0 0 18px;\">Two buyer-side numbers make the case internally. Variability first: a supplier averaging 8% scrap with a 3.2 point standard deviation lands above 12% in roughly one month in ten, and covering that at a 95% service level costs about $5,395 a year in carrying cost on a 9,000-piece monthly order, against $1,854 for a supplier holding 1.1 points of deviation &#8211; <strong style=\"color: #273171;\">$3,540 a year<\/strong> that never appears on a quotation. Capacity second: shipping 9,000 good pieces needs 10,069 pours at 10.61% scrap versus 9,544 at 5.70%, so 5.5% of the furnace, molding and machining hours you already pay for is producing scrap.<\/p>\n<p style=\"margin: 0 0 18px;\">Those figures are also the right way to open the conversation. Asking for a casting scrap rate by stage rather than as a single percentage signals that you know where the number comes from, and it usually gets a more useful answer than a request for a certificate. Pair it with the acceptance criteria in your <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-quality-agreement\/\" target=\"_blank\" rel=\"noopener\">quality agreement<\/a> and the escalation path in your <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-defect-claim\/\" target=\"_blank\" rel=\"noopener\">defect claim procedure<\/a>, and the metric stops being a monthly argument.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/11\/p257-scrap-mold-3.webp\" alt=\"casting scrap rate root cause analysis of a gating system and riser layout on a sand mold half\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Fig 3. Most of the loss is designed in before the first pour: gating and riser layout decide where shrinkage porosity lands.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Preguntas frecuentes<\/h2>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">What is a good casting scrap rate?<\/h3>\n<p style=\"margin: 0 0 18px;\">It depends on the process and the alloy, so treat any single figure with suspicion. Across sand casting shops, 3-8% first pass scrap is a well-run process and 8-15% is common; above 15% usually points to a design or sand system problem rather than operator error. Die casting runs lower on dimensional scrap and higher on porosity scrap, and investment casting sits between the two. Compare a supplier against their own history and against a part of similar geometry, not against a headline number.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Is a 0% scrap rate realistic?<\/h3>\n<p style=\"margin: 0 0 18px;\">No, and a supplier claiming one has either moved the denominator or is not counting rework. New tooling, first articles and alloy changes all carry higher early loss; a mature part on stable tooling can hold 2-3% in die casting and 4-6% in sand casting. What matters commercially is the trend and the variability, not the absolute figure.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">How is a casting scrap rate different from first pass yield?<\/h3>\n<p style=\"margin: 0 0 18px;\">They are complements. First pass yield counts pieces that cleared every gate the first time; scrap rate counts the rest. The gap between first pass and final yield is rework, and that gap is where cost hides &#8211; a shop reporting 96% final yield and 90% first pass yield is carrying a 6% rework loop that never appears in the headline number.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Does a supplier scrap rate change the price I pay?<\/h3>\n<p style=\"margin: 0 0 18px;\">It is already in the price, itemised or not. Scrap raises cost per good piece by 1\/(1 &#8211; scrap rate): at 10.6% that is roughly a 12% uplift on variable cost before margin. The reason to ask is not to argue the number down but to understand delivery risk &#8211; high and variable scrap shows up as short shipments and re-quoted lead times long before it shows up as a price increase.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">How do I ask for the number without sounding accusatory?<\/h3>\n<p style=\"margin: 0 0 18px;\">Ask by stage and by part number rather than as a company average: &#8220;for this part, what is your first pass yield at pour, at cleaning and at machining?&#8221; That framing makes the answer about the process instead of about blame, and it produces data you can act on. A supplier who cannot answer by stage has probably never split the number, which is useful to know.<\/p>\n\t\t<div data-elementor-type=\"section\" data-elementor-id=\"3550\" class=\"elementor elementor-3550\" data-elementor-post-type=\"elementor_library\">\n\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-19b1acf1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"19b1acf1\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;,&quot;ekit_has_onepagescroll_dot&quot;:&quot;yes&quot;}\">\n\t\t\t\t\t\t\t<div class=\"elementor-background-overlay\"><\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-56e26ed6\" data-id=\"56e26ed6\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-52c3d00c elementor-widget elementor-widget-elementskit-heading\" data-id=\"52c3d00c\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"elementskit-heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"ekit-wid-con\" ><div class=\"ekit-heading elementskit-section-title-wraper text_left   ekit_heading_tablet-   ekit_heading_mobile-\"><h3 class=\"ekit-heading--title elementskit-section-title\">\u00bfBusca una fundici\u00f3n de metales confiable en China?<\/h3><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24c75aa0 elementor-widget elementor-widget-text-editor\" data-id=\"24c75aa0\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Podemos ayudarte a optimizar el dise\u00f1o de tus productos y a reducir costos.<\/li><li>Podemos ayudarte con piezas de fundici\u00f3n de alta calidad y en grandes cantidades.<\/li><li>Podemos entregar a tiempo y conseguir m\u00e1s oportunidades en el mercado de ventas.<\/li><li>Te beneficiar\u00e1s del servicio de fundici\u00f3n de metales de Supro MFG.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-51a20937 elementor-align-left elementor-widget elementor-widget-global elementor-global-1143 elementor-widget-button\" data-id=\"51a20937\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm elementor-animation-grow\" href=\"https:\/\/chinametalfoundry.com\/es\/contacto\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Solicitar una cotizaci\u00f3n directa de f\u00e1brica <\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t\n<p class=\"sc-note\" style=\"font-size: 13px; color: #9a9a9a; margin: 28px 0 0;\">*Yield and cost figures are worked examples from Supro MFG shop-floor records; alloy classifications follow ASTM A536 and NADCA process guidance.<\/p>\n<\/article>","protected":false},"excerpt":{"rendered":"<p>A casting scrap rate of 10.6% is not a quality statistic sitting in a spreadsheet. On a machined 21.5 kg [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":8260,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[54],"tags":[47,50,49,42],"class_list":["post-8259","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-quality-processes","tag-casting-process","tag-casting-selection","tag-manufacturing-process","tag-metal-casting"],"_links":{"self":[{"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/posts\/8259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/comments?post=8259"}],"version-history":[{"count":4,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/posts\/8259\/revisions"}],"predecessor-version":[{"id":8281,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/posts\/8259\/revisions\/8281"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/media\/8260"}],"wp:attachment":[{"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/media?parent=8259"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/categories?post=8259"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/tags?post=8259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}