{"id":8056,"date":"2026-10-20T02:04:31","date_gmt":"2026-10-20T02:04:31","guid":{"rendered":"https:\/\/chinametalfoundry.com\/?p=8056"},"modified":"2026-10-20T02:04:31","modified_gmt":"2026-10-20T02:04:31","slug":"casting-payment-terms","status":"publish","type":"post","link":"https:\/\/chinametalfoundry.com\/es\/blog\/casting-payment-terms\/","title":{"rendered":"Casting Payment Terms: Deposits, Letters of Credit and Milestone Billing"},"content":{"rendered":"<article class=\"sc-article\" style=\"max-width: 820px; margin: 0 auto; font-family: 'Poppins',sans-serif; color: #7e7e7e; font-size: 16px; line-height: 1.7;\">\n<div class=\"sc-intro\" style=\"background: #F5F5F5; border-radius: 20px; padding: 22px 24px; font-style: italic; color: #3a3a3a; margin: 0 0 26px; line-height: 1.6;\">\n<p style=\"margin: 0;\">Most buyers treat <strong style=\"color: #273171;\">casting payment terms<\/strong> as a finance-department formality to be settled after the technical work is done. In practice those terms decide who finances ten weeks of molten metal, who absorbs the loss when a batch fails at your machining line, and how much leverage you still hold after the wire has gone out.<\/p>\n<\/div>\n<p style=\"margin: 0 0 18px;\">This guide breaks casting payment terms into cash rather than jargon. We work one real-size order all the way through \u2014 2,000 ductile iron pump housings with new tooling \u2014 and price each structure on the same basis: cash tied up, bank fees, and what happens when something goes wrong. Where a number depends on a standard, we name the standard. Industry practice references come from the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.afsinc.org\" target=\"_blank\" rel=\"noopener\">Sociedad Estadounidense de Fundici\u00f3n<\/a>, the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/www.nadca.com\" target=\"_blank\" rel=\"noopener\">North American Die Casting Association<\/a> and the ICC rules that govern documentary credits. If you are still at the quotation stage, read <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-rfq\/\" target=\"_blank\" rel=\"noopener\">what a foundry needs for an accurate quote<\/a> first \u2014 the schedule you are offered usually follows directly from how complete that package was.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p2-37-payment-terms-1.webp\" alt=\"Casting payment terms documents beside a raw and a machined ductile iron pump housing\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">A raw casting and a machined one look like one part to a purchasing system. They sit at opposite ends of the cash cycle.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Why Casting Payment Terms Are a Working-Capital Contract<\/h2>\n<p style=\"margin: 0 0 18px;\">A machine shop buys bar stock and cuts it. A foundry buys pig iron, scrap, ferroalloys, sand and binders, melts them, pours them, then waits weeks before the shape is cool enough to inspect. Most of the cost of a casting exists <strong style=\"color: #273171;\">before there is anything to ship<\/strong>, and almost none of it can be resold \u2014 a pattern, a core box and a poured casting are all single-customer assets. That is the fact that casting payment terms are built to manage.<\/p>\n<p style=\"margin: 0 0 18px;\">Take the order we use throughout this article. Two thousand pump housings, <strong style=\"color: #273171;\">18.0 kg net weight each<\/strong>, poured at a 62% yield so 29.0 kg of iron leaves the furnace for every good part \u2014 the alloy choice behind that number is unpacked in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/gray-iron-vs-ductile-iron\/\" target=\"_blank\" rel=\"noopener\">gray iron vs ductile iron<\/a>. Unit price $24.50 gives $49,000 of goods. New tooling \u2014 a pattern plate and two core boxes \u2014 adds $12,000. Total purchase order: <strong style=\"color: #273171;\">$61,000<\/strong>. Here is where that money physically has to go before a crate leaves the dock.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Cash out before shipment<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Amount<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Share of PO<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Resale value if you walk away<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tooling (pattern, core boxes)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$12,000<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">19.7%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Near zero \u2014 customer-specific<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Metal, sand, binders, melt energy<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$22,050<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">36.1%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Scrap value only<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Moulding, melting, shakeout labour and overhead<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$14,700<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">24.1%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">None<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Finishing, inspection, packing<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$2,450<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">4.0%<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">None<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">Total sunk before you receive anything<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">$51,200<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">83.9%<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">\u2014<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">That single figure \u2014 <strong style=\"color: #273171;\">84% of the order value committed before delivery<\/strong> \u2014 explains nearly every clause you will be asked to sign. It is also why the deposit conversation inside casting payment terms is not a negotiation about trust. It is a negotiation about who carries roughly $51,000 of illiquid, customer-specific inventory for ten weeks. The same arithmetic drives the clauses covered in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-tooling-cost\/\" target=\"_blank\" rel=\"noopener\">how casting tooling cost is amortised<\/a>, and it is the reason a supplier pushes back when you ask for volume without a schedule, as the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-minimum-order-quantity\/\" target=\"_blank\" rel=\"noopener\">MOQ arithmetic<\/a> shows from the other side. For the per-piece view of the same $24.50, see <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-cost-breakdown\/\" target=\"_blank\" rel=\"noopener\">\u00bfQu\u00e9 factores influyen en el costo de fundici\u00f3n?<\/a>.<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Tooling is the hardest cash.<\/strong> It is paid out first, it is the largest single line, and it is worthless to anyone but you. That is why it is usually billed 100% up front, separate from the goods.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Metal is bought before it is poured.<\/strong> A foundry holding your slot has committed to charge material at a price set before your PO was signed.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Labour is spent on the moulding line, not on the invoice.<\/strong> Once a job is scheduled the cost is incurred, whether or not the PO is later cancelled.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Finished goods are not general inventory.<\/strong> They cannot be redirected to another customer, so a cancelled order is a write-off rather than a stock transfer.<\/li>\n<\/ul>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Six Casting Payment Terms Structures You Will Be Offered<\/h2>\n<p style=\"margin: 0 0 18px;\">Almost every set of casting payment terms you are offered is one of these six, sometimes with a local variation. The columns that matter are not the percentages \u2014 they are <strong style=\"color: #273171;\">how much cash you pay before you have evidence the parts are good<\/strong>, and what document triggers the rest. The structure also shifts with the process: tooling-heavy routes such as <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/aluminum-die-casting-guide\/\" target=\"_blank\" rel=\"noopener\">fundici\u00f3n a presi\u00f3n de aluminio<\/a> y <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/permanent-mold-casting\/\" target=\"_blank\" rel=\"noopener\">permanent mould casting<\/a> push the tooling line up and the deposit with it, while <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/fundicion-en-arena-vs-fundicion-a-la-cera-perdida\/\" target=\"_blank\" rel=\"noopener\">sand casting versus investment casting<\/a> differ mostly in where the sample cost falls.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Structure (on $61,000)<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Paid at PO<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Paid before you see parts<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Trigger for the balance<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Where it is used<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">100% T\/T in advance<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$61,000<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$61,000<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">No balance<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Small orders, new counterparties, express tooling<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">50% deposit, 50% before shipment<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$30,500<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$61,000<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Copy of bill of lading<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">First order with a new foundry<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">30% deposit, 70% before shipment<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$18,300<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$61,000<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Copy of bill of lading<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Default after the first order<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tooling 100% + goods 30\/70<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$26,700<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$61,000<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">B\/L, billed separately from tooling<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Any programme with new tooling<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Letter of credit at sight<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$61,000<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Compliant documents at the bank<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Orders above roughly $50,000, new counterparty<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Open account 30 \/ 60 days<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">30 or 60 days after bill of lading date<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Repeat supplier with a clean record<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">One thing these casting payment terms all share: <strong style=\"color: #273171;\">you have paid the full $61,000 before the crate reaches your door<\/strong>. The deposit changes when, not whether. So the real question is not &#8220;how much deposit&#8221; but &#8220;what evidence do I get before each tranche&#8221; \u2014 which is what milestone billing answers below.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">What the Money Actually Costs<\/h2>\n<p style=\"margin: 0 0 18px;\">Casting payment terms look like a percentage until you price the money. Credit is never free \u2014 it is only priced somewhere else. To compare structures fairly we price both sides&#8217; capital at <strong style=\"color: #273171;\">10% a year<\/strong> and use one timeline: $12,000 of tooling leaves on day 0, the $39,200 of goods spend is spread evenly across a 10-week (70-day) build, and the shipment lands at the far end. Deposit structures pay the balance on day 70, a letter of credit settles around day 75 once documents are presented, and open account 30 pays on day 105. Re-run it with your own cost of capital and your supplier&#8217;s \u2014 the ranking will not change much.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Structure<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Supplier&#8217;s carrying cost<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Your cash tied up<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Bank charges<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Total cost<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">% of PO<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">T\/T 30\/70<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$265<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$351 (deposit, 70 days)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$25\u201345<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$641\u2013661<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.05\u20131.08%<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">T\/T 50\/50<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$105<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$585 (deposit, 70 days)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$40\u201370<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$730\u2013760<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.20\u20131.25%<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">100% T\/T in advance<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$1,170 (full PO, 70 days)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$30<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$1,200<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.97%<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Open account 30<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$1,097<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$25\u201345<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$1,122\u20131,142<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.84\u20131.87%<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Letter of credit at sight<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$676<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$0<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$400\u2013650<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$1,076\u20131,326<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1.76\u20132.17%<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Two conclusions fall out of that table, and both are counter-intuitive. If you are comparing two suppliers, this is the arithmetic that separates a real concession from a cosmetic one. First, <strong style=\"color: #273171;\">30\/70 is the cheapest arrangement overall at about 1.1% of PO value<\/strong>, cheaper than the structure that looks most buyer-friendly. Second, <strong style=\"color: #273171;\">open account and letters of credit both land near 1.8\u20132.2%<\/strong> \u2014 the difference is only that OA hides the cost inside the unit price while the LC prints it on a bank statement. Which means the wrong move is &#8220;give me OA 30&#8221;. The right move is either to accept 30\/70 and ask for the roughly 0.8-point difference back in the unit price, or to accept OA and recognise you are already paying for it.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p2-37-payment-terms-2.webp\" alt=\"Casting payment terms milestone schedule on a foundry planning board beside a stencilled export crate\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">Milestones only work when each one is triggered by something you can hold in your hand.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Letters of Credit: What They Cover and What They Do Not<\/h2>\n<p style=\"margin: 0 0 18px;\">A documentary credit is the most misunderstood instrument in casting payment terms. The governing rules \u2014 UCP 600, published by the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/iccwbo.org\" target=\"_blank\" rel=\"noopener\">International Chamber of Commerce<\/a> \u2014 state plainly that banks deal with documents and not with goods, services or performance. A complying presentation gets paid <strong style=\"color: #273171;\">even if the castings in the container are scrap<\/strong>, because the bank never sees the castings.<\/p>\n<p style=\"margin: 0 0 18px;\">So an L\/C is a settlement tool, not a quality tool. Use it when counterparty risk is real and the order is large enough to justify the fees; use a quality gate when it is the parts you are worried about. The two combine well, which is exactly what the milestone structure below does.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">L\/C fee component<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Typical charge on our order<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Who usually pays<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Issuance, 0.15% with a $150 minimum<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$150 (the minimum bites before the percentage does)<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Buyer<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Advising and negotiation<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$60\u2013120<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Beneficiary, or as agreed<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Each amendment<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$40\u201380<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Whoever requested the change<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Discrepancy handling<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$80\u2013150 per presentation<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Usually deducted from the proceeds<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Courier and telex<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">$30\u201350<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">As agreed<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">Realistic total per shipment<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">$400\u2013650<\/strong><\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\"><strong style=\"color: #273171;\">0.66\u20131.07% of PO<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">Keep the document list short<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">Every extra document you demand is another chance for the presentation to be discrepant, and every discrepancy costs $80\u2013150 plus days of delay while the crate sits at the port. The list that keeps casting payment terms moving is short: signed commercial invoice, packing list, full set of bills of lading, and a certificate of inspection referencing the PO. Common causes of avoidable discrepancies are a required chamber attestation, an original the supplier cannot obtain in time, and a goods description copied from an early quotation that no longer matches the final PO. Keep whatever quality evidence you need <strong style=\"color: #273171;\">inside the certificate of inspection<\/strong> rather than scattered across separate certificates.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Milestone Billing That Ties Cash to Physical Gates<\/h2>\n<p style=\"margin: 0 0 18px;\">If you change one thing in your casting payment terms, make it this. Milestone billing is the structure that protects a buyer, because each payment is released by a physical event you can verify rather than by a calendar date. Here is the same $61,000 order split across four gates.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Gate<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Trigger<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Payment<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Evidence you should receive<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">M1 Tooling release<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">DFM signed off and tooling ordered<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">25% \u2014 $15,250<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tooling drawings and <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-mold-design-patterns\/\" target=\"_blank\" rel=\"noopener\">pattern design<\/a> output, tooling schedule, any <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-simulation\/\" target=\"_blank\" rel=\"noopener\">solidification simulation<\/a> result<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">M2 Sample approval<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">First article accepted in writing<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">25% \u2014 $15,250<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Full FAI or ISIR pack, CMM data, material test report<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">M3 Pre-shipment<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Production complete and inspection passed<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">45% \u2014 $27,450<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Dimensional report, NDT results, packing list<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">M4 Retention release<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">45 days after receipt, no open claims<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">5% \u2014 $3,050<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Closed claim log<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 18px;\">Gates rather than dates: that single change is the biggest upgrade most buyers can make to their casting payment terms. Two of the four matter most. M2 is where the whole programme is decided, and it should be paid only against a <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-first-article-inspection\/\" target=\"_blank\" rel=\"noopener\">first article inspection report that actually proves something<\/a> \u2014 not against a photograph of a good-looking part. M3 is where you confirm the production batch, and the evidence should be the same non-destructive and dimensional work described in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/metodos-de-inspeccion-de-piezas-fundidas\/\" target=\"_blank\" rel=\"noopener\">the buyer&#8217;s guide to casting inspection methods<\/a>, referenced to the tolerance class you specified under <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/guia-de-tolerancias-de-fundicion\/\" target=\"_blank\" rel=\"noopener\">ISO 8062<\/a>. If the part is new, M1 and M2 are usually served by <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/metal-prototype-casting-services\/\" target=\"_blank\" rel=\"noopener\">prototype castings<\/a> or a <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/3d-printing-prototype\/\" target=\"_blank\" rel=\"noopener\">printed pattern<\/a> before any production tooling is cut.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 26px 0 8px; text-transform: capitalize;\">What a retention really covers<\/h3>\n<hr style=\"width: 100px; height: 4px; background: #EF890D; border: none; border-radius: 2px; margin: 0 0 14px; line-height: 0; opacity: 1;\" \/>\n<p style=\"margin: 0 0 18px;\">Retention exists because the worst defects are the ones that only appear after you have machined them. On our order a 5% retention is $3,050. If 1.8% of the batch \u2014 36 pieces \u2014 turns out to be unsound at your machining line, you have lost $882 of castings plus roughly $30 each of machining already done, so $1,962. The retention covers it. Push the failure rate to 2.8% \u2014 56 pieces \u2014 and you are right at the $3,050 limit.<\/p>\n<p style=\"margin: 0 0 18px;\">Read that against your own history before you set the retention line in your casting payment terms. If your machining line typically finds 1% or less, 5% is plenty and asking for more simply adds cost to the price. If you are running a new geometry with known risk \u2014 see the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/defectos-comunes-en-la-fundicion-y-como-evitarlos\/\" target=\"_blank\" rel=\"noopener\">common casting defects guide<\/a> for which geometry produces which defect \u2014 ask for <strong style=\"color: #273171;\">10% for 60 days, or replacement in kind instead of cash<\/strong>. Replacement in kind is often easier for a foundry to accept than a larger hold-back, because it costs them variable cost rather than cash. And it is worth remembering that a defect found after machining costs both parties more than one found earlier, which is why <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-machining-allowance\/\" target=\"_blank\" rel=\"noopener\">machining allowance<\/a> belongs in the same conversation.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Currency, Bank Charges and the Clauses That Decide Who Pays<\/h2>\n<p style=\"margin: 0 0 18px;\">Three short clauses inside casting payment terms cause most of the disputes that follow a wire. They are one line each on the PO, and they all need to be written before money moves.<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Charge code: OUR, SHA or BEN.<\/strong> OUR means you pay every bank in the chain and the supplier receives the full invoiced amount. SHA splits them. BEN deducts everything from the proceeds, which is how a $61,000 payment arrives as $60,930 and starts an argument about who owes the difference. Write it on the PO.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Invoicing currency.<\/strong> If the quotation is in a currency that is not your own, the PO should say which currency is invoiced and, where a conversion is needed, where the rate comes from. Otherwise the exchange question gets settled at the worst possible moment \u2014 the mechanics are the same ones inside <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-cost-breakdown\/\" target=\"_blank\" rel=\"noopener\">material-index and currency clauses<\/a>.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Beneficiary identity.<\/strong> The account must carry the legal name of the entity on the PO and on the quality documents. A request to pay a different company, or a personal account, is a stop-work signal regardless of how good the price was.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">One more timing point catches buyers out: shipping documents are released against the balance payment, so the <strong style=\"color: #273171;\">payment date and the delivery schedule are the same schedule<\/strong>. Cross-check any shipment date against the stage breakdown in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-lead-time\/\" target=\"_blank\" rel=\"noopener\">how casting lead time is built<\/a>, and remember that the crating step at the end has its own cost line, as covered in <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-packaging\/\" target=\"_blank\" rel=\"noopener\">export crating and freight damage control<\/a>.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Six Red Flags and the Counter for Each<\/h2>\n<p style=\"margin: 0 0 18px;\">Bad casting payment terms announce themselves before any money moves. Six of the signals are worth memorising.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Red flag<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Why it matters<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Counter<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">100% prepayment demanded by a supplier you have not qualified<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">You have no leverage left if the parts fail<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Cap it at 30%, tie it to the FAI gate, and finish supplier qualification first<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Deposit requested before any DFM or tooling drawing exists<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">You are funding a guess, and the tooling price moves afterwards<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Pay M1 only against an approved design review and a fixed tooling quote<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Terms changed after the PO is issued<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Usually a cash-flow problem or scope creep in disguise<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">The PO states the terms; any change needs a written amendment you sign<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">An L\/C loaded with documents the supplier cannot produce in time<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">It guarantees discrepancy fees and days of demurrage<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Four documents only, with inspection evidence inside one certificate<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Open account requested on the first order<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">You are being asked to finance a supplier with no record<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Make it earned: three to six clean on-time deliveries first<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Beneficiary name differs from the entity on the PO<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">The classic payment-fraud pattern, and it voids your paper trail<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Stop the payment and confirm the legal entity in writing<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Five Levers That Improve Your Terms Without a Fight<\/h2>\n<p style=\"margin: 0 0 18px;\">Improving casting payment terms is a trade, not a demand. Each of these gives the supplier something they want in exchange for something you want.<\/p>\n<ul style=\"margin: 0 0 18px; padding-left: 22px;\">\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Split the tooling instead of prepaying it.<\/strong> Rather than 100% up front, ask for 50% at tooling order and 50% on sample approval. If the supplier will not move, ask to <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-tooling-cost\/\" target=\"_blank\" rel=\"noopener\">amortise the tooling into the unit price<\/a> over the first year&#8217;s volume \u2014 that turns a cash cliff into a per-piece cost you can compare across quotations. Our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/casting-molds-making\/\" target=\"_blank\" rel=\"noopener\">pattern and mould making<\/a> work is quoted either way.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Trade the deposit for a quality gate.<\/strong> &#8220;I will accept 50% up front if the second 50% is released by sample approval rather than by a date.&#8221; Most foundries take that, because it costs them nothing while their process is under control.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Use a blanket PO with releases.<\/strong> For a running part, issue an annual quantity and release monthly. You pay for what is released and the supplier gets the forecast they need to book capacity, spreading working capital across twelve payments instead of one. It works best where quantity is genuinely predictable, which is the same discipline the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-minimum-order-quantity\/\" target=\"_blank\" rel=\"noopener\">MOQ arithmetic<\/a> rewards.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Ask for a stock-and-release buffer on high runners.<\/strong> The supplier holds six to eight weeks of finished stock and you pay on pull. Carrying charges typically run 1.0\u20131.5% per month of the held value: on a part running 6,000 a year, eight weeks of stock is about 923 pieces, roughly $22,600, so $230\u2013340 a month. Cheap against a line stoppage.<\/li>\n<li style=\"margin: 0 0 8px;\"><strong style=\"color: #273171;\">Take the early-payment discount if your cash is cheaper than theirs.<\/strong> Two percent for paying 50 days early is 14.6% annualised (2% \u00d7 365 \u00f7 50). Below that cost of capital, take it every time; above it, decline and keep the cash.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 18px;\">All five rest on the same logic, and none of them need goodwill. Casting payment terms improve when you bring something to the table: <strong style=\"color: #273171;\">every concession is paid for with evidence, schedule certainty or volume<\/strong>, never with goodwill. Suppliers price the first three and they price goodwill at zero.<\/p>\n<figure style=\"margin: 24px 0;\"><img decoding=\"async\" style=\"width: 100%; display: block; border-radius: 4px;\" src=\"https:\/\/chinametalfoundry.com\/wp-content\/uploads\/2026\/10\/p2-37-payment-terms-3.webp\" alt=\"Casting payment terms review with a printed inspection report, a caliper and two machined metal castings\" \/><figcaption style=\"font-size: 13px; color: #7e7e7e; text-align: center; margin-top: 8px;\">The cheapest quality gate is the one you release the money against.<\/figcaption><\/figure>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Casting Payment Terms Checklist for Your Next PO<\/h2>\n<p style=\"margin: 0 0 18px;\">Ten lines, all written before the PO is signed. If one is missing, expect to negotiate it later from a weaker position.<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 18px 0 24px; font-size: 15px; color: #333333;\">\n<thead>\n<tr>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">#<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">Line to write on the PO<\/th>\n<th style=\"background: #273171; color: #ffffff; padding: 12px 14px; text-align: left; font-weight: 600; border: 1px solid #273171;\">What good looks like<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">1<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Goods and tooling billed separately<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Two line items, two schedules, a separate ownership clause<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">2<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Payment structure named<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">&#8220;30% deposit, 70% before shipment&#8221; \u2014 not &#8220;as agreed&#8221;<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">3<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Each tranche tied to a physical gate<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Tooling order \/ sample approval \/ pre-shipment inspection \/ retention<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">4<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Retention percentage and release date<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">5\u201310%, released 30\u201360 days after receipt against a claim log<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">5<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Documents required for the balance payment<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Invoice, packing list, bill of lading, certificate of inspection<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">6<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Charge code<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">OUR or SHA stated; BEN avoided<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">7<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Invoicing currency<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">One currency named, with the rate source if a conversion is needed<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">8<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Beneficiary legal name and account<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Matches the entity on the PO and on the quality documents<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">9<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Quality evidence attached to a gate, not a promise<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">FAI pack at M2, dimensional and NDT report at M3<\/td>\n<\/tr>\n<tr style=\"background: #F5F5F5;\">\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">10<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Change and cancellation rule<\/td>\n<td style=\"border: 1px solid #E5E5E5; padding: 10px 14px;\">Written amendment only; cancellation settles work in progress at cost<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Preguntas frecuentes<\/h2>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Is a 30% deposit normal in casting payment terms?<\/h3>\n<p style=\"margin: 0 0 18px;\">Yes \u2014 it is the most common structure for a second or later order. For a first order with new tooling, expect the tooling to be billed 100% up front on top of it, which puts total up-front payment nearer 50%. Before you agree to the tooling number, the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/casting-tooling-cost\/\" target=\"_blank\" rel=\"noopener\">tooling cost breakdown<\/a> gives the ranges by process.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Can I get open account on the first order?<\/h3>\n<p style=\"margin: 0 0 18px;\">Rarely, and you should not push for it. Open account is the second most expensive arrangement once financing is counted \u2014 about 1.9% of PO value on our worked example \u2014 and with an unqualified supplier you carry counterparty risk on top. Earn it after three to six clean deliveries, and expect the credit cost to be built into the price.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Should tooling be paid separately from the parts?<\/h3>\n<p style=\"margin: 0 0 18px;\">Almost always, yes \u2014 it is a different asset with a different life and a different owner. Either you buy it outright and own it, or the supplier holds it and amortises it into the unit price. The first is better if the programme will run for years, the second if you are unsure of volume; either way, get ownership and refurbishment responsibility in writing.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Who pays the letter of credit fees?<\/h3>\n<p style=\"margin: 0 0 18px;\">Whoever the PO says, so say it. Convention is that the buyer pays issuance and the beneficiary pays advising and negotiation, but the only reliable arrangement is the written one. On a $61,000 order the total is $400\u2013650, and arguing about it afterwards costs more than the fee.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">What if a supplier insists on 100% prepayment?<\/h3>\n<p style=\"margin: 0 0 18px;\">It is normal for small orders and express tooling jobs, and reasonable when the tooling has no alternative use. For a production order from a supplier you have not qualified, treat it as a signal rather than a habit: cap the exposure, tie release to a documented sample approval, or use a documentary credit. If the requirement appears only after you have signed, that is a different problem.<\/p>\n<h3 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 20px; font-weight: 600; line-height: 1.4; margin: 22px 0 8px;\">Do casting payment terms change with order size?<\/h3>\n<p style=\"margin: 0 0 18px;\">They do, and usually in your favour. Small orders carry a fixed transaction cost that makes deposits and 100% prepayment normal; once a programme is running, that cost is amortised and the supplier has a reason to offer milestones or credit. The volume threshold where it turns is the same one that governs minimum quantities, which is why the two conversations are really one.<\/p>\n<h2 style=\"font-family: 'Poppins',sans-serif; color: #273171; font-size: 25px; font-weight: 600; line-height: 1.3; margin: 34px 0 14px; padding: 4px 0 4px 30px; background: linear-gradient(to right, #ff512f 0px, #dd2476 5px, transparent 5px);\">Where to Start<\/h2>\n<p style=\"margin: 0 0 18px;\">If you are comparing suppliers, casting payment terms are worth three written questions rather than a debate over the percentage. Ask each one three questions and compare the answers in writing: <strong style=\"color: #273171;\">what triggers each payment, what evidence arrives with it, and what happens when a part fails at your machining line<\/strong>. A foundry that answers crisply has usually thought about its own working capital, which tells you more than the terms sheet does. Our <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/fundicion-en-arena\/\" target=\"_blank\" rel=\"noopener\">fundici\u00f3n en arena<\/a>, <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/fundicion-a-la-cera-perdida\/\" target=\"_blank\" rel=\"noopener\">fundici\u00f3n a la cera perdida<\/a> y <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/servicios-de-fundicion-a-presion\/\" target=\"_blank\" rel=\"noopener\">fundici\u00f3n a presi\u00f3n<\/a> programmes run on the milestone structure above, with downstream <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/cnc-machining-services\/\" target=\"_blank\" rel=\"noopener\">Mecanizado CNC<\/a>, <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/heat-treatment-services\/\" target=\"_blank\" rel=\"noopener\">tratamiento t\u00e9rmico<\/a> y <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/surface-treatment-services\/\" target=\"_blank\" rel=\"noopener\">surface treatment<\/a> quoted the same way. For the wider picture of how a casting programme fits together, start with the <a style=\"color: #086ad4; text-decoration: none;\" href=\"https:\/\/chinametalfoundry.com\/es\/blog\/guia-de-fundicion-de-metales\/\" target=\"_blank\" rel=\"noopener\">Gu\u00eda de fundici\u00f3n de metales<\/a>.<\/p>\n\t\t<div data-elementor-type=\"section\" data-elementor-id=\"3550\" class=\"elementor elementor-3550\" data-elementor-post-type=\"elementor_library\">\n\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-19b1acf1 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"19b1acf1\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;,&quot;ekit_has_onepagescroll_dot&quot;:&quot;yes&quot;}\">\n\t\t\t\t\t\t\t<div class=\"elementor-background-overlay\"><\/div>\n\t\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-56e26ed6\" data-id=\"56e26ed6\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-52c3d00c elementor-widget elementor-widget-elementskit-heading\" data-id=\"52c3d00c\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"elementskit-heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"ekit-wid-con\" ><div class=\"ekit-heading elementskit-section-title-wraper text_left   ekit_heading_tablet-   ekit_heading_mobile-\"><h3 class=\"ekit-heading--title elementskit-section-title\">\u00bfBusca una fundici\u00f3n de metales confiable en China?<\/h3><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-24c75aa0 elementor-widget elementor-widget-text-editor\" data-id=\"24c75aa0\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li>Podemos ayudarte a optimizar el dise\u00f1o de tus productos y a reducir costos.<\/li><li>Podemos ayudarte con piezas de fundici\u00f3n de alta calidad y en grandes cantidades.<\/li><li>Podemos entregar a tiempo y conseguir m\u00e1s oportunidades en el mercado de ventas.<\/li><li>Te beneficiar\u00e1s del servicio de fundici\u00f3n de metales de Supro MFG.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-51a20937 elementor-align-left elementor-widget elementor-widget-global elementor-global-1143 elementor-widget-button\" data-id=\"51a20937\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;ekit_we_effect_on&quot;:&quot;none&quot;}\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm elementor-animation-grow\" href=\"https:\/\/chinametalfoundry.com\/es\/contacto\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Solicitar una cotizaci\u00f3n directa de f\u00e1brica <\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t\n<p class=\"sc-note\" style=\"font-size: 13px; color: #9a9a9a; margin: 28px 0 0;\">*Structures and fee ranges referenced from ICC UCP 600 practice, AFS and NADCA industry publications, and Supro MFG commercial records. Figures in the worked example are illustrative for a 2,000-piece ductile iron order and vary with part geometry, alloy and volume.<\/p>\n<\/article>","protected":false},"excerpt":{"rendered":"<p>Most buyers treat casting payment terms as a finance-department formality to be settled after the technical work is done. In [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":8057,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[51],"tags":[47,50,49,42],"class_list":["post-8056","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casting-processes","tag-casting-process","tag-casting-selection","tag-manufacturing-process","tag-metal-casting"],"_links":{"self":[{"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/posts\/8056","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/comments?post=8056"}],"version-history":[{"count":4,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/posts\/8056\/revisions"}],"predecessor-version":[{"id":8088,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/posts\/8056\/revisions\/8088"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/media\/8057"}],"wp:attachment":[{"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/media?parent=8056"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/categories?post=8056"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chinametalfoundry.com\/es\/wp-json\/wp\/v2\/tags?post=8056"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}